Enercast — at the moment it matters
Home  /  Pipelines  /  El Paso Natural Gas (EPNG)

El Paso Natural Gas (EPNG)

85 active notices

Showing 85 notices
El Paso (EPNG)

[FORCE MAJEURE] Force Majeure – Casa Grande C Station

SEV 4/5
Force Majeure Until Further Notice 1 Days

EPNG has declared force majeure at Casa Grande C Compressor Station effective March 17, 2026 at 11:41 AM, with an expected end date of March 18, 2026 at 9:00 AM. The event duration is approximately one day. No specific capacity volume is stated in the notice.

EPNG force majeure at Casa Grande C Station restricts westbound Permian/Southwest flows toward the SoCal border -- watch for tightening at SoCal Citygate and potential basis widening versus Waha and EPNG receipts for the remainder of the gas day and into the March 18 gas day.
Reroute: Moderate: Transwestern Pipeline (TW) serves the SoCal border from the Permian and San Juan Basin and is the primary alternative to EPNG. However, TW spare capacity may be limited, and if TW is simultaneously constrained, California supply relief is effectively zero.
El Paso (EPNG)

[FORCE MAJEURE] FORCE MAJEURE-COMP STA 168

SEV 4/5
Force Majeure Until Further Notice 85 Days

NGPL has declared a force majeure at Compressor Station 168, effective April 6, 2026, with an end date of June 30, 2026. This is Revision 2 of the notice; the pipeline ID in the header references EPNG but the notice body confirms this is a Natural Gas Pipeline (NGPL) event. No specific capacity volume is stated, but a force majeure at a compressor station on one of the highest-throughput Midwest pipelines warrants significant attention through the end of June.

NGPL force majeure at Comp Sta 168 tightens Gulf Coast-to-Chicago/Midwest throughput with no stated capacity figure; expect bullish pressure on NGPL Midcontinent and Chicago citygate basis lasting through June 30, 2026.
Reroute: Moderate: ANR, PEPL, and REX Zone 3 serve overlapping Chicago and Midwest markets, but NGPL is very high capacity and a compressor station force majeure may exceed spare capacity on competing pipes, limiting full offset.
El Paso (EPNG)

[FORCE MAJEURE] Force Majeure - El Paso C Station

SEV 4/5
Force Majeure Until Further Notice 1 Days

EPNG has declared force majeure at El Paso C Station effective April 15, 2026 at 10:30 AM, with a stated end date of April 16, 2026 at 9:00 AM. No specific capacity volume is provided in the notice. The event duration is approximately 22.5 hours, affecting westbound flows toward the California border and eastbound Permian/Southwest flows depending on station role.

EPNG force majeure at El Paso C Station tightens Southwest pipeline supply with no stated capacity volume -- watch SoCal Border and Waha basis for widening moves; if Transwestern lacks spare capacity to absorb diverted volumes, SoCal Citygate could spike intraday.
Reroute: Moderate: Transwestern Pipeline (TW) is the primary competing pipeline for SoCal border deliveries and may absorb some EPNG volumes. However, if TW is already near capacity or co-constrained, reroute potential drops significantly and California supply tightness would intensify.
El Paso (EPNG)

[FORCE MAJEURE] FORCE MAJEURE-COMP STA 168 UPD1

SEV 4/5
Force Majeure Until Further Notice 67 Days

NGPL has declared a force majeure at Compressor Station 168, effective 04/24/2026 with an end date of 06/30/2026 -- a duration of approximately 67 days. No specific capacity volume is stated in the notice. The pipeline header identifies this as NGPL (Natural Gas Pipeline of America), not EPNG despite the pipeline label on the notice.

NGPL force majeure at CS 168 removes an unquantified portion of Gulf Coast-to-Midwest capacity through late June; expect bullish pressure at NGPL Midcontinent and Chicago citygate basis until capacity is restored or rerouted via ANR or PEPL.
Reroute: Moderate: ANR, PEPL, and REX Zone 3 serve overlapping Gulf Coast-to-Midwest corridors and can absorb some displaced volumes, but NGPL is one of the highest-throughput Midwest pipelines and a large constraint cannot be fully offset by any single alternative.
El Paso (EPNG)

[CAPACITY CONSTRAINT] EPNG OPEN FOR CONFIRMATIONS ID1

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[CAPACITY CONSTRAINT] EPNG OPEN FOR CONFIRMATIONS ID1

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[OPERATIONAL FLOW ORDER] OPERATIONAL FLOW ORDER - REPORT

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[CAPACITY CONSTRAINT] SEG 24 - CS 346 - AT CAPACITY

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[CAPACITY CONSTRAINT] SEGS 33/36 - AT OPERATING CAPACITY

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[CAPACITY CONSTRAINT] IBS/LPS/SRO - RESTRICTIONS

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[CAPACITY CONSTRAINT] EPNG OPEN FOR CONFIRMATIONS ID2

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[OPERATIONAL FLOW ORDER] OPERATIONAL FLOW ORDER - REPORT

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[CAPACITY CONSTRAINT] SEG 24 - CS 346 - AT CAPACITY

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[CAPACITY CONSTRAINT] SEGS 33/36 - AT OPERATING CAPACITY

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[CAPACITY CONSTRAINT] IBS/LPS/SRO - RESTRICTIONS

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[MAINTENANCE] OUTAGE IMPACT REPORT - 3-12-26

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[MAINTENANCE] OUTAGE IMPACT REPORT - 03-26-26

