Natural Gas Pipeline Glossary

Force majeure, Bcf/d, basis, OFO, nomination cycles: the terms in pipeline notices and on this site, in plain English.

The words pipelines use in their notices, and the words Enercast uses on this site, in plain English. Each term has its own link (for example #force-majeure) you can share.

ABCDEFGHIJKLMNOPQRSTUVWXYZ

B

Basis (basis differential)
The price difference between natural gas at a regional trading point (for example Transco Zone 6 New York or Waha) and Henry Hub. Pipeline outages move basis first: a constraint that traps supply upstream weakens basis there and strengthens it downstream.
Bcf/d (billion cubic feet per day)
The unit Enercast uses for capacity and flows. U.S. dry gas production is roughly 100+ Bcf/d; a single compressor outage is often 0.05–0.5 Bcf/d. Pipelines usually post in Dth/d or MMBtu/d; Enercast converts at 1,000,000 Dth/d ≈ 1 Bcf/d.

C

Ceiling (posted capacity cap)
A notice that says how much a point or segment can move (“capacity through Station 50 is limited to 2.27 Bcf/d”) rather than how much was cut. Enercast shows ceilings but never adds them into a capacity-offline total, because a ceiling is not a loss.
Citygate (LDC citygate)
The meter where an interstate pipeline hands gas to a local distribution company (LDC) for delivery to homes and businesses. One of Enercast’s eight supply & demand categories.
Compressor station (CS, Sta.)
A facility every 50–100 miles along a pipeline that re-pressurizes gas to keep it moving. A unit or station outage reduces how much gas the segment downstream can carry — the most common cause of capacity going offline.
Critical notice
A bulletin a pipeline must post on its website when an event affects service — a force majeure, an outage, a capacity restriction, an OFO. Interstate pipelines post them under FERC and NAESB standards. Enercast reads every one and scores it 1–5. How notices are scored.
Curtailment
When a pipeline cannot move every scheduled nomination and cuts some of them, lowest priority first: interruptible service, then secondary firm, then primary firm. A notice that warns of primary-firm curtailment is a strong signal.

D

Dekatherm (Dth, MMBtu)
The energy unit pipelines schedule in. 1 Dth = 1 MMBtu = 10 therms, about 1,000 cubic feet of gas. 1,000,000 Dth/d is roughly 1 Bcf/d.
Derived reduction
A capacity cut Enercast calculates from what the pipeline posted: the posted new ceiling subtracted from the posted prior or design capacity (for example 800,000 Dth/d design reduced to 700,000 Dth/d = 0.100 Bcf/d). Labeled “derived” wherever it appears.
Design capacity
The maximum a point or segment is built to move. Compare operating capacity, what it can move today.

E

Electronic bulletin board (EBB, informational postings)
Each interstate pipeline’s public website where it posts notices, operationally available capacity, scheduled quantities and its tariff. Enercast monitors 192 of them around the clock.
Event (outage event)
Enercast’s unit for capacity offline: one outage from declaration to lift, however many notices the pipeline posts along the way. The calendar draws one bar per event, not per notice.

F

Firm service (primary firm, secondary firm)
Transportation a shipper has reserved and pays for whether used or not. Primary firm (between its contracted receipt and delivery points) is the last service cut; secondary firm (using other points) is cut before it.
Force majeure (FM, FMJ)
A declaration that an unforeseeable event — a leak, a mechanical failure, a storm — prevents the pipeline from providing service. Force majeure events are usually unplanned and often scored severity 4–5.

G

Gas day
The 24-hour day gas is scheduled and measured on: 9:00 AM to 9:00 AM Central Clock Time. A notice “effective Gas Day October 20” starts at 9:00 AM CT on October 20. The gas day and nomination cycles.

H

Henry Hub
The Louisiana pipeline interconnect that is the delivery point for NYMEX natural gas futures and the U.S. benchmark price. “Bullish” and “bearish” on Enercast are read against Henry Hub.

I

Interconnect
A meter where two pipelines exchange gas. Interconnect restrictions matter because they decide whether gas can reroute around an outage.
Interruptible service (IT)
Transportation offered only when capacity is available, and the first to be cut in a constraint.
Interstate pipeline
A pipeline that crosses state lines and is regulated by FERC, which requires public posting of notices and scheduled quantities. Enercast covers interstate pipelines; most Texas intrastate systems do not post.

