Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

NO SHORE/NGPL CDP

Natural Gas Pipeline (NGPL) · Loc 9254 · LAKE, Illinois
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.113
Bcf/d scheduled
Δ Day-over-day
-0.008
vs Nov 25
7-day average
0.104
Bcf/d
30-day average
0.089
30 of 30 days posted
30-day high
0.175
Nov 13
30-day low
0.036
Oct 28
Operating capacity
0.284
Bcf/d as posted, evening cycle
Utilization
40%
headroom 60%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.000.050.100.150.20Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.113-0.008
Nov 250.121-0.022
Nov 240.142+0.031
Nov 230.111+0.008
Nov 220.104+0.035
Nov 210.068+0.003
Nov 200.065-0.009
Nov 190.074-0.009
Nov 180.083-0.013
Nov 170.097-0.016
Nov 160.112-0.005
Nov 150.117+0.003
Nov 140.114-0.061
Nov 130.175+0.050
Nov 120.125+0.026
Nov 110.099+0.014
Nov 100.085+0.012
Nov 90.073-0.006
Nov 80.079-0.016
Nov 70.095-0.002
Nov 60.096+0.020
Nov 50.076+0.015
Nov 40.060+0.001
Nov 30.059+0.005
Nov 20.055-0.006
Nov 10.061+0.001
Oct 310.060+0.006
Oct 300.054+0.007
Oct 290.047+0.010
Oct 280.036—
85 more days on file for this meter, back to August 4, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)NO SHORE/NGPL CDP

Natural Gas Pipeline (NGPL)Placed at the center of Lake, IL — approximate; the exact meter site is not published.

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, NO SHORE/NGPL CDP (Natural Gas Pipeline (NGPL) loc 9254) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/ngpl/9254/