Enercast — at the moment it matters
Home  /  Pipelines  /  El Paso Natural Gas (EPNG)

El Paso Natural Gas (EPNG)

133 active notices

Showing 133 notices
El Paso (EPNG)

[FORCE MAJEURE] Force Majeure – Casa Grande C Station

SEV 4/5
Force Majeure Until Further Notice 1 Days

EPNG has declared force majeure at Casa Grande C Compressor Station, effective 03/17/2026 at 11:41 AM with an expected restoration by 03/18/2026 at 9:00 AM. Casa Grande is located in Arizona on EPNG's westbound mainline, meaning this constraint affects gas movement from the Permian/Waha origin area toward SoCal Border and Arizona delivery points. No specific capacity volume was stated in the notice. Duration is approximately one day.

EPNG force majeure at Casa Grande C Station restricts westbound flow on the Permian-to-SoCal/Arizona corridor; expect bearish pressure at Waha as basin gas backs up and bullish pressure at SoCal Border and Arizona delivery points for the next ~22 hours.
Reroute: Moderate: Transwestern Pipeline (TW) is the primary competing westbound pipeline serving SoCal Border and Arizona markets and may absorb some displaced volumes, though available spare capacity on TW will determine how fully the constraint can be offset.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice ID: 627826
Notice Type: FORCE MAJEURE
Subtype: FORCE MAJEURE
Subject: Force Majeure – Casa Grande C Station
Posted: 03/17/2026 11:41:05AM
Effective: 03/17/2026 11:41:05AM
End Date: 03/18/2026 9:00:00AM
El Paso (EPNG)

[FORCE MAJEURE] Force Majeure - El Paso C Station

SEV 4/5
Force Majeure Until Further Notice 1 Days

EPNG has declared force majeure at El Paso C Station effective 04/15/2026 at 10:30 AM, with restoration expected by 04/16/2026 at 9:00 AM. El Paso C Station is a compressor station on the EPNG mainline in the El Paso/West Texas corridor, a key segment for westbound Permian Basin takeaway toward SoCal and Arizona. Duration is approximately 22.5 hours. No capacity volume is specified in the notice.

EPNG force majeure at El Paso C Station reduces westbound Permian takeaway capacity; expect bearish pressure at Waha as basin gas backs up and bullish pressure at SoCal Border and Arizona delivery points, though the short ~1-day duration limits sustained market impact.
Reroute: Moderate: Transwestern Pipeline (TW) serves overlapping SoCal Border and Arizona markets and is the primary reroute alternative; however, TW spare capacity at any given time may not fully absorb constrained EPNG volumes, particularly on short notice.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: FORCE MAJEURE
Subject: Force Majeure - El Paso C Station
Posted: 04/15/2026 10:30:41AM
Effective: 04/15/2026 10:30:41AM
End Date: 04/16/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[FORCE MAJEURE] FORCE MAJEURE-REMEDIATION-CS341-UP4

SEV 4/5
Force Majeure Until Further Notice 14 Days

EPNG has declared a force majeure at Compressor Station 341 (CS341), Unit 4, effective June 16, 2026 through June 30, 2026. CS341 is located on the EPNG mainline in the Southwest corridor, which handles Permian Basin outbound flows westward toward SoCal and Arizona delivery points. No specific capacity volume is stated in the notice. The event is unplanned and has a defined end date of June 30.

EPNG force majeure at CS341-UP4 reduces Permian outbound compression capacity; expect bearish pressure at Waha as basin gas backs up with no stated volume restriction, and bullish pressure at SoCal Border and Arizona delivery points as westbound supply is reduced.
Reroute: Moderate: Transwestern Pipeline (TW) is the primary competing pipeline for SoCal Border and Arizona deliveries and may absorb some diverted volumes, but reroute is not guaranteed to fully offset the constraint depending on the compression loss magnitude.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: FORCE MAJEURE
Subject: FORCE MAJEURE-REMEDIATION-CS341-UP4
Posted: 06/16/2026 3:58:26PM
Effective: 06/16/2026 3:58:26PM
End Date: 06/30/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[FORCE MAJEURE] Initial Force Majeure - Eunice C Station

SEV 4/5
Force Majeure Until Further Notice 1 Days

EPNG has declared force majeure at Eunice C Compressor Station effective 06/24/2026 at 7:04 AM, with an expected end date of 06/25/2026 at 9:00 AM. Eunice C Station is located in the Permian Basin corridor in southeastern New Mexico, a key compression point on EPNG's outbound mainline moving gas westward from Waha toward SoCal and Arizona delivery points. No specific capacity volume is stated in the notice. Duration is approximately one day.

EPNG force majeure at Eunice C Station constrains Permian takeaway westbound; expect bearish pressure at Waha as basin gas backs up, with bullish pressure at SoCal Border and Arizona delivery points -- monitor for capacity restoration by 09:00 AM 06/25.
Reroute: Moderate: Transwestern Pipeline (TW) is the primary competing pipeline serving SoCal border and Arizona delivery points from the Permian/San Juan Basin and can absorb some diverted volumes, but may lack sufficient spare capacity to fully offset an EPNG mainline compressor force majeure. Simultaneous TW constraint would eliminate California reroute entirely.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: FORCE MAJEURE
Subject: Initial Force Majeure - Eunice C Station
Posted: 06/24/2026 7:04:35AM
Effective: 06/24/2026 7:04:35AM
End Date: 06/25/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[OPERATIONAL FLOW ORDER] SOC Declaration - System Wide Pack

SEV 4/5
Operational Alert Until Further Notice 2 Days

EPNG has declared an Operational Flow Order (OFO) for a System-Wide Pack condition, effective immediately as of 06/29/2026 07:33 AM and running through 06/30/2026 09:00 AM. This is a fresh, first-revision notice indicating EPNG is requiring shippers to pack the system -- injecting more gas than is being withdrawn -- to restore system line pack across the entire pipeline. No specific capacity volume is stated, but a system-wide OFO on EPNG indicates significant operational stress across the full Permian-to-California corridor.

EPNG system-wide pack OFO signals immediate operational tightness on the full mainline corridor; expect bearish pressure at Waha as shippers are required to over-deliver into the system, with bullish pressure at SoCal Border and Arizona delivery points where supply availability is constrained.
Reroute: Moderate: Transwestern Pipeline (TW) is the primary competing pipeline for SoCal border deliveries and may absorb some volumes, but a system-wide EPNG OFO suggests broad infrastructure stress that TW alone is unlikely to fully offset.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: OPERATIONAL FLOW ORDER
Subject: SOC Declaration - System Wide Pack
Posted: 06/29/2026 7:33:55AM
Effective: 06/29/2026 7:33:55AM
End Date: 06/30/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[FORCE MAJEURE] Initial Force Majeure-Florida C Station

SEV 4/5
Force Majeure Until Further Notice 1 Days

EPNG has declared force majeure at Florida C Station effective 06/29/2026 at 11:21 AM, with an expected restoration by 06/30/2026 at 9:00 AM. Florida C is an internal EPNG tariff segment/compressor station designation in the Southwest/Texas-New Mexico corridor serving Permian outbound flows westward toward SoCal and Arizona -- not the state of Florida. No specific capacity volume was stated in the notice. Duration is approximately 22 hours.

EPNG force majeure at Florida C Station restricts Permian/Waha westbound takeaway; expect bearish pressure at Waha basis as gas backs up in the basin and bullish pressure at SoCal Border and Arizona delivery points as downstream supply tightens -- watch for basis widening on both ends through June 30 morning restoration.
Reroute: Moderate: Transwestern Pipeline (TW) serves the same SoCal border and Arizona delivery markets and may absorb displaced volumes, but TW spare capacity is variable and may not fully offset EPNG Florida C throughput loss. Simultaneous TW constraint would eliminate California reroute entirely.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: FORCE MAJEURE
Subject: Initial Force Majeure-Florida C Station
Posted: 06/29/2026 11:21:07AM
Effective: 06/29/2026 11:21:07AM
End Date: 06/30/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[OPERATIONAL FLOW ORDER] SOC System Wide Pack - Update #1

SEV 4/5
Operational Alert Until Further Notice 2 Days

EPNG has issued a system-wide Operational Flow Order (OFO) for line pack management, effective 06/30/2026 at 7:19 AM through 07/01/2026 at 9:00 AM. This is a system-wide pack OFO, meaning EPNG is requiring shippers to help maintain adequate line pressure across the entire system. No specific capacity volume restriction is stated in the notice.

EPNG system-wide pack OFO signals operational stress across the full Permian-to-California corridor; expect bearish pressure at Waha as gas cannot freely flow west, with offsetting bullish pressure at SoCal Border and Arizona delivery points where westbound supply is tightened.
Reroute: Moderate: Transwestern Pipeline (TW) is the primary competing pipeline for SoCal border deliveries and may absorb some diverted volumes, though a system-wide EPNG OFO typically reflects broad operational stress that TW alone cannot fully offset.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: OPERATIONAL FLOW ORDER
Subject: SOC System Wide Pack - Update #1
Posted: 06/30/2026 7:19:23AM
Effective: 06/30/2026 7:19:23AM
End Date: 07/01/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[OPERATIONAL FLOW ORDER] SOC Declaration - System Wide Draft

SEV 4/5
Operational Alert Until Further Notice 2 Days

EPNG has declared a System-Wide Operational Flow Order (SOC Declaration) effective immediately as of 07/07/2026 at 7:14 AM, running through 07/08/2026 at 9:00 AM. This is a system-wide draft OFO, meaning EPNG is experiencing operational stress across the full pipeline and is requiring shippers to take corrective action to balance the system. No specific capacity volume is cited in the notice.

EPNG system-wide OFO signals immediate operational stress on the primary Permian-to-California corridor; expect bearish pressure at Waha as gas backs up in the basin and bullish pressure at SoCal Border and Arizona delivery points as westbound deliveries are constrained.
Reroute: Moderate: Transwestern Pipeline (TW) is the primary competing pipeline for SoCal border deliveries and may absorb some diverted Permian volumes, but a system-wide EPNG OFO typically reflects broad operational stress that TW alone cannot fully offset.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: OPERATIONAL FLOW ORDER
Subject: SOC Declaration - System Wide Draft
Posted: 07/07/2026 7:14:14AM
Effective: 07/07/2026 7:14:14AM
End Date: 07/08/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[FORCE MAJEURE] Force Majeure - Line 1103

SEV 4/5
Force Majeure Until Further Notice 1 Days

EPNG has declared a force majeure on Line 1103, effective 07/07/2026 at 9:55 AM with an end date of 07/08/2026 at 9:00 AM. The event is approximately one day in duration. No specific capacity volume is stated in the notice, but as an EPNG outbound segment, the constraint reduces Permian/Waha takeaway westward toward SoCal and Arizona delivery points.

EPNG Line 1103 force majeure tightens Permian westbound takeaway; expect bearish pressure at Waha as basin gas backs up, with bullish pressure at SoCal Border and Arizona delivery points -- no volume stated but any EPNG mainline FM carries significant directional signal.
Reroute: Moderate: Transwestern Pipeline (TW) is the primary competing pipeline for SoCal border and Arizona deliveries and may absorb some diverted volumes, though spare capacity availability on TW is uncertain and full offset is unlikely during a force majeure event.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: FORCE MAJEURE
Subject: Force Majeure - Line 1103
Posted: 07/07/2026 9:55:28AM
Effective: 07/07/2026 9:55:28AM
End Date: 07/08/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[FORCE MAJEURE] Force Majeure - Line 1102

SEV 4/5
Force Majeure Until Further Notice 1 Days

EPNG has declared a force majeure on Line 1102 effective 07/07/2026 at 9:59 AM with a stated end date of 07/08/2026 at 9:00 AM. The notice is a first-revision filing with no specific capacity volume disclosed. Line 1102 is an EPNG mainline segment carrying Permian Basin gas westbound toward Southwest and California delivery markets, producing a split directional signal across the constraint.

EPNG force majeure on Line 1102 tightens Permian westbound takeaway; expect bearish pressure at Waha as basin gas backs up, with bullish pressure at SoCal Border and Arizona delivery points -- no capacity volume disclosed but FM status warrants elevated basis vigilance for the ~24-hour duration.
Reroute: Moderate: Transwestern Pipeline (TW) is the primary competing pipeline for SoCal border and Arizona deliveries and may absorb some diverted volumes; however, if TW is also running near capacity during summer cooling demand, full offset is not guaranteed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: FORCE MAJEURE
Subject: Force Majeure - Line 1102
Posted: 07/07/2026 9:59:24AM
Effective: 07/07/2026 9:59:24AM
End Date: 07/08/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[FORCE MAJEURE] Force Majeure - Line 1103 Update #1

SEV 4/5
Force Majeure Until Further Notice 1 Days

EPNG has declared a force majeure on Line 1103 effective July 7, 2026 at 1:07 PM, with restoration expected by July 8, 2026 at 9:00 AM -- approximately 20 hours of impact. This is a first-notice event (Revision 1, not a revision of a prior notice) on an EPNG mainline segment. No specific capacity volume is stated in the notice, but Line 1103 is a Permian Basin outbound segment, meaning gas cannot move westward toward SoCal/Arizona delivery markets.

EPNG force majeure on Line 1103 creates a split-direction signal: expect bearish pressure at Waha/Permian Basin as westbound takeaway is curtailed, and bullish pressure at SoCal Border and Arizona delivery points as downstream supply is reduced -- no capacity volume disclosed.
Reroute: Moderate: Transwestern Pipeline (TW) is the primary competing pipeline serving SoCal Border and Arizona delivery points and may absorb some diverted Permian volumes, but spare capacity on TW during peak summer conditions may be limited.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: FORCE MAJEURE
Subject: Force Majeure - Line 1103 Update #1
Posted: 07/07/2026 1:07:57PM
Effective: 07/07/2026 1:07:57PM
End Date: 07/08/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[FORCE MAJEURE] Force Majeure - Line 1103 Update #2

SEV 4/5
Force Majeure Until Further Notice 1 Days

EPNG has declared a force majeure on Line 1103, effective July 9, 2026 at 2:37 PM with an expected restoration by July 10, 2026 at 9:00 AM. This is a fresh first-revision notice (Revision Number 1, Is Revision: No) covering approximately 18 hours of disruption. No specific capacity volume is stated in the notice, but any EPNG Line 1103 outbound constraint restricts Permian/Waha takeaway westward toward SoCal and Arizona markets.

