AMER IL/NGPL AM CDP

Natural Gas Pipeline (NGPL) · Loc 46594 · BUREAU, Illinois
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.072
Bcf/d scheduled
Δ Day-over-day
+0.006
vs Nov 25
7-day average
0.067
Bcf/d
30-day average
0.061
30 of 30 days posted
30-day high
0.072
Nov 26
30-day low
0.052
Nov 16
Operating capacity
0.150
Bcf/d as posted, evening cycle
Utilization
48%
headroom 52%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0200.0400.0600.080Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.072+0.006
Nov 250.066+0.004
Nov 240.062-0.005
Nov 230.068-0.002
Nov 220.070-0.001
Nov 210.070+0.011
Nov 200.060-0.000
Nov 190.060+0.005
Nov 180.055-0.002
Nov 170.057+0.005
Nov 160.052-0.001
Nov 150.053+0.000
Nov 140.053-0.006
Nov 130.059-0.006
Nov 120.064-0.000
Nov 110.064+0.005
Nov 100.059-0.009
Nov 90.068+0.000
Nov 80.068+0.000
Nov 70.068+0.014
Nov 60.054-0.005
Nov 50.059-0.000
Nov 40.059-0.001
Nov 30.060+0.001
Nov 20.059+0.000
Nov 10.059-0.002
Oct 310.061+0.000
Oct 300.061+0.002
Oct 290.059-0.002
Oct 280.060—
84 more days on file for this meter, back to August 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)AMER IL/NGPL AM CDP

Natural Gas Pipeline (NGPL)Placed at the center of Bureau, IL — approximate; the exact meter site is not published.

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, AMER IL/NGPL AM CDP (Natural Gas Pipeline (NGPL) loc 46594) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/ngpl/46594/