[FORCE MAJEURE] FORCE MAJEURE-REMEDIATION-CS34 -UP3
SEV 4/5
Force MajeureUntil Further Notice1 Days
NGPL has declared a force majeure at Compressor Station 34 (Unit 3) effective June 11, 2026 at 3:21 PM, with restoration targeted for June 12, 2026 at 9:00 AM -- approximately 18 hours of impact. No specific capacity volume is stated in the notice. CS34 is located on NGPL's Gulf Coast-to-Midwest mainline corridor, and the unit outage constrains northbound throughput.
NGPL force majeure at CS34 Unit 3 constrains Gulf Coast-to-Chicago northbound capacity; expect bearish Henry Hub pressure as gas backs up at Gulf Coast origin points and bullish Chicago Citygate and NGPL Midcontinent basis versus Henry Hub for the duration.
Reroute: Moderate: ANR, PEPL, and REX Zone 3 serve overlapping Chicago and Midwest markets and may absorb displaced volumes, though NGPL is very high capacity and a compressor outage of unknown magnitude may not be fully offset by alternatives.
View original notice text
Pipeline: Natural Gas Pipeline (NGPL)
Notice Type: FORCE MAJEURE
Subject: FORCE MAJEURE-REMEDIATION-CS34 -UP3
Posted: 06/11/2026 3:21:05PM
Effective: 06/11/2026 3:21:05PM
End Date: 06/12/2026 9:00:00AM
Natural Gas Pipeline (NGPL)
[FORCE MAJEURE] FORCE MAJEURE-REMEDIATION-CS341-UP4
SEV 4/5
Force MajeureUntil Further Notice14 Days
NGPL has declared a force majeure event affecting Compressor Station 341 (CS341) on the UP4 segment, effective immediately on 06/16/2026 with a stated end date of 06/30/2026. No specific capacity volume is provided in the notice. CS341 is a key compression point on NGPL's Gulf Coast-to-Midwest corridor, and this FM declaration indicates an unplanned equipment failure or emergency condition requiring remediation over approximately 14 days.
NGPL CS341 force majeure on UP4 segment tightens northbound Gulf Coast takeaway capacity, expect bearish pressure at Henry Hub as gas backs up onshore with bullish pressure at Chicago Citygate and NGPL Midcontinent basis; no volume stated but CS341 outages on NGPL can materially affect one of the highest-throughput Midwest corridors.
Reroute: Moderate: ANR, PEPL, and REX Zone 3 serve overlapping Gulf Coast-to-Chicago/Midwest corridors and may absorb some displaced volumes, but NGPL is very high capacity and a full reroute of all affected volumes is unlikely given typical spare capacity constraints on competing pipes.
View original notice text
Pipeline: Natural Gas Pipeline (NGPL)
Notice Type: FORCE MAJEURE
Subject: FORCE MAJEURE-REMEDIATION-CS341-UP4
Posted: 06/16/2026 3:58:26PM
Effective: 06/16/2026 3:58:26PM
End Date: 06/30/2026 9:00:00AM
Natural Gas Pipeline (NGPL)
[FORCE MAJEURE] FORCE MAJEURE - REMEDIATION - CS341-UPD5
SEV 4/5
Force MajeureUntil Further Notice1 Days
NGPL has declared a force majeure at Compressor Station 341 (CS341), effective June 22, 2026 at 11:24 AM, with restoration expected by June 23, 2026 at 9:00 AM. The notice is a first revision (fresh event) with no capacity volume stated. Duration is approximately one calendar day. CS341 is on the NGPL mainline, a high-throughput Gulf Coast-to-Midwest corridor pipeline.
NGPL force majeure at CS341 restricts northbound Gulf Coast-to-Midwest throughput; expect bearish Henry Hub pressure as Gulf Coast supply backs up and bullish pressure at Chicago Citygate and NGPL Midcontinent basis -- no capacity volume stated so magnitude is uncertain but force majeure classification warrants close monitoring.
Reroute: Moderate: ANR, PEPL, and REX Zone 3 serve overlapping Gulf Coast-to-Midwest corridors and may absorb some displaced volumes, but NGPL is one of the highest-capacity Midwest pipelines and partial offsets are likely insufficient for large displacements.