EPNG Line 1103 force majeure tightens Permian westbound takeaway; expect bearish pressure at Waha as basin gas backs up and bullish pressure at SoCal Border and Arizona delivery points for the July 9-10 gas day.
Reroute: Moderate: Transwestern Pipeline (TW) is the primary competing pipeline serving SoCal Border and Arizona delivery points from the Permian/San Juan Basin, but spare capacity availability is uncertain and may not fully offset EPNG Line 1103 volumes given the short notice window.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: FORCE MAJEURE
Subject: Force Majeure - Line 1103 Update #2
Posted: 07/09/2026 2:37:36PM
Effective: 07/09/2026 2:37:36PM
End Date: 07/10/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[FORCE MAJEURE] Force Majeure - Puckett Station

SEV 4/5
Force Majeure Until Further Notice 1 Days

EPNG has declared a force majeure at Puckett Station effective 07/10/2026 at 7:28 AM, with an end date of 07/11/2026 at 9:00 AM -- approximately one calendar day. Puckett Station is a compressor/measurement station on the EPNG system in the Permian Basin corridor, affecting westbound Permian takeaway capacity. No specific volume restriction was provided in the notice.

EPNG force majeure at Puckett Station restricts Permian Basin westbound takeaway; expect bearish pressure at Waha as basin gas backs up and bullish pressure at SoCal Border and Arizona delivery points as downstream supply tightens -- monitor for capacity volume disclosure in subsequent revisions.
Reroute: Moderate: Transwestern Pipeline (TW) is the primary competing pipeline for SoCal border and Arizona deliveries and may absorb some displaced Permian volumes, but spare capacity is not guaranteed and a simultaneous TW constraint would eliminate California reroute options entirely.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: FORCE MAJEURE
Subject: Force Majeure - Puckett Station
Posted: 07/10/2026 7:28:40AM
Effective: 07/10/2026 7:28:40AM
End Date: 07/11/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[FORCE MAJEURE] Force Majeure Update - Florida C Station

SEV 4/5
Force Majeure Until Further Notice 1 Days

EPNG has declared a Force Majeure at Florida C Station effective 07/14/2026 at 9:41 AM with an expected end date of 07/15/2026 at 9:00 AM. Florida C is an internal EPNG tariff segment/compressor station designation in the Southwest/Texas-New Mexico corridor, not related to the state of Florida. The notice does not specify a capacity volume loss, but a force majeure at a compressor station on an outbound EPNG segment constrains Permian Basin takeaway moving westward toward SoCal and Arizona delivery points.

EPNG force majeure at Florida C Station constrains Permian-to-west outbound flow for approximately 1 day; expect bearish pressure at Waha as basin gas backs up, with bullish pressure at SoCal Border and Arizona delivery points -- no capacity volume specified so magnitude of basis move is uncertain.
Reroute: Moderate: Transwestern Pipeline (TW) is the primary competing pipeline for SoCal border and Arizona deliveries and may absorb some diverted volumes, though spare capacity on TW is not guaranteed and cannot be confirmed without operational data.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: FORCE MAJEURE
Subject: Force Majeure Update - Florida C Station
Posted: 07/14/2026 9:41:48AM
Effective: 07/14/2026 9:41:48AM
End Date: 07/15/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[FORCE MAJEURE] Force Majeure - Line No. 1204

SEV 4/5
Force Majeure Until Further Notice 1 Days

EPNG has declared a Force Majeure on Line No. 1204 effective 08/06/2026, with an end date of 08/07/2026 at 9:00 AM -- approximately 1 day in duration. The notice embeds an active Strained Operating Condition (SOC) and Operational Flow Order (OFO) originating 08/05/2026, citing system linepack being drafted below acceptable levels at five specific locations (DAEPCWIL, DNTUAFCP, DTEP S78, IBLYTHE, IGRIFFITH). IHSW Service has been suspended and Washington Ranch storage is available for withdrawal; immediate customer action is required to protect scheduled deliveries.

EPNG Force Majeure on Line 1204 with an active OFO/SOC declaration affecting downstream Arizona and SoCal border delivery points (IBLYTHE and IGRIFFITH are Blythe and Griffith, CA/AZ delivery interconnects); expect bullish pressure at SoCal Border and Arizona basis while Permian/Waha faces mild bearish pressure from reduced westbound takeaway.
Reroute: Moderate: Transwestern Pipeline (TW) serves overlapping SoCal border and Arizona markets and is the primary alternative, but if TW is simultaneously constrained there is no California reroute; the short duration (approximately 1 day) limits volume displacement.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: FORCE MAJEURE
Subject: Force Majeure - Line No. 1204
Posted: 08/06/2026 2:50:21PM
Effective: 08/06/2026 2:50:21PM
End Date: 08/07/2026 9:00:00AM

TSP/TSP Name:  8001703-EL PASO NATURAL GAS CO. L.L.C. Critical: Y
Notice Type Desc (1):  OPERATIONAL FLOW ORDER Notice Type Desc (2):  OFO
Notice Eff Date/Time:  08/05/2026 7:30:34AM Notice End Date/Time:  08/06/2026 9:00:00am
Post Date/Time:  8/5/2026 7:30:34 AM Notice ID: 629229
Reqrd Rsp:  1 Rsp Date/Time:  8/5/2026 12:00:00 AM
Notice Stat Desc:  INITIATE Prior Notice: 
Subject:  SOC Delcaration - Loc Specific Draft
Notice Text:
STRAINED OPERATING CONDITION (SOC) Declaration – Location Specific DRAFT
EFFECTIVE DATE: August 5, 2026
IMBALANCE TOLERANCE: 5%
DURATION:  Until Further Notice
AFFECTED AREAS/LOCATIONS:  Specific to the following locations:
 
DAEPCWIL (300754)
DNTUAFCP (331026)
DTEP S78 (301149)
IBLYTHE (314980)
IGRIFFITH (320614)
OPERATING CONDITION SUMMARY:   The EPNG system linepack level starts Gas Day August 5. 2026, at an acceptable level.  The locations listed above continue to draft the system and undermine our ability to maintain linepack within acceptable levels.
Deliveries in excess of scheduled quantities.
CUSTOMER ACTION REQUIRED:  Immediate action is required to ensure that system pressures remain at a level capable of meeting scheduled deliveries off the system.
EPNG RESPONSE:
- Washington Ranch is available for withdrawal.
- IHSW Service will be suspended.
REFERENCE INFORMATION:
For scheduling questions, please call your scheduling representative at (800) 238-3764.
For operational and capacity questions, please call Russ Pyeatt at (719) 520-3729, John Althoff at (719) 667-7750, Dan English at (719) 520-4722, or Morgan McCasland at (719) 520-4339.
For media inquiries, please contact media relations at newsroom@kindermorgan.com.
El Paso (EPNG)

[CAPACITY CONSTRAINT] EPNG OPEN FOR CONFIRMATIONS ID2

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice ID: 627731
Notice Type: CAPACITY CONSTRAINT
Subtype: SEGMENTS
Subject: EPNG OPEN FOR CONFIRMATIONS ID2
Posted: 03/06/2026 3:38:11PM
Effective: 03/06/2026 3:38:11PM
End Date: 03/07/2026 9:00:00AM
El Paso (EPNG)

[CAPACITY CONSTRAINT] EPNG OPEN FOR CONFIRMATIONS ID1

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice ID: 627753
Notice Type: CAPACITY CONSTRAINT
Subtype: SEGMENTS
Subject: EPNG OPEN FOR CONFIRMATIONS ID1
Posted: 03/09/2026 12:14:53PM
Effective: 03/09/2026 12:14:53PM
End Date: 03/10/2026 9:00:00AM
El Paso (EPNG)

[OPERATIONAL FLOW ORDER] OPERATIONAL FLOW ORDER - REPORT

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Natural Gas Pipeline (NGPL)
Notice ID: 46795
Notice Type: OPERATIONAL FLOW ORDER
Subtype: OFO
Subject: OPERATIONAL FLOW ORDER - REPORT
Posted: 03/04/2026 2:08:29PM
Effective: 03/04/2026 2:08:29PM
End Date: 05/31/2026 9:00:00AM
El Paso (EPNG)

[CAPACITY CONSTRAINT] SEG 24 - CS 346 - AT CAPACITY

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Natural Gas Pipeline (NGPL)
Notice ID: 46782
Notice Type: CAPACITY CONSTRAINT
Subtype: SEGMENTS
Subject: SEG 24 - CS 346 - AT CAPACITY
Posted: 02/27/2026 1:28:47PM
Effective: 02/27/2026 1:28:47PM
End Date: 05/31/2026 9:00:00AM
El Paso (EPNG)

[CAPACITY CONSTRAINT] SEGS 33/36 - AT OPERATING CAPACITY

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Natural Gas Pipeline (NGPL)
Notice ID: 46751
Notice Type: CAPACITY CONSTRAINT
Subtype: SEGMENTS
Subject: SEGS 33/36 - AT OPERATING CAPACITY
Posted: 02/13/2026 12:33:07PM
Effective: 02/13/2026 12:33:07PM
End Date: 06/30/2026 9:00:00AM
El Paso (EPNG)

[OPERATIONAL ALERT] SEG 27 - GC#2 LINE(GC305/306) PIPE INTEG

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Natural Gas Pipeline (NGPL)
Notice ID: 46749
Notice Type: OPERATIONAL ALERT
Subtype: ADVISORY/DIRECTIONAL NOTICE
Subject: SEG 27 - GC#2 LINE(GC305/306) PIPE INTEG
Posted: 02/12/2026 3:28:16PM
Effective: 02/12/2026 3:28:16PM
End Date: 03/31/2026 9:00:00AM
El Paso (EPNG)

[CAPACITY CONSTRAINT] IBS/LPS/SRO - RESTRICTIONS

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Natural Gas Pipeline (NGPL)
Notice ID: 46741
Notice Type: CAPACITY CONSTRAINT
Subtype: SEGMENTS
Subject: IBS/LPS/SRO - RESTRICTIONS
Posted: 02/10/2026 7:34:21AM
Effective: 02/10/2026 7:34:21AM
End Date: 03/31/2026 9:00:00AM
El Paso (EPNG)

[CAPACITY CONSTRAINT] EPNG OPEN FOR CONFIRMATIONS ID2

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice ID: 627763
Notice Type: CAPACITY CONSTRAINT
Subtype: SEGMENTS
Subject: EPNG OPEN FOR CONFIRMATIONS ID2
Posted: 03/10/2026 4:23:22PM
Effective: 03/10/2026 4:23:22PM
End Date: 03/11/2026 9:00:00AM
El Paso (EPNG)

[OPERATIONAL FLOW ORDER] OFO CD1 EXPANDED EFF 4-4 LIFTED 4-6

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Southern Natural Gas
Notice ID: 400369
Notice Type: OPERATIONAL FLOW ORDER
Subtype: OFO
Subject: OFO CD1 EXPANDED EFF 4-4 LIFTED 4-6
Posted: 04/02/2026 7:25:09AM
Effective: 04/02/2026 7:25:09AM
End Date: 04/03/2026 9:00:00AM
El Paso (EPNG)

[OPERATIONAL FLOW ORDER] OFO CD1 EXPANDED EFF 4-4 LIFTED 4-6

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPGD)
Notice ID: 400369
Notice Type: OPERATIONAL FLOW ORDER
Subtype: OFO
Subject: OFO CD1 EXPANDED EFF 4-4 LIFTED 4-6
Posted: 04/02/2026 7:25:09AM
Effective: 04/02/2026 7:25:09AM
End Date: 04/03/2026 9:00:00AM
El Paso (EPNG)

[OPERATIONAL FLOW ORDER] OFO CD1 EXPANDED EFF 4-4 LIFTED 4-6

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Colorado Interstate Gas
Notice ID: 400369
Notice Type: OPERATIONAL FLOW ORDER
Subtype: OFO
Subject: OFO CD1 EXPANDED EFF 4-4 LIFTED 4-6
Posted: 04/02/2026 7:25:09AM
Effective: 04/02/2026 7:25:09AM
End Date: 04/03/2026 9:00:00AM
El Paso (EPNG)

[OPERATIONAL FLOW ORDER] OFO CD1 EXPANDED EFF 4-4 LIFTED 4-6

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Mojave Pipeline
Notice ID: 400369
Notice Type: OPERATIONAL FLOW ORDER
Subtype: OFO
Subject: OFO CD1 EXPANDED EFF 4-4 LIFTED 4-6
Posted: 04/02/2026 7:25:09AM
Effective: 04/02/2026 7:25:09AM
End Date: 04/03/2026 9:00:00AM
El Paso (EPNG)

[OPERATIONAL FLOW ORDER] OFO CD1 EXPANDED EFF 4-4 LIFTED 4-6

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Wyoming Interstate
Notice ID: 400369
Notice Type: OPERATIONAL FLOW ORDER
Subtype: OFO
Subject: OFO CD1 EXPANDED EFF 4-4 LIFTED 4-6
Posted: 04/02/2026 7:25:09AM
Effective: 04/02/2026 7:25:09AM
End Date: 04/03/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] SEGMENT 2-CS801-UNIT MAINT

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: SEGMENT 2-CS801-UNIT MAINT
Posted: 06/05/2026 8:22:01AM
Effective: 06/05/2026 8:22:01AM
End Date: 07/31/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[CAPACITY CONSTRAINT] Location Performance

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: CAPACITY CONSTRAINT
Subject: Location Performance
Posted: 06/20/2026 8:24:30AM
Effective: 06/20/2026 8:24:30AM
End Date: 06/21/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[OPERATIONAL ALERT] SOC Warning - System Wide Draft

