Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

IPLC/NGPL CDP

Natural Gas Pipeline (NGPL) · Loc 25250 · MAHASKA, Iowa
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 27
0.034
Bcf/d scheduled
Δ Day-over-day
-0.000
vs Nov 26
7-day average
0.036
Bcf/d
30-day average
0.031
30 of 30 days posted
30-day high
0.038
Nov 24
30-day low
0.023
Oct 31
Operating capacity
0.082
Bcf/d as posted, evening cycle
Utilization
41%
headroom 59%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0100.0200.0300.040Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.034-0.000
Nov 260.034-0.004
Nov 250.037-0.001
Nov 240.038+0.001
Nov 230.037+0.002
Nov 220.036+0.002
Nov 210.034+0.000
Nov 200.033-0.001
Nov 190.034-0.001
Nov 180.035+0.000
Nov 170.035-0.002
Nov 160.036+0.001
Nov 150.035+0.000
Nov 140.035+0.005
Nov 130.030+0.003
Nov 120.027+0.001
Nov 110.026+0.000
Nov 100.026-0.007
Nov 90.033+0.002
Nov 80.031+0.001
Nov 70.031-0.001
Nov 60.032+0.001
Nov 50.031+0.000
Nov 40.031+0.002
Nov 30.029+0.003
Nov 20.026+0.001
Nov 10.025+0.002
Oct 310.023-0.002
Oct 300.024-0.000
Oct 290.024—
85 more days on file for this meter, back to August 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)IPLC/NGPL CDP

Natural Gas Pipeline (NGPL)Placed at the center of Mahaska, IA — approximate; the exact meter site is not published.

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, IPLC/NGPL CDP (Natural Gas Pipeline (NGPL) loc 25250) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/ngpl/25250/