Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

NICORGAS/NGPL CDP

Natural Gas Pipeline (NGPL) · Loc 9258 · WILL, Illinois
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 27
0.592
Bcf/d scheduled
Δ Day-over-day
+0.017
vs Nov 26
7-day average
0.573
Bcf/d
30-day average
0.800
30 of 30 days posted
30-day high
1.312
Nov 6
30-day low
0.338
Nov 20
Operating capacity
2.763
Bcf/d as posted, evening cycle
Utilization
21%
headroom 79%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.000.501.001.50Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.592+0.017
Nov 260.575+0.046
Nov 250.529-0.078
Nov 240.607-0.143
Nov 230.750+0.275
Nov 220.475-0.006
Nov 210.481+0.143
Nov 200.338-0.004
Nov 190.343-0.022
Nov 180.364+0.023
Nov 170.342-0.270
Nov 160.611+0.028
Nov 150.583+0.002
Nov 140.581-0.099
Nov 130.680-0.277
Nov 120.958+0.235
Nov 110.723-0.041
Nov 100.764-0.395
Nov 91.159+0.004
Nov 81.155-0.000
Nov 71.155-0.157
Nov 61.312+0.082
Nov 51.229+0.113
Nov 41.116-0.002
Nov 31.117-0.058
Nov 21.175+0.104
Nov 11.071+0.019
Oct 311.052-0.021
Oct 301.073-0.018
Oct 291.091—
86 more days on file for this meter, back to August 4, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)NICORGAS/NGPL CDP

Natural Gas Pipeline (NGPL)Placed at the center of Will, IL — approximate; the exact meter site is not published.

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, NICORGAS/NGPL CDP (Natural Gas Pipeline (NGPL) loc 9258) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/ngpl/9258/