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: OPERATIONAL ALERT
Subject: SOC Warning - System Wide Draft
Posted: 06/23/2026 12:59:22PM
Effective: 06/23/2026 12:59:22PM
End Date: 06/24/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[OPERATIONAL FLOW ORDER] SOC Declaration-Location Specific Draft

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: OPERATIONAL FLOW ORDER
Subject: SOC Declaration-Location Specific Draft
Posted: 06/24/2026 7:48:34AM
Effective: 06/24/2026 7:48:34AM
End Date: 06/25/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[FORCE MAJEURE] Force Majeure Lifted Line 1102

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: FORCE MAJEURE
Subject: Force Majeure Lifted Line 1102
Posted: 06/25/2026 3:39:10PM
Effective: 06/25/2026 3:39:10PM
End Date: 06/26/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[OPERATIONAL FLOW ORDER] SOC Warning - System Wide Draft

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: OPERATIONAL FLOW ORDER
Subject: SOC Warning - System Wide Draft
Posted: 07/06/2026 9:58:23AM
Effective: 07/06/2026 9:58:23AM
End Date: 07/07/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] SEGMENT 9 - CS169 - UNIT MAINT

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: SEGMENT 9 - CS169 - UNIT MAINT
Posted: 07/02/2026 11:59:31AM
Effective: 07/02/2026 11:59:31AM
End Date: 09/30/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] SEGMENT 15 - CS801 - STA MAINT

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: SEGMENT 15 - CS801 - STA MAINT
Posted: 07/02/2026 11:57:51AM
Effective: 07/02/2026 11:57:51AM
End Date: 10/31/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] SEGMENT 24 - CS346 - STA MAINT

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: SEGMENT 24 - CS346 - STA MAINT
Posted: 07/02/2026 11:56:51AM
Effective: 07/02/2026 11:56:51AM
End Date: 08/31/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[CAPACITY CONSTRAINT] SEGMENT 24 EAST - STA 346 - PRIMARY ONLY

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: CAPACITY CONSTRAINT
Subject: SEGMENT 24 EAST - STA 346 - PRIMARY ONLY
Posted: 07/01/2026 7:54:18AM
Effective: 07/01/2026 7:54:18AM
End Date: 07/31/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[CAPACITY CONSTRAINT] SEGMENT 23 EAST - STA 342 - PRIMARY ONLY

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: CAPACITY CONSTRAINT
Subject: SEGMENT 23 EAST - STA 342 - PRIMARY ONLY
Posted: 07/01/2026 7:53:45AM
Effective: 07/01/2026 7:53:45AM
End Date: 07/31/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[CAPACITY CONSTRAINT] SEGMENT 25 EAST- STA 302 - PRIMARY ONLY

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: CAPACITY CONSTRAINT
Subject: SEGMENT 25 EAST- STA 302 - PRIMARY ONLY
Posted: 07/01/2026 7:52:57AM
Effective: 07/01/2026 7:52:57AM
End Date: 07/31/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[CAPACITY CONSTRAINT] TRAILBLAZER GAGE - PRIM ONLY LIFT

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: CAPACITY CONSTRAINT
Subject: TRAILBLAZER GAGE - PRIM ONLY LIFT
Posted: 06/29/2026 7:01:06AM
Effective: 06/29/2026 7:01:06AM
End Date: 07/31/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[CAPACITY CONSTRAINT] CHEYENNE PLAINS FORD-PRIM ONLY LIFT

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: CAPACITY CONSTRAINT
Subject: CHEYENNE PLAINS FORD-PRIM ONLY LIFT
Posted: 06/29/2026 7:00:22AM
Effective: 06/29/2026 7:00:22AM
End Date: 07/31/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[CAPACITY CONSTRAINT] EPNG MOORE (LOC 3251) - PRIM ONLY LIFT

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: CAPACITY CONSTRAINT
Subject: EPNG MOORE (LOC 3251) - PRIM ONLY LIFT
Posted: 06/29/2026 6:59:31AM
Effective: 06/29/2026 6:59:31AM
End Date: 07/31/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[CAPACITY CONSTRAINT] CIG FORGAN(LOC 905207) - PRIM ONLY LIFT

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: CAPACITY CONSTRAINT
Subject: CIG FORGAN(LOC 905207) - PRIM ONLY LIFT
Posted: 06/29/2026 6:58:50AM
Effective: 06/29/2026 6:58:50AM
End Date: 07/31/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[CAPACITY CONSTRAINT] NORTHERN BORDER HARPER-PRIM ONLY LIFT

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: CAPACITY CONSTRAINT
Subject: NORTHERN BORDER HARPER-PRIM ONLY LIFT
Posted: 06/29/2026 6:57:19AM
Effective: 06/29/2026 6:57:19AM
End Date: 07/31/2026 9:00:00AM
El Paso (EPNG)

[CAPACITY CONSTRAINT] EPNG OPEN FOR CONFIRMATIONS Timely

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice ID: 627730
Notice Type: CAPACITY CONSTRAINT
Subtype: SEGMENTS
Subject: EPNG OPEN FOR CONFIRMATIONS Timely
Posted: 03/06/2026 2:20:46PM
Effective: 03/06/2026 2:20:46PM
End Date: 03/07/2026 9:00:00AM
El Paso (EPNG)

[OVER-UNDER PERFORMANCE] Location Performance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice ID: 627729
Notice Type: OVER-UNDER PERFORMANCE
Subtype: THIRD PARTY
Subject: Location Performance
Posted: 03/06/2026 1:14:30PM
Effective: 03/06/2026 1:14:30PM
End Date: 03/07/2026 9:00:00AM
El Paso (EPNG)

[MAINTENANCE] Updated March 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice ID: 627728
Notice Type: MAINTENANCE
Subtype: MAINTENANCE
Subject: Updated March 2026 Maintenance
Posted: 03/06/2026 12:07:05PM
Effective: 03/06/2026 12:07:05PM
End Date: 03/07/2026 9:00:00AM
El Paso (EPNG)

[CAPACITY CONSTRAINT] EPNG OPEN FOR CONFIRMATIONS ID1

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice ID: 627725
Notice Type: CAPACITY CONSTRAINT
Subtype: SEGMENTS
Subject: EPNG OPEN FOR CONFIRMATIONS ID1
Posted: 03/06/2026 11:18:45AM
Effective: 03/06/2026 11:18:45AM
End Date: 03/07/2026 9:00:00AM
El Paso (EPNG)

[MAINTENANCE] Updated March 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice ID: 627752
Notice Type: MAINTENANCE
Subtype: MAINTENANCE
Subject: Updated March 2026 Maintenance
Posted: 03/09/2026 10:23:24AM
Effective: 03/09/2026 10:23:24AM
End Date: 03/10/2026 9:00:00AM
El Paso (EPNG)

[CAPACITY CONSTRAINT] EPNG OPEN FOR CONFIRMATIONS Timely

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice ID: 627762
Notice Type: CAPACITY CONSTRAINT
Subtype: SEGMENTS
Subject: EPNG OPEN FOR CONFIRMATIONS Timely
Posted: 03/10/2026 3:20:54PM
Effective: 03/10/2026 3:20:54PM
End Date: 03/11/2026 9:00:00AM
El Paso (EPNG)

[OVER-UNDER PERFORMANCE] Location Performance Update

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice ID: 627761
Notice Type: OVER-UNDER PERFORMANCE
Subtype: THIRD PARTY
Subject: Location Performance Update
Posted: 03/10/2026 1:53:26PM
Effective: 03/10/2026 1:53:26PM
End Date: 03/11/2026 9:00:00AM
El Paso (EPNG)

[MAINTENANCE] Updated March 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice ID: 627760
Notice Type: MAINTENANCE
Subtype: MAINTENANCE
Subject: Updated March 2026 Maintenance
Posted: 03/10/2026 12:39:11PM
Effective: 03/10/2026 12:39:11PM
End Date: 03/11/2026 9:00:00AM
El Paso (EPNG)

[CAPACITY CONSTRAINT] EPNG OPEN FOR CONFIRMATIONS ID1

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice ID: 627759
Notice Type: CAPACITY CONSTRAINT
Subtype: SEGMENTS
Subject: EPNG OPEN FOR CONFIRMATIONS ID1
Posted: 03/10/2026 11:47:43AM
Effective: 03/10/2026 11:47:43AM
End Date: 03/11/2026 9:00:00AM
El Paso (EPNG)

[OVER-UNDER PERFORMANCE] Location Performance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice ID: 627758
Notice Type: OVER-UNDER PERFORMANCE
Subtype: THIRD PARTY
Subject: Location Performance
Posted: 03/10/2026 9:57:15AM
Effective: 03/10/2026 9:57:15AM
End Date: 03/11/2026 9:00:00AM
El Paso (EPNG)

[MAINTENANCE] SEG 11-AM#3 M/L(CS 105/106)ILI TOOL-UPD1

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Natural Gas Pipeline (NGPL)
Notice ID: 46815
Notice Type: MAINTENANCE
Subtype: MAINTENANCE
Subject: SEG 11-AM#3 M/L(CS 105/106)ILI TOOL-UPD1
Posted: 03/10/2026 10:50:48AM
Effective: 03/10/2026 10:50:48AM
End Date: 03/11/2026 9:00:00AM
El Paso (EPNG)

[MAINTENANCE] SEG 8 - UNIT MAINTENANCE - CS 168

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Natural Gas Pipeline (NGPL)
Notice ID: 46780
Notice Type: MAINTENANCE
Subtype: MAINTENANCE
Subject: SEG 8 - UNIT MAINTENANCE - CS 168
Posted: 02/26/2026 2:07:57PM
Effective: 02/26/2026 2:07:57PM
End Date: 04/30/2026 9:00:00AM
El Paso (EPNG)

[MAINTENANCE] PHMSA MEGA RULE - CS 156 TO CS 158

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Natural Gas Pipeline (NGPL)
Notice ID: 46747
Notice Type: MAINTENANCE
Subtype: MAINTENANCE
Subject: PHMSA MEGA RULE - CS 156 TO CS 158
Posted: 02/12/2026 2:36:58PM
Effective: 02/12/2026 2:36:58PM
End Date: 04/30/2026 9:00:00AM
El Paso (EPNG)

[CAPACITY CONSTRAINT] EPNG OPEN FOR CONFIRMATIONS ID3

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice ID: 627767
Notice Type: CAPACITY CONSTRAINT
Subtype: SEGMENTS
Subject: EPNG OPEN FOR CONFIRMATIONS ID3
Posted: 03/10/2026 8:28:01PM
Effective: 03/10/2026 8:28:01PM
End Date: 03/11/2026 9:00:00AM
El Paso (EPNG)

[CAPACITY CONSTRAINT] EPNG OPEN FOR CONFIRMATIONS Evening

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice ID: 627766
Notice Type: CAPACITY CONSTRAINT
Subtype: SEGMENTS
Subject: EPNG OPEN FOR CONFIRMATIONS Evening
Posted: 03/10/2026 8:16:04PM
Effective: 03/10/2026 8:16:04PM
End Date: 03/11/2026 9:00:00AM
El Paso (EPNG)

[OVER-UNDER PERFORMANCE] Location Performance Update

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice ID: 627765
Notice Type: OVER-UNDER PERFORMANCE
Subtype: THIRD PARTY
Subject: Location Performance Update
Posted: 03/10/2026 6:24:07PM
Effective: 03/10/2026 6:24:07PM
End Date: 03/11/2026 9:00:00AM
El Paso (EPNG)

[OVER-UNDER PERFORMANCE] Location Performance Update

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice ID: 627764
Notice Type: OVER-UNDER PERFORMANCE
Subtype: THIRD PARTY
Subject: Location Performance Update
Posted: 03/10/2026 5:58:50PM
Effective: 03/10/2026 5:58:50PM
End Date: 03/11/2026 9:00:00AM
El Paso (EPNG)

[PIPELINE CONDITIONS] RESTRICTIONS FOR 03-10-2026 ID3

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Wyoming Interstate
Notice ID: 399861
Notice Type: PIPELINE CONDITIONS
Subtype: CURRENT PIPELINE CONDITIONS
Subject: RESTRICTIONS FOR 03-10-2026 ID3
Posted: 03/10/2026 7:51:25PM
Effective: 03/10/2026 7:51:25PM
End Date: 03/11/2026 9:00:00AM
El Paso (EPNG)

[PIPELINE CONDITIONS] RESTRICTIONS FOR 03-11-2026 EC

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Wyoming Interstate
Notice ID: 399860
Notice Type: PIPELINE CONDITIONS
Subtype: CURRENT PIPELINE CONDITIONS
Subject: RESTRICTIONS FOR 03-11-2026 EC
Posted: 03/10/2026 7:13:59PM
Effective: 03/10/2026 7:13:59PM
End Date: 03/11/2026 9:00:00AM
El Paso (EPNG)

[PIPELINE CONDITIONS] RESTRICTIONS FOR 10-26-2026 ID2

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Wyoming Interstate
Notice ID: 399854
Notice Type: PIPELINE CONDITIONS
Subtype: CURRENT PIPELINE CONDITIONS
Subject: RESTRICTIONS FOR 10-26-2026 ID2
Posted: 03/10/2026 3:18:49PM
Effective: 03/10/2026 3:18:49PM
End Date: 03/11/2026 9:00:00AM
El Paso (EPNG)

[PIPELINE CONDITIONS] RESTRICTIONS FOR 03-11-2026 TIMELY CYCLE

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Wyoming Interstate
Notice ID: 399853
Notice Type: PIPELINE CONDITIONS
Subtype: CURRENT PIPELINE CONDITIONS
Subject: RESTRICTIONS FOR 03-11-2026 TIMELY CYCLE
Posted: 03/10/2026 2:43:45PM
Effective: 03/10/2026 2:43:45PM
End Date: 03/11/2026 9:00:00AM
El Paso (EPNG)