View original notice text
Pipeline: Natural Gas Pipeline (NGPL)
Notice Type: FORCE MAJEURE
Subject: FORCE MAJEURE - REMEDIATION - CS341-UPD5
Posted: 06/22/2026 11:24:28AM
Effective: 06/22/2026 11:24:28AM
End Date: 06/23/2026 9:00:00AM
Natural Gas Pipeline (NGPL)
[FORCE MAJEURE] FORCE MAJEURE-M&M LAT MLV2 TO MLV3-PT
SEV 4/5
Force Majeure32 Days
NGPL has declared a force majeure on the M&M Lateral segment between MLV2 and MLV3, effective 07/30/2026 with an end date of 08/31/2026 -- a roughly 32-day event. This is Revision 5 of the notice, but the force majeure designation remains active, triggering the escalation rule and requiring fresh high-severity treatment. No specific capacity volume is stated in the notice text.
Active force majeure on NGPL M&M Lateral (MLV2 to MLV3) through 08/31/2026 reduces Gulf Coast-to-Midwest takeaway on one of the highest-throughput Midwest pipelines; expect bearish pressure at Henry Hub and Gulf Coast origin points with bullish widening at Chicago Citygate and NGPL Midcontinent basis.
Reroute: Moderate: ANR, PEPL, and REX Zone 3 serve overlapping Gulf Coast-to-Midwest corridors and may absorb some displaced volumes, but NGPL is very high capacity and a large constraint on this lateral is difficult to fully offset on alternative pipes.
View original notice text
Pipeline: Natural Gas Pipeline (NGPL)
Notice Type: FORCE MAJEURE
Subject: FORCE MAJEURE-M&M LAT MLV2 TO MLV3-PT
Posted: 07/30/2026 10:45:55AM
Effective: 07/30/2026 10:45:55AM
End Date: 08/31/2026 9:00:00AM
TSP/TSP Name: 6931794-NATURAL GAS PIPELINE CO. Critical: Y
Notice Type Desc (1): MAINTENANCE Notice Type Desc (2): MAINTENANCE
Notice Eff Date/Time: 07/23/2026 1:29:42PM Notice End Date/Time: 07/24/2026 9:00:00am
Post Date/Time: 7/23/2026 1:29:42 PM Notice ID: 47112
Reqrd Rsp: 1 Rsp Date/Time: 7/23/2026 12:00:00 AM
Notice Stat Desc: INITIATE Prior Notice:
Subject: OUTAGE IMPACT REPORT 7-23-26
Notice Text:
OUTAGE IMPACT REPORT UPDATE
Natural has posted an updated Outage Impact Report on its website.
The report outlines scheduled projects that may affect customers and includes:
· Impacted pipeline segments
· Estimated start and finish dates
· Brief project descriptions
· Anticipated shipper impacts
Changes to existing projects and newly added projects are highlighted in yellow for easy reference. In addition, Natural will continue to post detailed updates on specific maintenance projects with direct shipper impacts on its interactive website as needed. The full maintenance plan is accessible via Natural's portal page or by clicking the link below:
Outage Impact Report -7-23-26
If you have any questions, please contact your Account Director or Scheduling Representative.
NGPL has posted a maintenance outage impact report effective June 23, 2026 at 9:43 AM through June 24, 2026 at 9:00 AM -- a roughly 23-hour window. No specific location, segment, compressor station, or capacity restriction figure is provided in the notice text. The event appears to be a short-duration planned maintenance with advance notice and a known end date.
Short-duration planned NGPL maintenance with no stated capacity volume and no segment detail -- insufficient information to assess basis impact at NGPL Midcontinent or Chicago Citygate; monitor for follow-on revision with capacity figures.
Reroute: Moderate: if capacity is affected, ANR, PEPL, and REX Zone 3 serve overlapping Gulf Coast-to-Midwest corridors, though NGPL is very high capacity and large constraints are difficult to fully offset; no specific volume or segment is disclosed in this notice.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Natural Gas Pipeline (NGPL)
Notice Type: OPERATIONAL ALERT
Subject: SEG 18 - THOMPSONVILLE LAT - PIPE INTEG
Posted: 07/30/2026 10:43:17AM
Effective: 07/30/2026 10:43:17AM
End Date: 08/31/2026 9:00:00AM
TSP/TSP Name: 6931794-NATURAL GAS PIPELINE CO. Critical: Y
Notice Type Desc (1): MAINTENANCE Notice Type Desc (2): MAINTENANCE
Notice Eff Date/Time: 07/23/2026 1:02:16PM Notice End Date/Time: 07/24/2026 9:00:00am
Post Date/Time: 7/23/2026 1:02:16 PM Notice ID: 47110
Reqrd Rsp: 1 Rsp Date/Time: 7/23/2026 12:00:00 AM
Notice Stat Desc: SUPERSEDE Prior Notice: 47016
Subject: SEG 26 - ILI TOOL RUNS - UPDATE 1
Notice Text:
SEGMENT 26 – GULF COAST #3 M/L - ILI TOOL RUNS – UPDATE 1
The tool run dates have been revised, as noted below. See previous Notice ID 47016 dated June 11, 2026.