L

LDC (local distribution company)
The utility that delivers gas to homes and businesses from the citygate.
Lift (return to service, restoration)
The notice that ends an outage: the pipeline says the restriction is over. Enercast closes the event on the day the lift posts and counts the capacity as back.
LNG feedgas
Gas delivered by pipeline to LNG export terminals (Sabine Pass, Cameron, Freeport, Corpus Christi, Cove Point and others) to be liquefied and shipped. A cut to feedgas keeps gas in the U.S. market and reads bearish for Henry Hub.
Location ID (loc, meter ID, POI)
The number a pipeline gives each meter or point (for example Cameron LNG, loc 4246). Notices and scheduled quantities are posted by location ID, which is how Enercast ties a notice to flows.

M

Mainline valve (MLV)
A valve on the main pipe. Maintenance is often posted as a stretch between two valves (“MLV 109-3A to MLV 110-3”).
Market side (bullish, bearish, basis-only)
Enercast’s read of which way an outage pushes price. Bullish: supply is stranded (a production lateral, a processing plant, an import point). Bearish: demand is cut (LNG feedgas, a citygate, a power plant). Basis-only: the effect is regional rather than national.

N

Nomination
A shipper’s request to move a quantity of gas from a receipt point to a delivery point on a gas day. Nominations are submitted and confirmed in fixed nomination cycles.
Nomination cycle (Timely, Evening, ID1, ID2, ID3)
The five daily scheduling windows set by NAESB: Timely and Evening (the day before) and three intraday cycles. Each cycle produces a new set of scheduled quantities. Cycle times.

O

Observed estimate (~est.)
When a notice gives no volume, Enercast looks at the drop in the location’s posted operating capacity after the notice and shows it as “~0.170 est.” Estimates are labeled and never added into the Bcf/d total.
Operating capacity (operationally available capacity)
What a point or segment can move today, as posted by the pipeline. When it falls below design capacity, something is restricting it.
Operational flow order (OFO)
An order requiring shippers to keep receipts and deliveries in balance, with penalties for imbalances. Issued when a pipeline’s pressure or linepack is at risk — often in cold weather.
Outage Impact Report
A weekly schedule some pipelines (Tennessee Gas Pipeline, Southern Natural Gas and others) post listing planned work and the expected capacity at each station or segment for the coming weeks.

P

Pig run (pigging)
Sending an inspection or cleaning tool (a “pig”) through the pipe. Capacity in that stretch is usually reduced for the day.
Power burn (power generation)
Gas delivered to power plants. One of Enercast’s eight supply & demand categories, and the most weather-driven.

R

Receipt point
Where gas enters a pipeline — from a processing plant, another pipeline or storage. Its opposite is a delivery point, where gas leaves.
Reroute potential
Enercast’s read of whether other pipelines can carry the gas an outage displaces: High, Moderate, Limited or None. Limited reroute makes the same Bcf/d cut matter more.
Revision
A pipeline update to an existing notice — new dates, a new volume, an extension. Enercast keeps every revision, shows the latest, and only re-alerts when something material changes.

S

Scheduled quantity
The volume a pipeline confirmed for a meter on a nomination cycle — the nomination that cleared scheduling. Every Enercast supply & demand figure is a sum of posted scheduled quantities, not a model. Why.
Segment
A stretch of pipeline between two stations or valves, often numbered by the pipeline (“Segment 380”). Capacity is posted and restricted by segment.
Severity score (1–5)
Enercast’s AI rating of a notice’s market impact, from 1 (routine bulletin) to 5 (major event, for example a large unplanned outage on a bottleneck). Free alerts cover severity 4–5. The full scale.
Stale event
An outage with no posted end date that the pipeline has stopped re-listing. It may have ended without a lift notice; Enercast shows it dashed and leaves it out of the total.
Stated reduction
A capacity cut the pipeline posted itself (“eastbound capacity reduced by 504 MMcf/d”). The most reliable figure; labeled “stated”.
Storage injection / withdrawal
Gas going into (injection) or out of (withdrawal) underground storage. Net storage flow is one of Enercast’s eight supply & demand categories.

T

Trading note
The one- or two-sentence market read Enercast attaches to each scored notice: which trading points are affected, in which direction, how many Bcf/d and for how long. Full trading notes come with Pro alerts.

Z

Zone (rate zone)
Large pipelines are divided into zones for pricing and capacity (Transco Zones 1–6, Tennessee Gas Zones 0–6, Texas Eastern M-1 to M-3). Regional prices are quoted by zone, for example Transco Zone 6 NY.

Missing a term? Email support@enercast.com. See also How to read a pipeline notice.