Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

MIDAMER/NGPL CDP

Natural Gas Pipeline (NGPL) · Loc 10568 · WASHINGTON, Iowa
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.217
Bcf/d scheduled
Δ Day-over-day
-0.126
vs Nov 25
7-day average
0.199
Bcf/d
30-day average
0.162
30 of 30 days posted
30-day high
0.343
Nov 25
30-day low
0.119
Oct 31
Operating capacity
0.439
Bcf/d as posted, evening cycle
Utilization
50%
headroom 50%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.000.100.200.300.40Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.217-0.126
Nov 250.343+0.086
Nov 240.257+0.099
Nov 230.158+0.017
Nov 220.142+0.005
Nov 210.137-0.001
Nov 200.138-0.024
Nov 190.163-0.007
Nov 180.170-0.019
Nov 170.189+0.017
Nov 160.171+0.004
Nov 150.168-0.001
Nov 140.169-0.004
Nov 130.173+0.036
Nov 120.137+0.007
Nov 110.131-0.013
Nov 100.143-0.005
Nov 90.148+0.006
Nov 80.143-0.000
Nov 70.143-0.041
Nov 60.184+0.034
Nov 50.150-0.016
Nov 40.167+0.035
Nov 30.132-0.003
Nov 20.135+0.005
Nov 10.130+0.011
Oct 310.119-0.008
Oct 300.126-0.015
Oct 290.141+0.003
Oct 280.139—
84 more days on file for this meter, back to August 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)MIDAMER/NGPL CDP

Natural Gas Pipeline (NGPL)Placed at the center of Washington, IA — approximate; the exact meter site is not published.

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, MIDAMER/NGPL CDP (Natural Gas Pipeline (NGPL) loc 10568) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/ngpl/10568/