[PIPELINE CONDITIONS] RESTRICTIONS FOR 03-10-2026 ID1

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Wyoming Interstate
Notice ID: 399846
Notice Type: PIPELINE CONDITIONS
Subtype: CURRENT PIPELINE CONDITIONS
Subject: RESTRICTIONS FOR 03-10-2026 ID1
Posted: 03/10/2026 10:54:01AM
Effective: 03/10/2026 10:54:01AM
End Date: 03/11/2026 9:00:00AM
El Paso (EPNG)

[TSP CAPACITY OFFERING] AVAILABLE FIRM CAPACITY - OS #1429

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Wyoming Interstate
Notice ID: 399822
Notice Type: TSP CAPACITY OFFERING
Subtype: TSP CAP OFFERING
Subject: AVAILABLE FIRM CAPACITY - OS #1429
Posted: 03/09/2026 8:00:21AM
Effective: 03/09/2026 8:00:21AM
End Date: 03/12/2026 9:00:00AM
El Paso (EPNG)

[MAINTENANCE] Updated March 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice ID: 627760
Notice Type: MAINTENANCE
Subtype: MAINTENANCE
Subject: Updated March 2026 Maintenance
Posted: 03/10/2026 12:39:11PM
Effective: 03/10/2026 12:39:11PM
End Date: 03/11/2026 9:00:00AM
El Paso (EPNG)

[MAINTENANCE] Updated March 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice ID: 627768
Notice Type: MAINTENANCE
Subtype: MAINTENANCE
Subject: Updated March 2026 Maintenance
Posted: 03/11/2026 11:38:39AM
Effective: 03/11/2026 11:38:39AM
End Date: 03/12/2026 9:00:00AM
El Paso (EPNG)

[STORAGE] ANT STAGECOACH INJECTION RESTRICTION3-12

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Stagecoach Pipeline and Storage
Notice ID: 399866
Notice Type: STORAGE
Subtype: RESTRICTIONS
Subject: ANT STAGECOACH INJECTION RESTRICTION3-12
Posted: 03/11/2026 9:13:44AM
Effective: 03/11/2026 9:13:44AM
End Date: 03/12/2026 9:00:00AM
El Paso (EPNG)

[MAINTENANCE] Updated March 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice ID: 627827
Notice Type: MAINTENANCE
Subtype: MAINTENANCE
Subject: Updated March 2026 Maintenance
Posted: 03/17/2026 11:47:01AM
Effective: 03/17/2026 11:47:01AM
End Date: 03/18/2026 9:00:00AM
El Paso (EPNG)

[MAINTENANCE] Updated Prelim April 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice ID: 627958
Notice Type: MAINTENANCE
Subtype: MAINTENANCE
Subject: Updated Prelim April 2026 Maintenance
Posted: 03/31/2026 2:04:14PM
Effective: 03/31/2026 2:04:14PM
End Date: 04/01/2026 9:00:00AM
El Paso (EPNG)

[MAINTENANCE] Updated Prelim April 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice ID: 627954
Notice Type: MAINTENANCE
Subtype: MAINTENANCE
Subject: Updated Prelim April 2026 Maintenance
Posted: 03/31/2026 10:53:36AM
Effective: 03/31/2026 10:53:36AM
End Date: 04/01/2026 9:00:00AM
El Paso (EPNG)

[MAINTENANCE] TGP Outage Impact Report

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Southern Natural Gas
Notice ID: 400377
Notice Type: MAINTENANCE
Subtype: MAINTENANCE
Subject: TGP Outage Impact Report
Posted: 04/02/2026 3:35:52PM
Effective: 04/02/2026 3:35:52PM
End Date: 04/03/2026 9:00:00AM
El Paso (EPNG)

[MAINTENANCE] TGP Outage Impact Report

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPGD)
Notice ID: 400377
Notice Type: MAINTENANCE
Subtype: MAINTENANCE
Subject: TGP Outage Impact Report
Posted: 04/02/2026 3:35:52PM
Effective: 04/02/2026 3:35:52PM
End Date: 04/03/2026 9:00:00AM
El Paso (EPNG)

[MAINTENANCE] TGP Outage Impact Report

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Colorado Interstate Gas
Notice ID: 400377
Notice Type: MAINTENANCE
Subtype: MAINTENANCE
Subject: TGP Outage Impact Report
Posted: 04/02/2026 3:35:52PM
Effective: 04/02/2026 3:35:52PM
End Date: 04/03/2026 9:00:00AM
El Paso (EPNG)

[MAINTENANCE] TGP Outage Impact Report

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Mojave Pipeline
Notice ID: 400377
Notice Type: MAINTENANCE
Subtype: MAINTENANCE
Subject: TGP Outage Impact Report
Posted: 04/02/2026 3:35:52PM
Effective: 04/02/2026 3:35:52PM
End Date: 04/03/2026 9:00:00AM
El Paso (EPNG)

[MAINTENANCE] TGP Outage Impact Report

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Wyoming Interstate
Notice ID: 400377
Notice Type: MAINTENANCE
Subtype: MAINTENANCE
Subject: TGP Outage Impact Report
Posted: 04/02/2026 3:35:52PM
Effective: 04/02/2026 3:35:52PM
End Date: 04/03/2026 9:00:00AM
El Paso (EPNG)

[MAINTENANCE] Updated April 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: Updated April 2026 Maintenance
Posted: 04/15/2026 10:34:41AM
Effective: 04/15/2026 10:34:41AM
End Date: 04/16/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated June 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: Updated June 2026 Maintenance
Posted: 06/11/2026 9:42:00AM
Effective: 06/11/2026 9:42:00AM
End Date: 06/12/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated June 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: Updated June 2026 Maintenance
Posted: 06/11/2026 4:38:03PM
Effective: 06/11/2026 4:38:03PM
End Date: 06/12/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated June 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: Updated June 2026 Maintenance
Posted: 06/12/2026 8:50:21AM
Effective: 06/12/2026 8:50:21AM
End Date: 06/13/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated June 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: Updated June 2026 Maintenance
Posted: 06/15/2026 12:15:21PM
Effective: 06/15/2026 12:15:21PM
End Date: 06/16/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated June 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: Updated June 2026 Maintenance
Posted: 06/17/2026 10:22:38AM
Effective: 06/17/2026 10:22:38AM
End Date: 06/18/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[FORCE MAJEURE] Force Majeure Lifted - Line 1201/1112

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: FORCE MAJEURE
Subject: Force Majeure Lifted - Line 1201/1112
Posted: 06/17/2026 10:21:22AM
Effective: 06/17/2026 10:21:22AM
End Date: 06/18/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] Preliminary July 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: Preliminary July 2026 Maintenance
Posted: 06/18/2026 5:03:34PM
Effective: 06/18/2026 5:03:34PM
End Date: 06/19/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] SEGMENT 26-GC #3 ML-ILI TOOL RUNS - UPD1

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: SEGMENT 26-GC #3 ML-ILI TOOL RUNS - UPD1
Posted: 06/18/2026 2:42:13PM
Effective: 06/18/2026 2:42:13PM
End Date: 07/31/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] PHMSA MEGA RULE-CS184/154 PLM-UPD3

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: PHMSA MEGA RULE-CS184/154 PLM-UPD3
Posted: 06/03/2026 3:50:33PM
Effective: 06/03/2026 3:50:33PM
End Date: 06/30/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] PHMSA MEGA RULE-CS184/154 PLM - UPD2

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: PHMSA MEGA RULE-CS184/154 PLM - UPD2
Posted: 05/21/2026 3:21:21PM
Effective: 05/21/2026 3:21:21PM
End Date: 06/30/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated June 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: Updated June 2026 Maintenance
Posted: 06/22/2026 4:42:45PM
Effective: 06/22/2026 4:42:45PM
End Date: 06/23/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated July 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: Updated July 2026 Maintenance
Posted: 06/23/2026 11:21:18AM
Effective: 06/23/2026 11:21:18AM
End Date: 06/24/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated Prelim July 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: Updated Prelim July 2026 Maintenance
Posted: 06/23/2026 3:35:33PM
Effective: 06/23/2026 3:35:33PM
End Date: 06/24/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated June 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: Updated June 2026 Maintenance
Posted: 06/24/2026 7:08:36AM
Effective: 06/24/2026 7:08:36AM
End Date: 06/25/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[OPERATIONAL FLOW ORDER] SOC Lifted - Location Specific Draft

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: OPERATIONAL FLOW ORDER
Subject: SOC Lifted - Location Specific Draft
Posted: 06/25/2026 7:30:16AM
Effective: 06/25/2026 7:30:16AM
End Date: 06/26/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated June 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: Updated June 2026 Maintenance
Posted: 06/25/2026 3:51:03PM
Effective: 06/25/2026 3:51:03PM
End Date: 06/26/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[FORCE MAJEURE] Force Majeure Lifted - Eunice C Station

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: FORCE MAJEURE
Subject: Force Majeure Lifted - Eunice C Station
Posted: 06/25/2026 3:41:37PM
Effective: 06/25/2026 3:41:37PM
End Date: 06/26/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated June 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: Updated June 2026 Maintenance
Posted: 06/29/2026 11:27:14AM
Effective: 06/29/2026 11:27:14AM
End Date: 06/30/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated July 2026 Prelim Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: Updated July 2026 Prelim Maintenance
Posted: 06/29/2026 1:14:12PM
Effective: 06/29/2026 1:14:12PM
End Date: 06/30/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[OPERATIONAL FLOW ORDER] SOC Lifted - System Wide Pack

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: OPERATIONAL FLOW ORDER
Subject: SOC Lifted - System Wide Pack
Posted: 07/01/2026 7:34:45AM
Effective: 07/01/2026 7:34:45AM
End Date: 07/02/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated July 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: Updated July 2026 Maintenance
Posted: 07/01/2026 5:56:41PM
Effective: 07/01/2026 5:56:41PM
End Date: 07/02/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[FORCE MAJEURE] Force Majeure Lifted - Gresham Station

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: FORCE MAJEURE
Subject: Force Majeure Lifted - Gresham Station
Posted: 07/01/2026 5:49:57PM
Effective: 07/01/2026 5:49:57PM
End Date: 07/02/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated July 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: Updated July 2026 Maintenance
Posted: 07/02/2026 12:04:10PM
Effective: 07/02/2026 12:04:10PM
End Date: 07/03/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated July 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: Updated July 2026 Maintenance
Posted: 07/07/2026 10:07:28AM
Effective: 07/07/2026 10:07:28AM
End Date: 07/08/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated July 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: Updated July 2026 Maintenance
Posted: 07/07/2026 1:14:40PM
Effective: 07/07/2026 1:14:40PM
End Date: 07/08/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated July 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: Updated July 2026 Maintenance
Posted: 07/07/2026 4:41:44PM
Effective: 07/07/2026 4:41:44PM
End Date: 07/08/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[OPERATIONAL FLOW ORDER] SOC Lifted - System Wide Draft

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: OPERATIONAL FLOW ORDER
Subject: SOC Lifted - System Wide Draft
Posted: 07/08/2026 7:11:03AM
Effective: 07/08/2026 7:11:03AM
End Date: 07/09/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated July 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: Updated July 2026 Maintenance
Posted: 07/08/2026 11:41:00AM
Effective: 07/08/2026 11:41:00AM
End Date: 07/09/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated July 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: Updated July 2026 Maintenance
Posted: 07/09/2026 7:46:26AM
Effective: 07/09/2026 7:46:26AM
End Date: 07/10/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated July 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: Updated July 2026 Maintenance
Posted: 07/09/2026 2:51:32PM
Effective: 07/09/2026 2:51:32PM
End Date: 07/10/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated July 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: Updated July 2026 Maintenance
Posted: 07/10/2026 7:40:35AM
Effective: 07/10/2026 7:40:35AM
End Date: 07/11/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[CAPACITY CONSTRAINT] ALLIANCE(LOC 37207) - PRIM ONLY LIFT

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: CAPACITY CONSTRAINT
Subject: ALLIANCE(LOC 37207) - PRIM ONLY LIFT
Posted: 06/29/2026 6:58:07AM
Effective: 06/29/2026 6:58:07AM
End Date: 07/31/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated July 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: Updated July 2026 Maintenance
Posted: 07/14/2026 9:45:42AM
Effective: 07/14/2026 9:45:42AM
End Date: 07/15/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated July 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: Updated July 2026 Maintenance
Posted: 07/15/2026 4:16:40PM
Effective: 07/15/2026 4:16:40PM
End Date: 07/16/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[FORCE MAJEURE] Force Majeure Lifted - Line 1102

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: FORCE MAJEURE
Subject: Force Majeure Lifted - Line 1102
Posted: 07/15/2026 4:10:58PM
Effective: 07/15/2026 4:10:58PM
End Date: 07/16/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated July 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: Updated July 2026 Maintenance
Posted: 07/16/2026 12:14:13PM
Effective: 07/16/2026 12:14:13PM
End Date: 07/17/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated July 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: Updated July 2026 Maintenance
Posted: 07/17/2026 8:24:00AM
Effective: 07/17/2026 8:24:00AM
End Date: 07/18/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated July 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: Updated July 2026 Maintenance
Posted: 07/20/2026 11:44:45AM
Effective: 07/20/2026 11:44:45AM
End Date: 07/21/2026 9:00:00AM
El Paso (EPNG)

[PIPELINE CONDITIONS] CURRENT PIPELINE CONDITIONS

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Natural Gas Pipeline (NGPL)
Notice ID: 46816
Notice Type: PIPELINE CONDITIONS
Subtype: CURRENT PIPELINE CONDITIONS
Subject: CURRENT PIPELINE CONDITIONS
Posted: 03/10/2026 3:32:17PM
Effective: 03/10/2026 3:32:17PM
End Date: 03/11/2026 9:00:00AM
El Paso (EPNG)

[MAINTENANCE] STATION MAINTENANCE - CS 348 - COMPLETED

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Natural Gas Pipeline (NGPL)
Notice ID: 46809
Notice Type: MAINTENANCE
Subtype: MAINTENANCE
Subject: STATION MAINTENANCE - CS 348 - COMPLETED
Posted: 03/06/2026 7:46:12AM
Effective: 03/06/2026 7:46:12AM
End Date: 05/31/2026 9:00:00AM
El Paso (EPNG)

