How Critical Notices Are Scored

Every notice is read by AI and scored 1–5 for market impact, with direction, volume and reroute potential.

Overview

Every pipeline notice detected by Enercast is evaluated by an AI model and assigned a severity score from 1 to 5. The score reflects the expected market impact of the event — specifically its potential to affect regional basis differentials, physical supply availability, and Henry Hub price direction over the following 1–5 trading days.

Scores are generated automatically within seconds of a notice being detected. They are not guaranteed to be accurate and should be treated as a starting point for analysis, not a definitive assessment.

The Severity Scale

Scoring Inputs

The AI model considers the following factors when assigning a severity score:

Trading Notes

In addition to the severity score, each alert includes a plain-language trading note that identifies the most likely market implication. Trading notes cover:

How to read a notice: a real example

Columbia Gulf Transmission posted this on October 20, 2026 about maintenance a week later. Highlighted is what matters:

What the pipeline posted (excerpt)
Subject: Lake Arthur Compressor Station Maintenance (4246), October 27–28, 2026

Columbia Gulf Transmission, LLC (CGT) reminds customers of upcoming maintenance at Lake Arthur Compressor Station beginning Tuesday, October 27, 2026, through Wednesday, October 28, 2026. As a result, the delivery capacity at Cameron LNG (4246) will be reduced to 700,000 Dth (Primary Only) effective Timely Cycle for Gas Day October 27, 2026. CGT anticipates this restriction may result in curtailments to Interruptible, Secondary Firm, and Primary Firm services.

4246 · Estimated Capacity Setting: 700,000 · Design Capacity: 800,000 Dth
What Enercast adds
Severity
4 / 5 significant: an LNG feedgas cut with primary-firm curtailment risk
Event type
Planned maintenance
Facility
Lake Arthur compressor station → Cameron LNG delivery point (loc 4246)
Window
Gas days Oct 27–28
Capacity
0.100 Bcf/d derived: 800,000 design − 700,000 posted cap
Direction
bearish Henry Hub & Gulf Coast basis: gas that cannot be exported stays in the U.S.
Reroute
Limited: feedgas for this terminal can only arrive on the pipelines that serve it
Trading note: CGT maintenance cuts Cameron LNG feed gas delivery cap by 0.100 Bcf/d (0.800 to 0.700 Bcf/d) on Oct 27–28 with explicit Primary Firm curtailment risk; gas that cannot be exported stays domestic, bearish for Henry Hub and Gulf Coast basis over the two-day window.

Notice what Enercast did that the posting does not: it converted Dth to Bcf/d, turned a capacity setting into a reduction (and labeled it derived), worked out which way the price moves and why, and judged whether the gas can go elsewhere. The event then appears on the Capacity Offline calendar for October 27–28.

Field guide

Event type

Capacity (Bcf/d)

Labeled by how it was obtained: stated (the pipeline posted the cut), derived (posted cap subtracted from posted prior or design capacity) or ~est. (the drop in posted operating capacity, when the notice gives no volume). A ceiling alone is shown but never counted as a loss.

Direction

Bullish when supply is stranded (production, processing, imports); bearish when demand is cut (LNG feedgas, citygates, power plants); neutral or regional when the effect stays in basis. The regional line names the trading points.

Reroute potential

High, Moderate, Limited or None: whether other pipelines can carry the displaced gas. The same Bcf/d matters more when reroute is limited.

Revisions and lifts

Pipelines revise notices often. Enercast keeps every revision and shows the latest; the capacity ledger follows the dates forward and closes the event when the lift posts.

Limitations

AI-generated scores and trading notes are produced automatically and may contain errors. Pipeline notices can be ambiguous, and the true market impact of any event depends on factors not visible in the notice text alone — including real-time flow data, storage levels, weather, and market positioning. Always apply independent judgment before acting on any Enercast alert.

Enercast does not guarantee the accuracy, completeness, or timeliness of any score, summary, or trading note. See the Disclaimer for full terms.

Duplicate and Revision Handling

Pipeline operators frequently revise notices — sometimes dozens of times for a single event. Enercast tracks revisions and suppresses duplicate alerts for the same underlying event unless a material change is detected (e.g., a significant change in capacity volume or a status change from planned to force majeure). The latest revision is always displayed on the website.

Supply & Demand Figures

The Supply & Demand pages follow a separate principle: every figure is a posted scheduled quantity, never a scaled estimate. That methodology is described at Posted Quantities, Not Estimates.

Free vs Pro

The website shows every active notice with its score and summary, refreshed several times a day; free email/Telegram alerts cover severity 4–5 with a one-hour delay. Pro gets real-time alerts within ~2 minutes of posting, with the full AI trading note. Compare →

Critical Notices FAQ

What does the 1–5 severity score mean?

It is the AI’s read of market impact: 5 is a major event (force majeure, a large unplanned outage on a bottleneck), 1 is a routine bulletin. The full scale and scoring inputs.

What’s in an AI trading note?

Each notice gets a one-sentence directional implication referencing specific basis points (e.g. Transco Zone 4, Henry Hub, Waha) and capacity in Bcf/d.

What pipelines are covered?

All major U.S. interstate natural gas pipelines including Transco, FGT, EPNG, TGP, REX, SNG, CGT, Gulf South, Tallgrass, and more — 192 monitored in all. See all pipelines.

Do you cover intrastate pipelines?

Coverage today is limited to FERC-jurisdictional interstate pipelines. Intrastate expansion is on the roadmap.

Why does a notice show several revisions?

Pipelines revise notices often, sometimes dozens of times for one event. Enercast keeps every revision, shows the latest on the website, and only re-alerts when something material changes.

More questions? See the general FAQ (plans, timing, access) or email support@enercast.com.