Every notice is read by AI and scored 1–5 for market impact, with direction, volume and reroute potential.
Every pipeline notice detected by Enercast is evaluated by an AI model and assigned a severity score from 1 to 5. The score reflects the expected market impact of the event — specifically its potential to affect regional basis differentials, physical supply availability, and Henry Hub price direction over the following 1–5 trading days.
Scores are generated automatically within seconds of a notice being detected. They are not guaranteed to be accurate and should be treated as a starting point for analysis, not a definitive assessment.
The AI model considers the following factors when assigning a severity score:
In addition to the severity score, each alert includes a plain-language trading note that identifies the most likely market implication. Trading notes cover:
Columbia Gulf Transmission posted this on October 20, 2026 about maintenance a week later. Highlighted is what matters:
Notice what Enercast did that the posting does not: it converted Dth to Bcf/d, turned a capacity setting into a reduction (and labeled it derived), worked out which way the price moves and why, and judged whether the gas can go elsewhere. The event then appears on the Capacity Offline calendar for October 27–28.
Labeled by how it was obtained: stated (the pipeline posted the cut), derived (posted cap subtracted from posted prior or design capacity) or ~est. (the drop in posted operating capacity, when the notice gives no volume). A ceiling alone is shown but never counted as a loss.
Bullish when supply is stranded (production, processing, imports); bearish when demand is cut (LNG feedgas, citygates, power plants); neutral or regional when the effect stays in basis. The regional line names the trading points.
High, Moderate, Limited or None: whether other pipelines can carry the displaced gas. The same Bcf/d matters more when reroute is limited.
Pipelines revise notices often. Enercast keeps every revision and shows the latest; the capacity ledger follows the dates forward and closes the event when the lift posts.
AI-generated scores and trading notes are produced automatically and may contain errors. Pipeline notices can be ambiguous, and the true market impact of any event depends on factors not visible in the notice text alone — including real-time flow data, storage levels, weather, and market positioning. Always apply independent judgment before acting on any Enercast alert.
Enercast does not guarantee the accuracy, completeness, or timeliness of any score, summary, or trading note. See the Disclaimer for full terms.
Pipeline operators frequently revise notices — sometimes dozens of times for a single event. Enercast tracks revisions and suppresses duplicate alerts for the same underlying event unless a material change is detected (e.g., a significant change in capacity volume or a status change from planned to force majeure). The latest revision is always displayed on the website.
The Supply & Demand pages follow a separate principle: every figure is a posted scheduled quantity, never a scaled estimate. That methodology is described at Posted Quantities, Not Estimates.
The website shows every active notice with its score and summary, refreshed several times a day; free email/Telegram alerts cover severity 4–5 with a one-hour delay. Pro gets real-time alerts within ~2 minutes of posting, with the full AI trading note. Compare →
It is the AI’s read of market impact: 5 is a major event (force majeure, a large unplanned outage on a bottleneck), 1 is a routine bulletin. The full scale and scoring inputs.
Each notice gets a one-sentence directional implication referencing specific basis points (e.g. Transco Zone 4, Henry Hub, Waha) and capacity in Bcf/d.
All major U.S. interstate natural gas pipelines including Transco, FGT, EPNG, TGP, REX, SNG, CGT, Gulf South, Tallgrass, and more — 192 monitored in all. See all pipelines.
Coverage today is limited to FERC-jurisdictional interstate pipelines. Intrastate expansion is on the roadmap.
Pipelines revise notices often, sometimes dozens of times for one event. Enercast keeps every revision, shows the latest on the website, and only re-alerts when something material changes.
More questions? See the general FAQ (plans, timing, access) or email support@enercast.com.
More guides: How Enercast works · Capacity offline · Supply & demand · Getting alerts · Glossary