[TSP CAPACITY OFFERING] REQUEST FOR PROPOSAL

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Wyoming Interstate
Notice ID: 399715
Notice Type: TSP CAPACITY OFFERING
Subtype: TSP CAP OFFERING
Subject: REQUEST FOR PROPOSAL
Posted: 03/04/2026 2:59:28PM
Effective: 03/04/2026 2:59:28PM
End Date: 03/19/2026 9:00:00AM
El Paso (EPNG)

[TSP CAPACITY OFFERING] FIRM CAPACITY - EXPANSION OS# 1428

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Wyoming Interstate
Notice ID: 399708
Notice Type: TSP CAPACITY OFFERING
Subtype: TSP CAP OFFERING
Subject: FIRM CAPACITY - EXPANSION OS# 1428
Posted: 03/04/2026 2:00:08PM
Effective: 03/04/2026 2:00:08PM
End Date: 04/01/2026 9:00:00AM
El Paso (EPNG)

[TSP CAPACITY OFFERING] REQUEST FOR PROPOSAL

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Wyoming Interstate
Notice ID: 399711
Notice Type: TSP CAPACITY OFFERING
Subtype: TSP CAP OFFERING
Subject: REQUEST FOR PROPOSAL
Posted: 03/04/2026 1:33:35PM
Effective: 03/04/2026 1:33:35PM
End Date: 03/19/2026 9:00:00AM
El Paso (EPNG)

[STORAGE] MONTHLY STORAGE TRANSFERS REMINDER

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Tennessee Gas Pipeline
Notice ID: 400323
Notice Type: STORAGE
Subtype: RESTRICTIONS
Subject: MONTHLY STORAGE TRANSFERS REMINDER
Posted: 03/31/2026 6:30:07AM
Effective: 03/31/2026 6:30:07AM
End Date: 04/01/2026 9:00:00AM
El Paso (EPNG)

[STORAGE] MONTHLY STORAGE TRANSFERS REMINDER

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Southern Natural Gas
Notice ID: 400323
Notice Type: STORAGE
Subtype: RESTRICTIONS
Subject: MONTHLY STORAGE TRANSFERS REMINDER
Posted: 03/31/2026 6:30:07AM
Effective: 03/31/2026 6:30:07AM
End Date: 04/01/2026 9:00:00AM
El Paso (EPNG)

[STORAGE] MONTHLY STORAGE TRANSFERS REMINDER

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPGD)
Notice ID: 400323
Notice Type: STORAGE
Subtype: RESTRICTIONS
Subject: MONTHLY STORAGE TRANSFERS REMINDER
Posted: 03/31/2026 6:30:07AM
Effective: 03/31/2026 6:30:07AM
End Date: 04/01/2026 9:00:00AM
El Paso (EPNG)

[STORAGE] MONTHLY STORAGE TRANSFERS REMINDER

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Colorado Interstate Gas
Notice ID: 400323
Notice Type: STORAGE
Subtype: RESTRICTIONS
Subject: MONTHLY STORAGE TRANSFERS REMINDER
Posted: 03/31/2026 6:30:07AM
Effective: 03/31/2026 6:30:07AM
End Date: 04/01/2026 9:00:00AM
El Paso (EPNG)

[STORAGE] MONTHLY STORAGE TRANSFERS REMINDER

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Mojave Pipeline
Notice ID: 400323
Notice Type: STORAGE
Subtype: RESTRICTIONS
Subject: MONTHLY STORAGE TRANSFERS REMINDER
Posted: 03/31/2026 6:30:07AM
Effective: 03/31/2026 6:30:07AM
End Date: 04/01/2026 9:00:00AM
El Paso (EPNG)

[STORAGE] MONTHLY STORAGE TRANSFERS REMINDER

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Wyoming Interstate
Notice ID: 400323
Notice Type: STORAGE
Subtype: RESTRICTIONS
Subject: MONTHLY STORAGE TRANSFERS REMINDER
Posted: 03/31/2026 6:30:07AM
Effective: 03/31/2026 6:30:07AM
End Date: 04/01/2026 9:00:00AM
El Paso Natural Gas (EPNG)

[OPERATIONAL ALERT] SEG 3/4 - M&M LINE - PIPE INTEG

SEV 1/5
Informational

Not scored -- external_id 'EPNG-47101' shares its numeric ID and exact title with 'NGPL-47101' under a different pipeline code. Very likely the same underlying notice scraped twice under two different labels (see kindermorgan.py v19 changelog / audit_km_contamination.py) rather than two independent events. No Claude API call was made for this notice. Needs manual review to confirm which pipeline (if either) is correct before it's trusted.

Not scored -- suspected cross-pipeline duplicate, needs manual review.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: OPERATIONAL ALERT
Subject: SEG 3/4 - M&M LINE - PIPE INTEG
Posted: 07/17/2026 8:20:15AM
Effective: 07/17/2026 8:20:15AM
End Date: 08/31/2026 9:00:00AM

TSP/TSP Name:  8001703-EL PASO NATURAL GAS CO. L.L.C. Critical: Y
Notice Type Desc (1):  FORCE MAJEURE Notice Type Desc (2):  FORCE MAJEURE
Notice Eff Date/Time:  07/29/2026 8:30:49AM Notice End Date/Time:  07/30/2026 9:00:00am
Post Date/Time:  7/29/2026 8:30:49 AM Notice ID: 629149
Reqrd Rsp:  1 Rsp Date/Time:  7/29/2026 12:00:00 AM
Notice Stat Desc:  INITIATE Prior Notice: 
Subject:  Force Majeure - Lincoln Station
Notice Text:
Force Majeure – Lincoln Station
El Paso Natural Gas Company, L.L.C. (EPNG) has experienced a damaged exhaust duct associated with its Lincoln Compressor Station located in Lincoln County, New Mexico and as such the station is currently unavailable. Accordingly, the operational capacity through the CAPROCK N constraint will be reduced by an additional 150,000 dekatherms per day (Dth/d) effective July 29, 2026, Intraday 1 Cycle, (Cycle 3).
EPNG will be posting an updated maintenance notice to reflect the total impact through the CAPROCK N constraint.
EPNG will provide updates as more information becomes available.
This incident constitutes an event of Force Majeure under Section 11.3 of the General Terms and Conditions of EPNG's FERC Gas Tariff.
For scheduling questions, please call your scheduling representative at (800) 238-3764.
For operational and capacity information, please call Russ Pyeatt at (719) 520-3729, Dan English at (719) 520-4722, Morgan McCasland at (719) 520-4339 or John Althoff at (719) 667-7750.
For media inquiries, please contact media relations at media_relations@kindermorgan.com.
El Paso Natural Gas (EPNG)

[MAINTENANCE] SEG 25 - UNIT MAINTENANCE - CS 302

SEV 1/5
Informational

Not scored -- external_id 'EPNG-47097' shares its numeric ID and exact title with 'NGPL-47097' under a different pipeline code. Very likely the same underlying notice scraped twice under two different labels (see kindermorgan.py v19 changelog / audit_km_contamination.py) rather than two independent events. No Claude API call was made for this notice. Needs manual review to confirm which pipeline (if either) is correct before it's trusted.

Not scored -- suspected cross-pipeline duplicate, needs manual review.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: SEG 25 - UNIT MAINTENANCE - CS 302
Posted: 07/16/2026 10:16:36AM
Effective: 07/16/2026 10:16:36AM
End Date: 08/31/2026 9:00:00AM

TSP/TSP Name:  8001703-EL PASO NATURAL GAS CO. L.L.C. Critical: Y
Notice Type Desc (1):  CAPACITY CONSTRAINT Notice Type Desc (2):  SEGMENTS
Notice Eff Date/Time:  07/28/2026 4:23:45PM Notice End Date/Time:  07/29/2026 9:00:00am
Post Date/Time:  7/28/2026 4:23:45 PM Notice ID: 629143
Reqrd Rsp:  5 Rsp Date/Time: 
Notice Stat Desc:  INITIATE Prior Notice: 
Subject:  EPNG OPEN FOR CONFIRMATIONS ID2
Notice Text:
EPNG OPEN FOR CONFIRMATIONS - INTRADAY 2 CYCLE
EPNG is open for Gas Day July 28, 2026 Intraday 2 cycle confirmations.
Capacity reductions were performed at the following segment(s):
Segment 200 - NORTH ML
Segment 690 - PLAIN ST
Segment 940 - L2KWNKBH
Segment 1760 - LORDSBRG
Please call the EPNG scheduling Hot Line 800-238-3764 Option 1 with any questions.
El Paso Natural Gas (EPNG)

[MAINTENANCE] SEG 26-GC #3 ML-LIL TOOL RUNS-UPD2

SEV 1/5
Informational

Not scored -- external_id 'EPNG-47096' shares its numeric ID and exact title with 'NGPL-47096' under a different pipeline code. Very likely the same underlying notice scraped twice under two different labels (see kindermorgan.py v19 changelog / audit_km_contamination.py) rather than two independent events. No Claude API call was made for this notice. Needs manual review to confirm which pipeline (if either) is correct before it's trusted.

Not scored -- suspected cross-pipeline duplicate, needs manual review.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: SEG 26-GC #3 ML-LIL TOOL RUNS-UPD2
Posted: 07/16/2026 10:08:36AM
Effective: 07/16/2026 10:08:36AM
End Date: 08/31/2026 9:00:00AM

TSP/TSP Name:  8001703-EL PASO NATURAL GAS CO. L.L.C. Critical: Y
Notice Type Desc (1):  MAINTENANCE Notice Type Desc (2):  MAINTENANCE
Notice Eff Date/Time:  07/28/2026 4:15:26PM Notice End Date/Time:  07/29/2026 9:00:00am
Post Date/Time:  7/28/2026 4:15:26 PM Notice ID: 629141
Reqrd Rsp:  5 Rsp Date/Time: 
Notice Stat Desc:  SUPERSEDE Prior Notice:  629129
Subject:  Updated July 2026 Maintenance
Notice Text:
EPNG Maintenance Calendar
July 2026
Seg Area
 
Seg Nbr
 
Flow Dir
 
Location
 
Base Capacity (MDth)
 
Wed
1
 
Thu
2
 
Fri
3
 
Sat
4
 
Sun
5
 
Mon
6
 
Tue
7
 
Wed
8
 
Thu
9
 
Fri
10
 
Sat
11
 
Sun
12
 
Mon
13
 
Tue
14
 
Wed
15
 
Thu
16
 
Fri
17
 
Sat
18
 
Sun
19
 
Mon
20
 
Tue
21
 
Wed
22
 
Thu
23
 
Fri
24
 
Sat
25
 
Sun
26
 
Mon
27
 
Tue
28
 
Wed
29
 
Thu
30
 
Fri
31
Anadarko
 
690
 
F
 
PLAIN ST
 
756
 
405
 
405
 
405
 
405
 
405
 
405
 
405
 
405
 
405
 
405
 
405
 
405
 
405
 
405
 
405
 
405
 
405
 
405
 
405
 
405
 
405
 
405
 
405
 
405
 
405
 
405
 
405
 
405
 
405
 
405
 
405
 
 
 
 
 
 
% Seg Avail
 
756
 
46%
 
46%
 
46%
 
46%
 
46%
 
46%
 
46%
 
46%
 
46%
 
46%
 
46%
 
46%
 
46%
 
46%
 
46%
 
46%
 
46%
 
46%
 
46%
 
46%
 
46%
 
46%
 
46%
 
46%
 
46%
 
46%
 
46%
 
46%
 
46%
 
46%
 
46%
Anadarko
 
715
 
B
 
PLAINS N
 
312
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
112
 
112
 
112
 
112
 
112
 
112
 
112
 
112
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
112
 
112
 
112
 
112
 
112
 
112
 
112
 
112
 
112
 
 
 
 
 
 
% Seg Avail
 
312
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
64%
 
64%
 
64%
 
64%
 
64%
 
64%
 
64%
 
64%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
64%
 
64%
 
64%
 
64%
 
64%
 
64%
 
64%
 
64%
 
64%
Anadarko
 
740
 
B
 
AMAR N
 
292
 
42
 
42
 
42
 
42
 
42
 
42
 
42
 
42
 
42
 
42
 
42
 
42
 
42
 
42
 
42
 
42
 
42
 
42
 
42
 
42
 
42
 
42
 
42
 
42
 
42
 
42
 
42
 
42
 
42
 
42
 
42
 
 
 
 
 
 
% Seg Avail
 
292
 
86%
 
86%
 
86%
 
86%
 
86%
 
86%
 
86%
 
86%
 
86%
 
86%
 
86%
 
86%
 
86%
 
86%
 
86%
 
86%
 
86%
 
86%
 
86%
 
86%
 
86%
 
86%
 
86%
 
86%
 
86%
 
86%
 
86%
 
86%
 
86%
 
86%
 
86%
Anadarko
 
740
 
F
 
AMAR S
 
309
 
49
 
49
 
49
 
49
 
49
 
49
 
49
 
83
 
83
 
83
 
83
 
83
 
83
 
83
 
83
 
49
 
49
 
49
 
49
 
49
 
49
 
49
 
83
 
83
 
83
 
83
 
83
 
83
 
83
 
83
 
83
 
 
 
 
 
 
% Seg Avail
 
309
 
84%
 
84%
 
84%
 
84%
 
84%
 
84%
 
84%
 
73%
 
73%
 
73%
 
73%
 
73%
 
73%
 
73%
 
73%
 
84%
 
84%
 
84%
 
84%
 
84%
 
84%
 
84%
 
73%
 
73%
 
73%
 
73%
 
73%
 
73%
 
73%
 
73%
 
73%
Anadarko
 
760
 
F
 
DUMAS S
 
310
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
0
 
0
 
0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
% Seg Avail
 
310
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
Anadarko
 
780
 
B
 
DUMAS E
 
169
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
0
 
0
 
0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
% Seg Avail
 
169
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
Lincoln Crossover
 
640
 
B
 
CAPROCK N
 
608
 
74
 
74
 
74
 
74
 
74
 
74
 
74
 
74
 
74
 
74
 
74
 
74
 
74
 
74
 
74
 
74
 
74
 
74
 
74
 
74
 
74
 
154
 
154
 
74
 
74
 
74
 
74
 
74
 
74
 
74
 
74
 
 
 
