Today’s brief · gas day Nov 12
0.799 Bcf/d of pipeline capacity is offline on gas day Nov 12, up 0.400 from Nov 11, mostly because Sabine Pass Gillis station went offline (0.400). The largest are Sabine Pass Gillis station (0.400) and CGT Hampshire station (0.391). 12 more outages have no posted volume. Over the next 7 days, 1 outage is due back and nothing new is scheduled.
Largest outages now
- Sabine Pass Gillis station0.400bearish · planned · until Nov 21
- CGT Hampshire station0.391bullish · planned · until Nov 25
- Tallgrass Energy Bertrand station0.008bullish · unplanned · no end date posted
- Great Lakes Richfield~0.029 est.bullish · unplanned · until Dec 1
- ANR UPDATED: CAPACITY REDUCTION Southwest Ma…no volumebullish · planned · until Dec 18
- Colorado Interstate Gas Segment 164 Cheyenne Westno volumebearish · unplanned · until Dec 31
- +9 more in the calendar below
Since Nov 11
- Sabine Pass Gillis station0.400New · until Nov 21
- NGPL Amarillo 2 Mainlineno volumeNew · until Nov 30
Next 7 days (to Nov 19)
- Kinder Morgan Louisiana Pipeline CS 760no volumeDue back · posted end Nov 12
Volumes are what the pipeline posted (or derived from a posted cap); “est.” marks an estimate from a drop in posted capacity. Dates are the pipeline’s own, not forecasts. Click any line for its notices.
Capacity offline by day
Quantified Bcf/d in effect each gas day, stacked by market side. Bars left of today are reconstructed from each event's posted window; dots mark what the ledger actually recorded that morning. Bars right of today are posted schedules, not forecasts.
Where capacity is offline
One marker per event in effect or scheduled, sized by Bcf/d and colored by market side; green rings are events lifted in the last seven days. Hollow markers are unquantified or ceiling-only. Markers sit at the compressor station, plant or terminal named in the notice where we have its location (HIFLD), otherwise on the pipeline’s line; dashed lines are schematic routes. Hover a marker for a summary and click it for the notices; hover a line to see the system, click it to filter the calendar.
Outage calendar
Click any bar for the event's notice chain and permalinks. Open-ended bars fade out at the right edge: the pipeline has not posted a return date.
In-effect detail
Every event currently in effect, with the figure's basis. Ceiling-only postings show the remaining capacity, never a reduction, and are not in any total.