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[CAPACITY CONSTRAINT] TRANSPORTATION RESTRICTIONS - NSS/DSS

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[OPERATIONAL FLOW ORDER] OFO CD1 EXPANDED EFF 4-4 LIFTED 4-6

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[OPERATIONAL FLOW ORDER] OFO CD1 EXPANDED EFF 4-4 LIFTED 4-6

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[OPERATIONAL FLOW ORDER] OFO CD1 EXPANDED EFF 4-4 LIFTED 4-6

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[OPERATIONAL FLOW ORDER] OFO CD1 EXPANDED EFF 4-4 LIFTED 4-6

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[OPERATIONAL FLOW ORDER] OFO CD1 EXPANDED EFF 4-4 LIFTED 4-6

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[MAINTENANCE] PHMSA MEGA RULE-CS 184 TO CS 154

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[OPERATIONAL ALERT] SEG 22 - GC#2 LINE (CS300/301) PIPE INTE

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[MAINTENANCE] OUTAGE IMPACT REPORT - 4-23-26

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[MAINTENANCE] OUTAGE IMPACT REPORT - 4-23-26

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[MAINTENANCE] OUTAGE IMPACT REPORT - 4-24-26

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[CAPACITY CONSTRAINT] EPNG OPEN FOR CONFIRMATIONS ID2

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[CAPACITY CONSTRAINT] EPNG OPEN FOR CONFIRMATIONS Timely

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[OVER-UNDER PERFORMANCE] Location Performance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[MAINTENANCE] Updated March 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[MAINTENANCE] Updated March 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[CAPACITY CONSTRAINT] EPNG OPEN FOR CONFIRMATIONS Timely

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[OVER-UNDER PERFORMANCE] Location Performance Update

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[MAINTENANCE] Updated March 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[CAPACITY CONSTRAINT] EPNG OPEN FOR CONFIRMATIONS ID1

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[OVER-UNDER PERFORMANCE] Location Performance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[MAINTENANCE] SEG 11-AM#3 M/L(CS 105/106)ILI TOOL-UPD1

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[MAINTENANCE] SEG 8 - UNIT MAINTENANCE - CS 168

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[OPERATIONAL ALERT] SEG 27 - GC#2 LINE(GC305/306) PIPE INTEG

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[MAINTENANCE] PHMSA MEGA RULE - CS 156 TO CS 158

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[CAPACITY CONSTRAINT] EPNG OPEN FOR CONFIRMATIONS ID3

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[CAPACITY CONSTRAINT] EPNG OPEN FOR CONFIRMATIONS Evening

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[OVER-UNDER PERFORMANCE] Location Performance Update

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[OVER-UNDER PERFORMANCE] Location Performance Update

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[PIPELINE CONDITIONS] RESTRICTIONS FOR 03-10-2026 ID3

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[PIPELINE CONDITIONS] RESTRICTIONS FOR 03-11-2026 EC

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[PIPELINE CONDITIONS] RESTRICTIONS FOR 10-26-2026 ID2

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[PIPELINE CONDITIONS] RESTRICTIONS FOR 03-11-2026 TIMELY CYCLE

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[PIPELINE CONDITIONS] RESTRICTIONS FOR 03-10-2026 ID1

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[MAINTENANCE] Updated March 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[MAINTENANCE] SEG 11-AM#3 M/L(CS 105/106)ILI TOOL-UPD1

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[MAINTENANCE] SEG 8 - UNIT MAINTENANCE - CS 168

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[OPERATIONAL ALERT] SEG 27 - GC#2 LINE(GC305/306) PIPE INTEG

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[MAINTENANCE] PHMSA MEGA RULE - CS 156 TO CS 158

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[MAINTENANCE] Updated March 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[STORAGE] ANT STAGECOACH INJECTION RESTRICTION3-12

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[MAINTENANCE] Updated March 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[MAINTENANCE] Updated Prelim April 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[MAINTENANCE] Updated Prelim April 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[MAINTENANCE] TGP Outage Impact Report

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[MAINTENANCE] TGP Outage Impact Report

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[MAINTENANCE] TGP Outage Impact Report

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[MAINTENANCE] TGP Outage Impact Report

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[MAINTENANCE] TGP Outage Impact Report

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[MAINTENANCE] PHMSA MEGA-SEG 13 AM#3 107/108-ILI UPD1

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[MAINTENANCE] OUTAGE IMPACT REPORT- 04-09-26

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[MAINTENANCE] Updated April 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[MAINTENANCE] SEG 26 - GC #3 M/L-ILI TOOL RUNS - UPD 1

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[MAINTENANCE] SEGMENT 200-ILI TOOL RUN

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[PIPELINE CONDITIONS] CURRENT PIPELINE CONDITIONS

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[MAINTENANCE] STATION MAINTENANCE - CS 348 - COMPLETED

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[TSP CAPACITY OFFERING] AVAILABLE FIRM CAPACITY - OS #1429

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[TSP CAPACITY OFFERING] REQUEST FOR PROPOSAL

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[TSP CAPACITY OFFERING] FIRM CAPACITY - EXPANSION OS# 1428

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[TSP CAPACITY OFFERING] REQUEST FOR PROPOSAL

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[MAINTENANCE] STATION MAINTENANCE - CS 348 - COMPLETED

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[STORAGE] MONTHLY STORAGE TRANSFERS REMINDER

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[STORAGE] MONTHLY STORAGE TRANSFERS REMINDER

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[STORAGE] MONTHLY STORAGE TRANSFERS REMINDER

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[STORAGE] MONTHLY STORAGE TRANSFERS REMINDER

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[STORAGE] MONTHLY STORAGE TRANSFERS REMINDER

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[STORAGE] MONTHLY STORAGE TRANSFERS REMINDER

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
El Paso (EPNG)

[MAINTENANCE] SEG 26-GC#3 ML-ILI TOOL RUNS-COMPLETED

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.