 
 
 
% Seg Avail
 
608
 
88%
 
88%
 
88%
 
88%
 
88%
 
88%
 
88%
 
88%
 
88%
 
88%
 
88%
 
88%
 
88%
 
88%
 
88%
 
88%
 
88%
 
88%
 
88%
 
88%
 
88%
 
75%
 
75%
 
88%
 
88%
 
88%
 
88%
 
88%
 
88%
 
88%
 
88%
Lincoln Crossover
 
645
 
B
 
LUSK
 
284
 
22
 
22
 
22
 
22
 
22
 
22
 
22
 
22
 
22
 
22
 
22
 
22
 
22
 
22
 
22
 
22
 
22
 
22
 
22
 
22
 
22
 
22
 
22
 
22
 
22
 
22
 
22
 
22
 
22
 
22
 
22
 
 
 
 
 
 
% Seg Avail
 
284
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
Line 1903
 
3000
 
F
 
MOJTHRU
 
463
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
117
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
% Seg Avail
 
463
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
75%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
Maricopa
 
540
 
F
 
N PHX1
 
121
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
0
 
0
 
0
 
0
 
 
 
 
 
 
% Seg Avail
 
121
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
Mojave Seamless
 
3040
 
F
 
MOJAVE
 
400
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
54
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
% Seg Avail
 
400
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
87%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
North Mainline
 
200
 
F
 
NORTH ML
 
2223
 
 
 
 
 
 
 
 
 
 
 
654
 
654
 
565
 
565
 
565
 
565
 
565
 
565
 
629
 
629
 
629
 
629
 
629
 
629
 
798
 
629
 
629
 
629
 
629
 
629
 
629
 
629
 
629
 
629
 
629
 
629
 
 
 
 
 
 
% Seg Avail
 
2223
 
100%
 
100%
 
100%
 
100%
 
100%
 
71%
 
71%
 
75%
 
75%
 
75%
 
75%
 
75%
 
75%
 
72%
 
72%
 
72%
 
72%
 
72%
 
72%
 
64%
 
72%
 
72%
 
72%
 
72%
 
72%
 
72%
 
72%
 
72%
 
72%
 
72%
 
72%
North Mainline
 
240
 
 
 
314808 (ITWWINRK)
 
307
 
 
 
 
 
 
 
 
 
 
 
307
 
307
 
307
 
307
 
307
 
307
 
307
 
307
 
307
 
307
 
307
 
307
 
307
 
307
 
307
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
% Seg Avail
 
307
 
100%
 
100%
 
100%
 
100%
 
100%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
Permian Virtual Segment
 
940
 
F
 
BENCRANE
 
230
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
0
 
0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
0
 
230
 
230
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Permian Virtual Segment
 
940
 
F
 
GUADLUP
 
1154
 
 
 
 
 
 
 
 
 
 
 
 
 
167
 
167
 
570
 
570
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
Permian Virtual Segment
 
940
 
F
 
KEYST ST
 
781
 
229
 
229
 
229
 
229
 
229
 
229
 
229
 
229
 
229
 
229
 
229
 
229
 
229
 
229
 
229
 
229
 
229
 
229
 
229
 
229
 
229
 
229
 
229
 
229
 
229
 
229
 
229
 
229
 
229
 
229
 
229
Permian Virtual Segment
 
940
 
F
 
KEYSTAFL
 
749
 
196
 
196
 
196
 
196
 
196
 
196
 
196
 
196
 
196
 
196
 
196
 
196
 
196
 
196
 
196
 
196
 
196
 
196
 
196
 
196
 
196
 
196
 
196
 
196
 
196
 
196
 
196
 
196
 
196
 
196
 
196
Permian Virtual Segment
 
940
 
F
 
L2000
 
606
 
109
 
109
 
109
 
109
 
109
 
109
 
109
 
109
 
109
 
109
 
109
 
109
 
109
 
109
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
Permian Virtual Segment
 
940
 
F
 
PUC WAHA
 
130
 
 
 
 
 
 
 
 
 
 
 
 
 
130
 
130
 
130
 
 
 
130
 
130
 
130
 
130
 
130
 
130
 
130
 
130
 
130
 
130
 
130
 
130
 
130
 
130
 
130
 
130
 
130
 
130
 
130
 
130
 
130
Permian Virtual Segment
 
940
 
F
 
WA2CORN
 
721
 
67
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
Permian Virtual Segment
 
940
 
F
 
WAHA GE
 
600
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
600
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
Permian Virtual Segment
 
940
 
F
 
WAHACORN
 
794
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
100
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Permian Virtual Segment
 
940
 
 
 
301705 (IOWNRNCH)
 
155
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
155
 
155
 
155
 
32
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
% Seg Avail
 
155
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
0%
 
0%
 
0%
 
79%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
Permian Virtual Segment
 
940
 
 
 
314598 (IWARMONU)
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
 
 
 
 
 
% Seg Avail
 
85
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
 
0%
Permian Virtual Segment
 
940
 
 
 
314602 (IMIDKIFF)
 
110
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
110
 
110
 
110
 
22
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
% Seg Avail
 
110
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
0%
 
0%
 
0%
 
80%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
Permian Virtual Segment
 
940
 
 
 
334863 (ITRICRWN)
 
262
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
0
 
 
 
 
 
 
 
 
 
0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
% Seg Avail
 
262
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
Permian Virtual Segment
 
940
 
 
 
377078 (ISUNJAME)
 
60
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
60
 
60
 
60
 
12
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
% Seg Avail
 
60
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
0%
 
0%
 
0%
 
80%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
Permian Virtual Segment
 
940
 
 
 
377248 (IPHSPBRY)
 
34
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
34
 
34
 
34
 
7
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
% Seg Avail
 
34
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
0%
 
0%
 
0%
 
79%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
Permian Virtual Segment
 
940
 
 
 
801185 (IBRCOBND)
 
126
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
45
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
% Seg Avail
 
126
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
64%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
San Juan
 
110
 
F
 
BONDADST
 
726
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
291
 
291
 
291
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
% Seg Avail
 
726
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
60%
 
60%
 
60%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
South Mainline
 
1600
 
F
 
CORN HPW
 
575
 
 
 
 
 
 
 
 
 
 
 
53
 
53
 
53
 
53
 
53
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
South Mainline
 
1600
 
F
 
CORN LPW
 
1167
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
South Mainline
 
1600
 
F
 
CORNL2K
 
572
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
85
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
South Mainline
 
1600
 
F
 
CORNTRN
 
153
 
67
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
0
 
 
 
 
 
 
% Seg Avail
 
2467
 
94%
 
97%
 
97%
 
97%
 
97%
 
94%
 
94%
 
94%
 
94%
 
94%
 
97%
 
97%
 
97%
 
97%
 
94%
 
94%
 
94%
 
94%
 
94%
 
94%
 
94%
 
94%
 
94%
 
94%
 
94%
 
94%
 
94%
 
94%
 
94%
 
94%
 
94%
South Mainline
 
1680
 
F
 
AFTON
 
1026
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
260
 
260
 
260
 
260
 
 
 
 
 
 
 
 
 
 
 
 
 
 
South Mainline
 
1680
 
F
 
HP 2
 
573
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
South Mainline
 
1680
 
F
 
L2K-2
 
570
 
84
 
84
 
84
 
84
 
84
 
84
 
84
 
84
 
84
 
84
 
84
 
84
 
84
 
84
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
 
 
 
 
 
% Seg Avail
 
2169
 
96%
 
96%
 
96%
 
96%
 
96%
 
96%
 
96%
 
96%
 
96%
 
96%
 
96%
 
96%
 
96%
 
96%
 
94%
 
94%
 
94%
 
94%
 
94%
 
94%
 
82%
 
82%
 
82%
 
82%
 
94%
 
94%
 
94%
 
94%
 
94%
 
94%
 
94%
South Mainline
 
1690
 
F
 
FLOR B
 
572
 
 
 
 
 
 
 
 
 
 
 
53
 
53
 
53
 
53
 
53
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
South Mainline
 
1690
 
F
 
FLOR C
 
568
 
82
 
82
 
82
 
82
 
82
 
82
 
82
 
82
 
82
 
82
 
82
 
82
 
82
 
82
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
South Mainline
 
1690
 
F
 
FLORIDA
 
955
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
% Seg Avail
 
2095
 
96%
 
96%
 
96%
 
96%
 
96%
 
94%
 
94%
 
94%
 
94%
 
94%
 
96%
 
96%
 
96%
 
96%
 
93%
 
93%
 
93%
 
93%
 
93%
 
93%
 
93%
 
93%
 
93%
 
93%
 
93%
 
93%
 
93%
 
93%
 
93%
 
93%
 
93%
South Mainline
 
1740
 
F
 
HP 3
 
572
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
South Mainline
 
1740
 
F
 
L2K-3
 
568
 
82
 
82
 
82
 
82
 
82
 
82
 
82
 
82
 
82
 
82
 
82
 
82
 
82
 
82
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
South Mainline
 
1740
 
F
 
REDMTN
 
875
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
117
 
117
 
117
 
 
 
 
 
 
 
 
 
 
 
 
 
117
 
117
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
% Seg Avail
 
2015
 
96%
 
96%
 
96%
 
96%
 
96%
 
96%
 
96%
 
96%
 
96%
 
96%
 
96%
 
96%
 
96%
 
90%
 
87%
 
87%
 
93%
 
93%
 
93%
 
93%
 
93%
 
93%
 
87%
 
87%
 
93%
 
93%
 
93%
 
93%
 
93%
 
93%
 
93%
South Mainline
 
1760
 
F
 
LORDS B
 
570
 
 
 
 
 
 
 
 
 
 
 
53
 
53
 
53
 
53
 
53
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
South Mainline
 
1760
 
F
 
LORDS C
 
566
 
82
 
82
 
82
 
82
 
82
 
82
 
82
 
82
 
82
 
82
 
82
 
82
 
82
 
82
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
South Mainline
 
1760
 
F
 
LORDSBRG
 
963
 
215
 
215
 
215
 
215
 
215
 
215
 
215
 
215
 
215
 
215
 
215
 
215
 
215
 
215
 
215
 
215
 
215
 
215
 
215
 
215
 
215
 
215
 
215
 
215
 
215
 
215
 
215
 
215
 
215
 
215
 
215
 
 
 
 
 
 
% Seg Avail
 
2099
 
86%
 
86%
 
86%
 
86%
 
86%
 
83%
 
83%
 
83%
 
83%
 
83%
 
86%
 
86%
 
86%
 
86%
 
83%
 
83%
 
83%
 
83%
 
83%
 
83%
 
83%
 
83%
 
83%
 
83%
 
83%
 
83%
 
83%
 
83%
 
83%
 
83%
 
83%
South Mainline
 
1800
 
F
 
BOWIE
 
568
 
 
 
 
 
 
 
 
 
 
 
53
 
53
 
53
 
53
 
53
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
South Mainline
 
1800
 
F
 
CIMARRON
 
563
 
82
 
82
 
82
 
82
 
82
 
82
 
82
 
82
 
82
 
82
 
82
 
82
 
82
 
82
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
South Mainline
 
1800
 
F
 
DRAGOON
 
709
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
% Seg Avail
 
1840
 
96%
 
96%
 
96%
 
96%
 
96%
 
93%
 
93%
 
93%
 
93%
 
93%
 
96%
 
96%
 
96%
 
96%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
South Mainline
 
1885
 
F
 
WILCLAT
 
309
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
0
 
 
 
 
 
 
 
 
 
 
 
 
% Seg Avail
 
309
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
South Mainline
 
1920
 
F
 
ORACLE
 
566
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
South Mainline
 
1920
 
F
 
TOM MIX
 
560
 
80
 
80
 
80
 
80
 
80
 
80
 
80
 
80
 
80
 
80
 
80
 
80
 
80
 
80
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
 
140
South Mainline
 
1920
 
F
 
VAIL
 
657
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
% Seg Avail
 
1783
 
96%
 
96%
 
96%
 
96%
 
96%
 
96%
 
96%
 
96%
 
96%
 
96%
 
96%
 
96%
 
96%
 
96%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
 
92%
South Mainline
 
2020
 
F
 
CASA C
 
558
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
South Mainline
 
2020
 
F
 
CASAG LP
 
504
 
 
 
 
 
 
 
 
 
 
 
 
 
55
 
55
 
55
 
55
 
55
 
55
 
55
 
55
 
55
 
55
 
55
 
 
 
 
 
38
 
38
 
38
 
38
 
38
 
38
 
38
 
38
 
38
 
38
 
38
 
38
South Mainline
 
2020
 
F
 
CG HP
 
564
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
% Seg Avail
 
1626
 
100%
 
100%
 
100%
 
100%
 
100%
 
100%
 
97%
 
97%
 
97%
 
97%
 
97%
 
97%
 
97%
 
97%
 
97%
 
97%
 
97%
 
100%
 
100%
 
98%
 
98%
 
98%
 
98%
 
98%
 
98%
 
98%
 
98%
 
98%
 
98%
 
98%
 
98%
Start Date
 
End Date
 
Region
 
Scheduling Location
 
Maintenance List
 
Base Capacity Dthd
 
Total Reduction Dthd
 
PLM Reduction Dthd
 
FMJ Reduction Dthd
 
Net Dthd
 
Update
07/21/26
 
07/23/26
 
SJ
 
BONDADST
 
Line 1205 cleaning and smart tools Bondad to Blanco
 
                          726,500
 
                              291,632
 
                             291,632
 
                                         -
 
       434,868
 
07/06/26
 
07/06/26
 
NM
 
NORTH ML
 
Window Rock 7A DOT/ESD Tests
Window Rock B Station DOT/ESD Tests
Window Rock Station A Station DOT/ESD Tests
 