As previously posted on Natural's Outage Impact Report (X25-1432007) and as part of Natural's ongoing pipeline Integrity Management Program, Natural will perform a series of ILI tool runs on the Gulf Coast #3 Mainline between Compressor Station 303 (CS 303) located in Angelina County, Texas, and Compressor Station 302 (CS 302) located in Montgomery County, Texas, in Segment 26 of Natural's Texok Zone.
As such, effective on the gas days indicated below, Natural will schedule Primary Firm and Secondary in-path Firm transports to no less than 59% of contract MDQ southbound through CS 303. AOR/ITS and Secondary out-of-path Firm transports will not be available for the duration of this restriction. For scheduling purposes, the Texok GC Pool (LOC 10560) is located north of the constraint. Firm transportation associated with storage injections and withdrawals may be impacted. Once the data from the tool runs have been analyzed, any remediation work impacting shippers will be posted.
TOOL RUN DATES:
Gas day Wednesday, August 5, 2026 (Previously Gas day Tuesday, August 4, 2026)
Gas day Friday, August 7, 2026 (Previously Gas day Thursday, August 6, 2026)
Gas day Tuesday, August 11, 2026
Gas day Thursday, August 13, 2026
Please contact your Account Director or Scheduling Representative if you have any questions.
Natural Gas Pipeline (NGPL)
[MAINTENANCE] SEG 26-GC#3 ML-ILI TOOL RUNS-POSTPONE
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Natural Gas Pipeline (NGPL)
Notice Type: MAINTENANCE
Subject: SEG 26-GC#3 ML-ILI TOOL RUNS-POSTPONE
Posted: 07/30/2026 10:35:01AM
Effective: 07/30/2026 10:35:01AM
End Date: 09/30/2026 9:00:00AM
TSP/TSP Name: 6931794-NATURAL GAS PIPELINE CO. Critical: Y
Notice Type Desc (1): PIPELINE CONDITIONS Notice Type Desc (2): CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time: 07/21/2026 3:26:41PM Notice End Date/Time: 07/22/2026 9:00:00am
Post Date/Time: 7/21/2026 3:26:41 PM Notice ID: 47106
Reqrd Rsp: 1 Rsp Date/Time: 7/21/2026 12:00:00 AM
Notice Stat Desc: INITIATE Prior Notice:
Subject: CURRENT PIPELINE CONDITIONS
Notice Text:
CURRENT PIPELINE CONDITIONS
The following information summarizes operating conditions and scheduling restrictions on Natural's system effective for gas day Wednesday, July 22, 2026. This summary of information is updated once a day and may not provide up-to-the-minute statistics. Accordingly, when making or confirming transactions, please refer to individual notices for the latest scheduling restrictions and services availability on Natural's system. If you have any questions, please call your Account Director or Scheduling Representative.
