Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

PGLC/NGPL CDP

Natural Gas Pipeline (NGPL) · Loc 909285 · COOK, Illinois
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 27
0.616
Bcf/d scheduled
Δ Day-over-day
-0.016
vs Nov 26
7-day average
0.560
Bcf/d
30-day average
0.445
30 of 30 days posted
30-day high
0.709
Nov 24
30-day low
0.229
Oct 29
Operating capacity
0.975
Bcf/d as posted, evening cycle
Utilization
63%
headroom 37%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.000.200.400.600.80Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.616-0.016
Nov 260.632+0.030
Nov 250.603-0.106
Nov 240.709+0.128
Nov 230.581+0.126
Nov 220.455+0.132
Nov 210.323-0.058
Nov 200.382-0.001
Nov 190.383-0.042
Nov 180.425-0.102
Nov 170.526-0.034
Nov 160.560-0.015
Nov 150.575+0.005
Nov 140.570-0.024
Nov 130.595+0.073
Nov 120.522+0.000
Nov 110.522+0.154
Nov 100.368-0.016
Nov 90.384+0.000
Nov 80.384+0.000
Nov 70.384-0.041
Nov 60.425+0.052
Nov 50.373+0.030
Nov 40.343+0.019
Nov 30.324+0.013
Nov 20.311+0.000
Nov 10.311+0.038
Oct 310.273+0.019
Oct 300.253+0.025
Oct 290.229—
85 more days on file for this meter, back to August 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)PGLC/NGPL CDP

Natural Gas Pipeline (NGPL)Placed at the center of Cook, IL — approximate; the exact meter site is not published.

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, PGLC/NGPL CDP (Natural Gas Pipeline (NGPL) loc 909285) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/ngpl/909285/