                       2,223,400
 
                              654,405
 
                             654,405
 
                                         -
 
   1,568,995
 
07/07/26
 
07/07/26
 
NM
 
NORTH ML
 
Window Rock 7A DOT/ESD Tests
Window Rock B Station DOT/ESD Tests
 
                       2,223,400
 
                              654,405
 
                             654,405
 
                                         -
 
   1,568,995
 
07/08/26
 
07/08/26
 
NM
 
NORTH ML
 
Window Rock B Station DOT/ESD Tests
 
                       2,223,400
 
                              565,613
 
                             565,613
 
                                         -
 
   1,657,787
 
07/09/26
 
07/13/26
 
NM
 
NORTH ML
 
Window Rock B Station DOT/ESD Tests - Extended
 
                       2,223,400
 
                              565,613
 
                             565,613
 
                                         -
 
   1,657,787
 
07/14/26
 
07/19/26
 
NM
 
NORTH ML
 
Williams C Station maintenance
 
                       2,223,400
 
                              629,180
 
                             629,180
 
                                         -
 
   1,594,220
 
07/20/26
 
07/20/26
 
NM
 
NORTH ML
 
Line 1200 pipeline maintenance Flagstaff to MLV 30.75
Williams C Station maintenance
 
                       2,223,400
 
                              798,692
 
                             798,692
 
                                         -
 
   1,424,708
 
07/21/26
 
07/24/26
 
NM
 
NORTH ML
 
Line 1200 pipeline maintenance Flagstaff to MLV 30.75 - Completed
Williams C Station maintenance
 
                       2,223,400
 
                              629,180
 
                             629,180
 
                                         -
 
   1,594,220
 
07/25/26
 
07/26/26
 
NM
 
NORTH ML
 
Williams C Station maintenance
 
                       2,223,400
 
                              629,180
 
                             629,180
 
                                         -
 
   1,594,220
 
07/27/26
 
07/27/26
 
NM
 
NORTH ML
 
Navajo 2D maintenance
Williams C Station maintenance
 
                       2,223,400
 
                              629,180
 
                             629,180
 
                                         -
 
   1,594,220
 
07/28/26
 
07/31/26
 
NM
 
NORTH ML
 
Dilkon 1B maintenance
Leupp C and D Station maintenance - Rescheduled
Navajo 2D maintenance
Williams C Station maintenance
 
                       2,223,400
 
                              629,180
 
                             629,180
 
                                         -
 
   1,594,220
 
07/06/26
 
07/08/26
 
NM
 
314808
 
Transwestern Window Rock Delivery - (ITWWINRK) - Customer reduced to zero Dth/d net capacity during Window Rock B Station maintenance
 
                          307,800
 
                              307,800
 
                             307,800
 
                                         -
 
                    -
 
07/09/26
 
07/20/26
 
NM
 
314808
 
Transwestern Window Rock Delivery - (ITWWINRK) - Customer reduced to zero Dth/d net capacity during Window Rock B Station maintenance -Extended
 
                          307,800
 
                              307,800
 
                             307,800
 
                                         -
 
                    -
 
07/28/26
 
07/30/26
 
NM
 
N PHX1
 
Line 1203 cleaning and smart tools Ashfork to North Phoenix - Revised Capacity Impact Dth/d - Capacity Restored
 
                          121,800
 
                                           -
 
                                          -
 
                                         -
 
       121,800
 
07/31/26
 
07/31/26
 
NM
 
N PHX1
 
Line 1203 cleaning and smart tools Ashfork to North Phoenix - Revised Capacity Impact Dth/d - Capacity Restored
 
                          121,800
 
                                           -
 
                                          -
 
                                         -
 
       121,800
 
07/24/26
 
07/24/26
 
MOJ
 
MOJTHRU
 
Mojave 1A maintenance
 
                          463,000
 
                              117,000
 
                             117,000
 
                                         -
 
       346,000
 
07/24/26
 
07/24/26
 
MOJ
 
MOJAVE
 
Mojave 1A maintenance
 
                          400,000
 
                                54,000
 
                               54,000
 
                                         -
 
       346,000
 
07/01/26
 
07/21/26
 
XO
 
CAPROCK N
 
Caprock 2A equipment failure repair - FMJ Reduction
 
                          608,500
 
                                74,260
 
                                          -
 
                              74,260
 
       534,240
 
07/22/26
 
07/23/26
 
XO
 
CAPROCK N
 
Caprock 2A equipment failure repair - FMJ Reduction
Laguna Station DOT/ESD Tests
 
                          608,500
 
                              154,568
 
                               80,308
 
                              74,260
 
       453,932
 
07/24/26
 
07/31/26
 
XO
 
CAPROCK N
 
Caprock 2A equipment failure repair - FMJ Reduction
 
                          608,500
 
                                74,260
 
                                          -
 
                              74,260
 
       534,240
 
07/01/26
 
07/31/26
 
XO
 
LUSK
 
Caprock 2A equipment failure repair - FMJ Reduction
 
                          284,900
 
                                22,350
 
                                          -
 
                              22,350
 
       262,550
 
07/01/26
 
07/31/26
 
AN
 
AMAR N
 
Amarillo 2A equipment failure repair - FMJ Reduction
 
                          292,100
 
                                42,100
 
                                          -
 
                              42,100
 
       250,000
 
07/01/26
 
07/07/26
 
AN
 
AMAR S
 
Amarillo 2A equipment failure repair - FMJ Reduction
 
                          309,100
 
                                49,100
 
                                          -
 
                              49,100
 
       260,000
 
07/08/26
 
07/15/26
 
AN
 
AMAR S
 
Amarillo 2A equipment failure repair - FMJ Reduction
Line No. 1102 anomaly repairs Plains to Dimmitt - MLV 20 to MLV 16 - FMJ Reduction
 
                          309,100
 
                                83,124
 
                                          -
 
                              83,124
 
       225,976
 
07/16/26
 
07/22/26
 
AN
 
AMAR S
 
Amarillo 2A equipment failure repair - FMJ Reduction
Line No. 1102 anomaly repairs Plains to Dimmitt - MLV 20 to MLV 16 - Completed
 
                          309,100
 
                                49,100
 
                                          -
 
                              49,100
 
       260,000
 
07/23/26
 
07/31/26
 
AN
 
AMAR S
 
Line No. 1102 anomaly repairs Plains to Dimmitt - MLV 16 to MLV 14 - FMJ Reduction
 
                          309,100
 
                                83,124
 
                                          -
 
                              83,124
 
       225,976
 
07/14/26
 
07/16/26
 
AN
 
DUMAS E
 
Dumas Station DOT/ESD Tests - Rescheduled
 
                          169,800
 
                                           -
 
                                          -
 
                                         -
 
       169,800
 
07/14/26
 
07/16/26
 
AN
 
DUMAS S
 
Dumas Station DOT/ESD Tests - Rescheduled
 
                          310,100
 
                                           -
 
                                          -
 
                                         -
 
       310,100
 
07/08/26
 
07/15/26
 
AN
 
PLAINS N
 
Line No. 1102 anomaly repairs Plains to Dimmitt - MLV 20 to MLV 16 - FMJ Reduction
 
                          312,500
 
                              112,500
 
                                          -
 
                            112,500
 
       200,000
 
07/16/26
 
07/22/26
 
AN
 
PLAINS N
 
Line No. 1102 anomaly repairs Plains to Dimmitt - MLV 20 to MLV 16 - Completed
 
                          312,500
 
                                           -
 
                                          -
 
                                         -
 
       312,500
 
07/23/26
 
07/31/26
 
AN
 
PLAINS N
 
Line No. 1102 anomaly repairs Plains to Dimmit - MLV 16 to MLV 14 - FMJ Reduction
 
                          312,500
 
                              112,500
 
                                          -
 
                            112,500
 
       200,000
 
07/01/26
 
07/31/26
 
PR
 
PLAIN ST
 
Plains 7A repair
Plains 8A repair
Plains 11A repair
Plains 13A repair
Plains 14A repair
Plains 15A repair
Plains Station equipment failure repair - FMJ Reduction
 
                          756,100
 
                              405,923
 
                             293,371
 
                            112,552
 
       350,177
 
07/01/26
 
07/31/26
 
PR
 
314598
 
Monument A Station equipment failure repair - Warren Monument Receipt (IWARMONU) - Customer to zero Dth/d during Monument A Station mechanical failure repair - FMJ Reduction
 
                             85,739
 
                                85,739
 
                                          -
 
                              85,739
 
                    -
 
07/01/26
 
07/31/26
 
PR
 
KEYST ST
 
Keystone 4A repair
Keystone 11A repair
Keystone 1B repair
Keystone 2B repair
 
                          781,000
 
                              229,021
 
                             229,021
 
                                         -
 
       551,979
 
07/01/26
 
07/31/26
 
PR
 
KEYSTAFL
 
Keystone 4A repair
Keystone 11A repair
Keystone 1B repair
Keystone 2B repair
 
                          749,000
 
                              196,991
 
                             196,991
 
                                         -
 
       552,009
 
07/14/26
 
07/16/26
 
PR
 
377248
 
Phillips Sprayberry Receipt - (IPHSPBRY) - Customer reduced to zero Dth/d during Line 3114 Pipeline Replacement
 
                             34,060
 
                                34,060
 
                               34,060
 
                                         -
 
                    -
 
07/17/26
 
07/17/26
 
PR
 
377248
 
Phillips Sprayberry Receipt - (IPHSPBRY) - Customer reduced to zero Dth/d during Line 3114 Pipeline Replacement - Completed
 
                             34,060
 
                                   7,096
 
                                  7,096
 
                                         -
 
         26,964
 
07/14/26
 
07/16/26
 
PR
 
377078
 
WTG Jameson Receipt - (ISUNJAME) - Customer reduced to zero Dth/d during Line 3114 Pipeline Replacement
 
                             60,080
 
                                60,080
 
                               60,080
 
                                         -
 
                    -
 
07/17/26
 
07/17/26
 
PR
 
377078
 
WTG Jameson Receipt - (ISUNJAME) - Customer reduced to zero Dth/d during Line 3114 Pipeline Replacement - Completed
 
                             60,080
 
                                12,517
 
                               12,517
 
                                         -
 
         47,563
 
07/14/26
 
07/16/26
 
PR
 
314602
 
Midkiff Receipt - (IMIDKIFF) - Customer reduced to zero Dth/d during Line 3114 Pipeline Replacement
 
                          110,250
 
                              110,250
 
                             110,250
 
                                         -
 
                    -
 
07/17/26
 
07/17/26
 
PR
 
314602
 
Midkiff Receipt - (IMIDKIFF) - Customer reduced to zero Dth/d during Line 3114 Pipeline Replacement - Completed
 
                          110,250
 
                                22,969
 
                               22,969
 
                                         -
 
         87,281
 
07/14/26
 
07/16/26
 
PR
 
301705
 
Owens Ranch Receipt - (IOWNRNCH) - Customer reduced to zero Dth/d during Line 3114 Pipeline Replacement
 
                          155,850
 
                              155,850
 
                             155,850
 
                                         -
 
                    -
 
07/17/26
 
07/17/26
 
PR
 
301705
 
Owens Ranch Receipt - (IOWNRNCH) - Customer reduced to zero Dth/d during Line 3114 Pipeline Replacement - Completed
 
                          155,850
 
                                32,469
 
                               32,469
 
                                         -
 
       123,381
 
07/09/26
 
07/09/26
 
PR
 
801185
 
Bronco Benedum Receipt - (IBRCOBND) - Customer limited to 80,009 Dth/d net capacity for meter station maintenance
 
                          126,000
 
                                45,991
 
                               45,991
 
                                         -
 
         80,009
 
07/08/26
 
07/09/26
 
PR
 
BENCRANE
 
Line 1105 pipeline maintenance Benedum to Crane - Rescheduled
 
                          230,100
 
                                           -
 
                                          -
 
                                         -
 
       230,100
 
07/21/26
 
07/21/26
 
PR
 
BENCRANE
 
Line 1105 pipeline maintenance Benedum to Crane - Rescheduled
 
                          230,100
 
                                           -
 
                                          -
 
                                         -
 
       230,100
 
07/22/26
 
07/23/26
 
PR
 
BENCRANE
 
Line 1105 pipeline maintenance Benedum to Crane
 
                          230,100
 
                              230,100
 
                             230,100
 
                                         -
 
                    -
 
07/07/26
 
07/09/26
 
PR
 
PUC WAHA
 
Line 3160 cleaning and smart tool runs Gomez Field to Waha Plant
 
                          130,000
 
                              130,000
 
                             130,000
 
                                         -
 
                    -
 
07/11/26
 
07/31/26
 
PR
 
PUC WAHA
 
Puckett Station equipment failure repair - FMJ Reduction
 
                          130,000
 
                              130,000
 
                                          -
 
                            130,000
 
                    -
 
07/21/26
 
07/21/26
 
PR
 
WAHA GE
 
Line No. 3162 Line Strike Wink to Waha - FMJ Reduction
 
                          600,000
 
                              600,000
 
                                          -
 
                            600,000
 
                    -
 
07/22/26
 
07/31/26
 
PR
 
WAHA GE
 
Line No. 3162 Line Strike Wink to Waha - Completed
 
                          600,000
 
                                           -
 
                                          -
 
                                         -
 
       600,000
 
07/31/26
 
07/31/26
 
PR
 
WAHACORN
 
Line 1600 pipeline maintenance Waha to Gresham
 
                          794,746
 
                              100,173
 
                             100,173
 
                                         -
 
       694,573
 
Update
07/01/26
 
07/01/26
 
PR
 
WA2CORN
 
Gresham Station mechanical failure repair - FMJ Reduction
 
                          721,900
 
                                67,738
 
                                          -
 
                              67,738
 
       654,162
 
07/02/26
 
07/31/26
 
PR
 
WA2CORN
 
Gresham Station mechanical failure repair - Completed
 
                          721,900
 
                                           -
 
                                          -
 
                                         -
 
       721,900
 
07/07/26
 
07/08/26
 
PR
 
GUADLUP
 
Line No. 1103 anomaly repair Guadalupe to Cornudas - FMJ Reduction
 
                       1,154,000
 
                              167,939
 
                                          -
 
                            167,939
 
       986,061
 
07/09/26
 
07/10/26
 
PR
 
GUADLUP
 
Line No. 1103 anomaly repair Guadalupe to Cornudas - FMJ Reduction - Revised Capacity Impact Dth/d
 
