Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

BHSC/NGPL CDP

Natural Gas Pipeline (NGPL) · Loc 41074 · OTOE, Nebraska
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.022
Bcf/d scheduled
Δ Day-over-day
-0.001
vs Nov 25
7-day average
0.024
Bcf/d
30-day average
0.023
30 of 30 days posted
30-day high
0.039
Nov 12
30-day low
0.011
Oct 28
Operating capacity
0.091
Bcf/d as posted, evening cycle
Utilization
24%
headroom 76%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0100.0200.0300.040Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.022-0.001
Nov 250.023+0.000
Nov 240.023-0.015
Nov 230.038+0.013
Nov 220.025+0.004
Nov 210.021+0.008
Nov 200.013-0.013
Nov 190.025+0.007
Nov 180.018-0.006
Nov 170.024+0.001
Nov 160.023-0.001
Nov 150.024+0.000
Nov 140.024-0.015
Nov 130.039-0.000
Nov 120.039+0.014
Nov 110.025+0.000
Nov 100.025+0.000
Nov 90.025-0.001
Nov 80.026+0.002
Nov 70.024-0.001
Nov 60.025-0.001
Nov 50.026+0.000
Nov 40.026-0.000
Nov 30.026+0.012
Nov 20.014-0.001
Nov 10.015+0.003
Oct 310.012+0.000
Oct 300.011-0.000
Oct 290.011+0.000
Oct 280.011—
84 more days on file for this meter, back to August 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)BHSC/NGPL CDP

Natural Gas Pipeline (NGPL)Placed at the center of Otoe, NE — approximate; the exact meter site is not published.

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, BHSC/NGPL CDP (Natural Gas Pipeline (NGPL) loc 41074) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/ngpl/41074/