Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

AMER IL/NGPL GC CDP

Natural Gas Pipeline (NGPL) · Loc 46595 · PIATT, Illinois
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 27
0.075
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.076
Bcf/d
30-day average
0.056
30 of 30 days posted
30-day high
0.090
Nov 25
30-day low
0.031
Nov 5
Operating capacity
0.183
Bcf/d as posted, evening cycle
Utilization
41%
headroom 59%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0250.0500.0750.100Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.075+0.000
Nov 260.075-0.015
Nov 250.090+0.002
Nov 240.088+0.008
Nov 230.080+0.015
Nov 220.065+0.008
Nov 210.057+0.021
Nov 200.036-0.010
Nov 190.046-0.001
Nov 180.047-0.010
Nov 170.057-0.002
Nov 160.059+0.000
Nov 150.059+0.000
Nov 140.059-0.010
Nov 130.069-0.005
Nov 120.074+0.027
Nov 110.047-0.002
Nov 100.049-0.005
Nov 90.054+0.000
Nov 80.054+0.000
Nov 70.054+0.005
Nov 60.049+0.018
Nov 50.031-0.009
Nov 40.040+0.008
Nov 30.032-0.000
Nov 20.032-0.000
Nov 10.032-0.021
Oct 310.053-0.000
Oct 300.053-0.001
Oct 290.054—
85 more days on file for this meter, back to August 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)AMER IL/NGPL GC CDP

Natural Gas Pipeline (NGPL)Placed at the center of Piatt, IL — approximate; the exact meter site is not published.

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, AMER IL/NGPL GC CDP (Natural Gas Pipeline (NGPL) loc 46595) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/ngpl/46595/