TRANSPORTATION
AMARILLO AFFECTED AREAS:
Segments 33 & 36 Affected Area – Operating Capacity Available
AMARILLO SEGMENT CONSTRAINTS: (Transports associated with Storage may be impacted in areas with constraints; see below for any specific impacts)
Segment 7 Northbound and Southbound (STA 167 Indian Basin Lateral) – FMJ @ 0% MDQ (Posted 3/7/22)
Segment 9 Northbound (STA 167 Lockridge Lateral) – Primary Only (Posted 7/26/24)
Segment 9 Southbound (STA 167 Lockridge Lateral) – Primary Only (Posted 7/9/24)
SPECIFIC STORAGE IMPACTS BY SEGMENTS:
SEGMENTS
IMPACT
Segment 7 Northbound and Southbound
Amarillo Withdrawals/Injections
Segment 9 Northbound and Southbound
Amarillo Withdrawals/Injections
A/G LINE SEGMENT CONSTRAINTS: (Transports associated with Storage may be impacted in areas with constraints; see below for any specific impacts)
None
SPECIFIC STORAGE IMPACTS BY SEGMENTS:
SEGMENTS
IMPACT
GULF COAST SEGMENT CONSTRAINTS: (Transports associated with Storage may be impacted in areas with constraints; see below for any specific impacts)
Segment 22 Northbound (South of STA 302 Montgomery) – At Operating Capacity
Segment 23 Eastbound (STA 348 Cameron) – At Operating Capacity
Segment 24 Eastbound (STA 346 Cameron) – At Operating Capacity
SPECIFIC STORAGE IMPACTS BY SEGMENTS:
SEGMENTS
IMPACT
Segment 22 Northbound
Gulf Coast Withdrawals/Injections
Segment 23 Eastbound
Gulf Coast Withdrawals/Injections
Segment 24 Eastbound
Gulf Coast Withdrawals/Injections
LOCATIONS - AT CAPACITY / PRIMARY ONLY:
LOC 3592 Sabine Henry Hub Vermilion (Seg 24) – At Operating Capacity
LOCATIONS - OFF RATE:
None
LOCATIONS – GAS QUALITY ISSUES:
LOC 3251 EPNG Moore (Seg 10) – Available for Scheduling, but could be Limited if Necessary (Posted 3/7/25)
LOC 900400 McBrayer East Linden (Seg 26) – Unavailable (Posted 4/5/23)
LOCATIONS - MAINTENANCE / FORCE MAJEURE:
LOC 3000 OneokGT Woodward (Seg 4) – FMJ – Unavailable (Posted 4/20/25)
LOC 47662 Atmos Pyote (Seg 9) – FMJ – Unavailable (Posted 5/6/24)
LOC 3352 ETP Beckville Panola (Seg 26) – PLM – Primary Only for Receipts (Posted 7/16/26)
LOC 42741 ET G&P ETML Nacogdoches (Seg 26) – PLM – Unavailable for Receipts (Posted 7/16/26)
LOC 45310 BTA ETG East Texas Gathering (Seg 26) – PLM – Unavailable for Receipts (Posted 7/16/26)
LOC 45397 ET G&P Nacogdoches (Seg 26) – PLM – Unavailable for Receipts (Posted 7/16/26)
LOC 46389 TGG Nacogdoches (Seg 26) – PLM – Unavailable for Receipts (Posted 7/16/26)
LOC 55704 Markwest Harrison (Seg 26) – PLM – Unavailable for Receipts (Posted 7/16/26)
LOCATIONS – OTHER:
LOC 3825 TET/Sweet Lake Cameron (Seg 23) – Unavailable for Deliveries
LOC 6100 ANR Woodstock (Seg 37) - Unavailable for Deliveries
LOC 44094 Bridgeline Johnsons Bayou (Seg 23) – Unavailable for Deliveries
LOC 48365 OneokGT Sayre Beckham (Seg 6) – Unavailable for Deliveries; Available for Receipts
LOC 908197 Enstor Katy (Seg 22) – Unavailable for Deliveries
NSS/DSS TRANSPORT IN-THE-PATH REQUIREMENTS (AMARILLO/GULF COAST SYSTEMS) – Posted 5/04/26:
Amarillo NSS/DSS Injections (In-The-Path transport is required)
Amarillo NSS Withdrawals (In-The-Path transport is not required for deliveries to the Mkt Del Zone)
Additional In-The-Path Injections (In-The-Path transport is not required for Production Zone)
Gulf Coast NSS/DSS Injections (In-The-Path transport is required)
Gulf Coast NSS Withdrawals (In-The-Path transport is not required for deliveries to the Mkt Del Zone)
Gulf Coast NSS Withdrawals (In-The-Path transport is not required for deliveries to the South Texas Production Zone)
STORAGE – Posted 11/7/25:
INJECTIONS
Gulf Coast Zones – DSS/NSS – Up to IQ
Amarillo Zones – DSS/NSS – Up to IQ (Including gas sourced from Gulf Coast)
WITHDRAWALS
Gulf Coast Zones – DSS/NSS – Up to WQ
Amarillo Zones – DSS/NSS – Up to WQ
DSS/NSS – ADDITIONAL FIRM RIGHTS (in excess of standard tariff provisions):
(Percentages below are applied to MDQ)
DSS
Injection:
0% additional system-wide, total IQ = 30% MDQ Formula
Withdrawal:
0% additional system-wide, total WQ = 10% MDQ
NSS
Injection:
0% additional system-wide, total IQ = 33% (inv >= 67% of MSV)
0% additional system-wide, total IQ = 50% (inv < 67% of MSV)
Withdrawal:
0% additional system-wide, total WQ = 70% (inv <= 50% of MSV)
0% additional system-wide, total WQ = 100% (inv > 50% of MSV)
Note: Other than the above, all other tariff provisions related to storage services are still in effect. Without limitation of the foregoing, all DSS volumes (whether flowing under firm or interruptible daily rights) will count toward the limitation of 10xWQ over any 15-day period. The Shipper must obtain a specific waiver from Natural to avoid a UAOR penalty if that limit is exceeded. Other tariff storage provisions remain in effect as defined by the tariff for the specific service type, including but not limited to: Daily Injection/ Withdrawal Limits; Sourcing Limitations; and Cycling Requirements.
