NIPSCO/NGPL CDP

Natural Gas Pipeline (NGPL) · Loc 909260 · COOK, Illinois
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.551
Bcf/d scheduled
Δ Day-over-day
-0.183
vs Nov 25
7-day average
0.533
Bcf/d
30-day average
0.538
30 of 30 days posted
30-day high
0.734
Nov 25
30-day low
0.349
Oct 30
Operating capacity
0.992
Bcf/d as posted, evening cycle
Utilization
56%
headroom 44%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.000.200.400.600.80Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.551-0.183
Nov 250.734+0.054
Nov 240.681+0.148
Nov 230.532+0.122
Nov 220.410-0.017
Nov 210.427+0.028
Nov 200.398-0.073
Nov 190.471+0.026
Nov 180.446-0.086
Nov 170.532-0.154
Nov 160.686+0.016
Nov 150.670-0.006
Nov 140.676-0.033
Nov 130.709+0.119
Nov 120.590+0.013
Nov 110.577+0.086
Nov 100.491-0.078
Nov 90.569-0.004
Nov 80.573-0.001
Nov 70.574-0.012
Nov 60.586+0.079
Nov 50.507+0.061
Nov 40.446-0.075
Nov 30.521-0.043
Nov 20.565-0.002
Nov 10.566+0.191
Oct 310.375+0.026
Oct 300.349-0.098
Oct 290.447-0.041
Oct 280.488—
84 more days on file for this meter, back to August 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)NIPSCO/NGPL CDP

Natural Gas Pipeline (NGPL)Placed at the center of Cook, IL — approximate; the exact meter site is not published.

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, NIPSCO/NGPL CDP (Natural Gas Pipeline (NGPL) loc 909260) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/ngpl/909260/