                       1,154,000
 
                              570,000
 
                                          -
 
                            570,000
 
       584,000
 
07/11/26
 
07/31/26
 
PR
 
GUADLUP
 
Line No. 1103 anomaly repair Guadalupe to Cornudas - Completed
 
                       1,154,000
 
                                           -
 
                                          -
 
                                         -
 
   1,154,000
 
07/01/26
 
07/01/26
 
PR
 
CORNTRN
 
Gresham Station mechanical failure repair - FMJ Reduction
 
                          153,200
 
                                67,738
 
                                          -
 
                              67,738
 
         85,462
 
07/02/26
 
07/31/26
 
PR
 
CORNTRN
 
Gresham Station mechanical failure repair - Completed
 
                          153,200
 
                                           -
 
                                          -
 
                                         -
 
       153,200
 
07/21/26
 
07/24/26
 
SM
 
AFTON
 
Afton Station DOT/ESD Tests
 
                       1,026,200
 
                              260,390
 
                             260,390
 
                                         -
 
       765,810
 
07/14/26
 
07/16/26
 
SM
 
REDMTN
 
Red Mountain Station DOT/ESD Tests
 
                          875,900
 
                              117,458
 
                             117,458
 
                                         -
 
       758,442
 
07/23/26
 
07/24/26
 
SM
 
REDMTN
 
Red Mountain Station maintenance
 
                          875,900
 
                              117,458
 
                             117,458
 
                                         -
 
       758,442
 
07/01/26
 
07/31/26
 
SM
 
LORDSBRG
 
San Simon Station equipment failure repair - FMJ Reduction
 
                          963,300
 
                              215,243
 
                                          -
 
                            215,243
 
       748,057
 
07/28/26
 
07/28/26
 
SM
 
WILCLAT
 
Willcox Station maintenance - Rescheduled
 
                          309,468
 
                                           -
 
                                          -
 
                                         -
 
       309,468
 
07/07/26
 
07/17/26
 
PHX
 
CASAG LP
 
Line 1103 hydrotest Tucson to Casa Grande
 
                          504,600
 
                                55,652
 
                               55,652
 
                                         -
 
       448,948
 
07/20/26
 
07/31/26
 
PHX
 
CASAG LP
 
Line 1100 hydrotest Tucson to Casa Grande
 
                          504,600
 
                                38,137
 
                               38,137
 
                                         -
 
       466,463
 
07/06/26
 
07/10/26
 
SM
 
CORN HPW
 
Florida 1B maintenance
 
                          575,400
 
                                53,507
 
                               53,507
 
                                         -
 
       521,893
 
07/06/26
 
07/10/26
 
SM
 
FLOR B
 
Florida 1B maintenance
 
                          572,000
 
                                53,507
 
                               53,507
 
                                         -
 
       518,493
 
07/06/26
 
07/10/26
 
SM
 
LORDS B
 
Florida 1B maintenance
 
                          570,200
 
                                53,507
 
                               53,507
 
                                         -
 
       516,693
 
07/06/26
 
07/10/26
 
SM
 
BOWIE
 
Florida 1B maintenance
 
                          568,300
 
                                53,507
 
                               53,507
 
                                         -
 
       514,793
 
07/22/26
 
07/22/26
 
PR
 
334863
 
Triple Crown Receipt - (ITRICRWN) - Customer limited to zero Dth/d flow for 9 hours during meter station maintenance - Rescheduled
 
                          262,500
 
                                           -
 
                                          -
 
                                         -
 
       262,500
 
07/27/26
 
07/27/26
 
PR
 
334863
 
Triple Crown Receipt - (ITRICRWN) - Customer limited to zero Dth/d flow for 9 hours during meter station maintenance - Postponed
 
                          262,500
 
                                           -
 
                                          -
 
                                         -
 
       262,500
 
07/01/26
 
07/14/26
 
PR
 
L2000
 
Florida 1C equipment failure repair - FMJ Reduction
 
                          606,600
 
                              109,769
 
                                          -
 
                            109,769
 
       496,831
 
07/15/26
 
07/31/26
 
PR
 
L2000
 
Florida 1C equipment failure repair - FMJ Reduction - Revised Capacity Impact Dth/d
 
                          606,600
 
                              140,000
 
                                          -
 
                            140,000
 
       466,600
 
07/01/26
 
07/14/26
 
SM
 
CORNL2K
 
Florida 1C equipment failure repair - FMJ Reduction
 
                          572,800
 
                                85,497
 
                                          -
 
                              85,497
 
       487,303
 
07/15/26
 
07/26/26
 
SM
 
CORNL2K
 
Florida 1C equipment failure repair - FMJ Reduction - Revised Capacity Impact Dth/d
 
                          572,800
 
                              140,000
 
                                          -
 
                            140,000
 
       432,800
 
07/27/26
 
07/31/26
 
SM
 
CORNL2K
 
Florida 1C equipment failure repair - FMJ Reduction - Revised Capacity Impact Dth/d
Tom Mix 1A maintenance - Revised Capacity Impact Dth/d with Florida 1C equipment failure repair FMJ Reduction
 
                          572,800
 
                              140,000
 
                                          -
 
                            140,000
 
       432,800
 
07/01/26
 
07/14/26
 
SM
 
L2K-2
 
Florida 1C equipment failure repair - FMJ Reduction
 
                          570,600
 
                                84,606
 
                                          -
 
                              84,606
 
       485,994
 
07/15/26
 
07/26/26
 
SM
 
L2K-2
 
Florida 1C equipment failure repair - FMJ Reduction - Revised Capacity Impact Dth/d
 
                          570,600
 
                              140,000
 
                                          -
 
                            140,000
 
       430,600
 
07/27/26
 
07/31/26
 
SM
 
L2K-2
 
Florida 1C equipment failure repair - FMJ Reduction - Revised Capacity Impact Dth/d
Tom Mix 1A maintenance - Revised Capacity Impact Dth/d with Florida 1C equipment failure repair FMJ Reduction
 
                          570,600
 
                              140,000
 
                                          -
 
                            140,000
 
       430,600
 
07/01/26
 
07/14/26
 
SM
 
FLOR C
 
Florida 1C equipment failure repair - FMJ Reduction
 
                          568,300
 
                                82,306
 
                                          -
 
                              82,306
 
       485,994
 
07/15/26
 
07/26/26
 
SM
 
FLOR C
 
Florida 1C equipment failure repair - FMJ Reduction - Revised Capacity Impact Dth/d
 
                          568,300
 
                              140,000
 
                                          -
 
                            140,000
 
       428,300
 
07/27/26
 
07/31/26
 
SM
 
FLOR C
 
Florida 1C equipment failure repair - FMJ Reduction - Revised Capacity Impact Dth/d
Tom Mix 1A maintenance - Revised Capacity Impact Dth/d with Florida 1C equipment failure repair FMJ Reduction
 
                          568,300
 
                              140,000
 
                                          -
 
                            140,000
 
       428,300
 
07/01/26
 
07/14/26
 
SM
 
L2K-3
 
Florida 1C equipment failure repair - FMJ Reduction
 
                          568,300
 
                                82,306
 
                                          -
 
                              82,306
 
       485,994
 
07/15/26
 
07/26/26
 
SM
 
L2K-3
 
Florida 1C equipment failure repair - FMJ Reduction - Revised Capacity Impact Dth/d
 
                          568,300
 
                              140,000
 
                                          -
 
                            140,000
 
       428,300
 
07/27/26
 
07/31/26
 
SM
 
L2K-3
 
Florida 1C equipment failure repair - FMJ Reduction - Revised Capacity Impact Dth/d
Tom Mix 1A maintenance - Revised Capacity Impact Dth/d with Florida 1C equipment failure repair FMJ Reduction
 
                          568,300
 
                              140,000
 
                                          -
 
                            140,000
 
       428,300
 
07/01/26
 
07/14/26
 
SM
 
LORDS C
 
Florida 1C equipment failure repair - FMJ Reduction
 
                          566,100
 
                                82,347
 
                                          -
 
                              82,347
 
       483,753
 
07/15/26
 
07/26/26
 
SM
 
LORDS C
 
Florida 1C equipment failure repair - FMJ Reduction - Revised Capacity Impact Dth/d
 
                          566,100
 
                              140,000
 
                                          -
 
                            140,000
 
       426,100
 
07/27/26
 
07/31/26
 
SM
 
LORDS C
 
Florida 1C equipment failure repair - FMJ Reduction - Revised Capacity Impact Dth/d
Tom Mix 1A maintenance - Revised Capacity Impact Dth/d with Florida 1C equipment failure repair FMJ Reduction
 
                          566,100
 
                              140,000
 
                                          -
 
                            140,000
 
       426,100
 
07/01/26
 
07/14/26
 
SM
 
CIMARRON
 
Florida 1C equipment failure repair - FMJ Reduction
 
                          563,900
 
                                82,301
 
                                          -
 
                              82,301
 
       481,599
 
07/15/26
 
07/26/26
 
SM
 
CIMARRON
 
Florida 1C equipment failure repair - FMJ Reduction - Revised Capacity Impact Dth/d
 
                          563,900
 
                              140,000
 
                                          -
 
                            140,000
 
       423,900
 
07/27/26
 
07/31/26
 
SM
 
CIMARRON
 
Florida 1C equipment failure repair - FMJ Reduction - Revised Capacity Impact Dth/d
Tom Mix 1A maintenance - Revised Capacity Impact Dth/d with Florida 1C equipment failure repair FMJ Reduction
 
                          563,900
 
                              140,000
 
                                          -
 
                            140,000
 
       423,900
 
07/01/26
 
07/14/26
 
SM
 
TOM MIX
 
Florida 1C equipment failure repair - FMJ Reduction
 
                          560,900
 
                                80,785
 
                                          -
 
                              80,785
 
       480,115
 
07/15/26
 
07/26/26
 
SM
 
TOM MIX
 
Florida 1C equipment failure repair - FMJ Reduction - Revised Capacity Impact Dth/d
 
                          560,900
 
                              140,000
 
                                          -
 
                            140,000
 
       420,900
 
07/27/26
 
07/31/26
 
SM
 
TOM MIX
 
Florida 1C equipment failure repair - FMJ Reduction - Revised Capacity Impact Dth/d
Tom Mix 1A maintenance - Revised Capacity Impact Dth/d with Florida 1C equipment failure repair FMJ Reduction
 
                          560,900
 
                              140,000
 
                                          -
 
                            140,000
 
       420,900
 
In addition to planned outages, this report reflects the repairs and maintenance being performed related to Force Majeure events.
Due to the nature of such events, the dates for the associated repairs and maintenance of those events are assumed to extend until the end of the month.
These repairs and maintenance, however, may extend beyond the end of the month including beyond the current year.
More information on these repairs and maintenance will be posted as a Critical Notice under the Notices section of the Informational Postings tab on the EPNG Electronic Bulletin Board.
El Paso Natural Gas (EPNG)

[CAPACITY CONSTRAINT] FGT VERM (LOC 7936) - PRIM ONLY LIFTED

SEV 1/5
Informational

Not scored -- external_id 'EPNG-47095' shares its numeric ID and exact title with 'NGPL-47095' under a different pipeline code. Very likely the same underlying notice scraped twice under two different labels (see kindermorgan.py v19 changelog / audit_km_contamination.py) rather than two independent events. No Claude API call was made for this notice. Needs manual review to confirm which pipeline (if either) is correct before it's trusted.

Not scored -- suspected cross-pipeline duplicate, needs manual review.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: CAPACITY CONSTRAINT
Subject: FGT VERM (LOC 7936) - PRIM ONLY LIFTED
Posted: 07/16/2026 9:20:47AM
Effective: 07/16/2026 9:20:47AM
End Date: 08/31/2026 9:00:00AM

TSP/TSP Name:  8001703-EL PASO NATURAL GAS CO. L.L.C. Critical: Y
Notice Type Desc (1):  OVER-UNDER PERFORMANCE Notice Type Desc (2):  THIRD PARTY
Notice Eff Date/Time:  07/28/2026 2:40:19PM Notice End Date/Time:  07/29/2026 9:00:00am
Post Date/Time:  7/28/2026 2:40:19 PM Notice ID: 629139
Reqrd Rsp:  5 Rsp Date/Time: 
Notice Stat Desc:  SUPERSEDE Prior Notice:  629138
Subject:  Location Performance Update
Notice Text:
NOTICE TO CUSTOMERS
July 28, 2026
Location Performance Update
 
El Paso Natural Gas is concerned about the performance of the following location(s). If performance has not improved by this
afternoon, an underperformance cap will be placed on the indicated location(s) for today's gas day.
Loc
 
Loc Name
 
Flow Dir
 
Zone
 
Segment
 
Pooling Area
 
County/State
 
Action
47817
 
IEDWRDPL
 
Receipt
 
TX-P
 
940
 
KEYSTONE
 
UPTON,TX
 
Watchlist
47836
 
IJMSLAKE
 
Receipt
 
TX-P
 
940
 
KEYSTONE
 
ECTOR,TX
 
Watchlist
801264
 
IWTGBUCK
 
Receipt
 
TX-P
 
940
 
KEYSTONE
 
ECTOR,TX
 
Watchlist
49073
 
IBLAKEDR
 
Delivery
 
TX-P
 
940
 
WAHA
 
REEVES,TX
 
Watchlist
 
 
For scheduling questions, call the Nominations and Scheduling representative or the Scheduling Hotline at 1-800-238-3764.
For Marketing assistance, call your Marketing representative.
 
Freddie Salas, Manager
Nominations and Scheduling
(719) 520-4238
Freddie_salas@kindermorgan.com