STORAGE INJECTION - SOURCING TARIFF WAIVER – DSS/NSS - (Available/Unavailable)
Amarillo Storage Injections – Sourced from Gulf Coast System – Available
Note: The level of Amarillo or Gulf Coast NSS and DSS injections available (i.e., up to IQ, up to MDQ or open above MDQ) will be the same as the level of injections available on the Amarillo or Gulf Coast System and are also subject to any Transportation Restrictions for NSS Storage Services “In-Path Restrictions” as posted under Critical Notices. Injection sourcing from LOC 44413 REX MOULTRIE, subject to any posted constraints can be directed to either Amarillo Storage or Gulf Coast Storage points. In addition, LOC 906104 ANR JOLIET, NORTHERN BORDER (McGowan) (LOC 50706), MIDWESTERN (LOC906107) and LOC 37207ALLIANCE JOLIET are available for injection to either Amarillo Storage or Gulf Coast Storage points. The level of Amarillo or Gulf Coast NSS and DSS injections available (i.e., up to IQ, up to MDQ or open above MDQ) will be the same as the level of injections available on the Amarillo or Gulf Coast System as posted under Critical Notices.
LINE PACK (IBS/LPS/SRO) – Posted 2/9/26:
(For SRPL - please see below for specific MAQ/MDQ Availability)
AMARILLO
ON to the Pipe
Market Zones
Amarillo Mainline – Up to MDQ
Iowa-Illinois – Up to MDQ
Production Zones
Midcontinent – Up to MDQ
Permian – Up to MDQ
OFF of the Pipe
Market Zones
Amarillo Mainline – Up to MDQ
Iowa-Illinois – Up to MDQ
Production Zones
Midcontinent – Up to MDQ
Permian – Up to MDQ
GULF COAST
ON to the Pipe
Market Zones
Gulf Coast Mainline – Up to MDQ
Iowa-Illinois – Up to MDQ
Production Zones
Texok GC – Up to MDQ
Texok A/G – Up to MDQ
South Texas – Up to MDQ
Louisiana – Up to MDQ
OFF of the Pipe
Market Zones
Gulf Coast Mainline – Up to MDQ
Iowa-Illinois – Up to MDQ
Production Zones
Texok GC – Up to MDQ
Texok A/G – Up to MDQ
South Texas – Up to MDQ
Louisiana – Up to MDQ
SRPL MAQ/MDQ AVAILABILITY - (Posted 2/4/2026):
ON to the Pipe
Midcontinent Pool – No MAQ/MDQ Change (Back to Normal Capacity; See Notice Posted 2/4/26)
OFF of the Pipe
Midcontinent Pool – No MAQ/MDQ Change (Back to Normal Capacity; See Notice Posted 2/4/26)
ON to the Pipe
Texok GC Pool – No MAQ/MDQ Change (Back to Normal Capacity; See Notice Posted 2/4/26)
OFF of the Pipe
Texok GC Pool – No MAQ/MDQ Change (Back to Normal Capacity; See Notice Posted 2/4/26)
STORAGE LOCATIONS
STORAGE LOC
SEGMENT
25082 – PERMIAN
14
25083 – MIDCONTINENT
14
10551 – AMARILLO MAINLINE
14
25656 – IOWA-IL AMARILLO
14
25658 – TEXOK
34
25084 – SOUTH TEXAS
34
25085 – LOUISIANA
34
25657 – GULF COAST MAINLINE
34
10550 – IOWA-IL GULF COAST
34
POOL LOCATIONS
Amarillo System:
POOL LOC
SEGMENT
25077 – PERMIAN
9
25078 – MIDCONTINENT
6
10566 – AMARILLO MAINLINE
12
10561 – IOWA-IL AMARILLO
14
Gulf Coast System:
POOL LOC
SEGMENT
11328 – TEXOK A/G
15
10560 – TEXOK GC
26
25079 – SOUTH TEXAS
22
25080 – LOUISIANA
24
10558 – GULF COAST MAINLINE
27
10562 – IOWA-IL GULF COAST
28