Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

NEB CITY/NGPL CDP

Natural Gas Pipeline (NGPL) · Loc 9252 · OTOE, Nebraska
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 27
0.002
Bcf/d scheduled
Δ Day-over-day
-0.012
vs Nov 26
7-day average
0.005
Bcf/d
30-day average
0.003
30 of 30 days posted
30-day high
0.014
Nov 26
30-day low
0.001
Oct 31
Operating capacity
0.017
Bcf/d as posted, evening cycle
Utilization
11%
headroom 89%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0050.0100.015Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.002-0.012
Nov 260.014+0.001
Nov 250.013+0.011
Nov 240.002+0.000
Nov 230.002+0.000
Nov 220.002+0.000
Nov 210.002+0.000
Nov 200.001-0.003
Nov 190.004+0.002
Nov 180.002-0.000
Nov 170.002+0.000
Nov 160.002-0.000
Nov 150.002+0.000
Nov 140.002+0.000
Nov 130.002+0.000
Nov 120.002-0.000
Nov 110.002-0.001
Nov 100.003+0.001
Nov 90.002+0.000
Nov 80.002-0.000
Nov 70.002-0.000
Nov 60.002+0.000
Nov 50.002+0.000
Nov 40.002+0.000
Nov 30.002+0.000
Nov 20.002+0.000
Nov 10.002+0.000
Oct 310.001-0.000
Oct 300.001+0.000
Oct 290.001—
86 more days on file for this meter, back to August 4, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)NEB CITY/NGPL CDP

Natural Gas Pipeline (NGPL)Placed at the center of Otoe, NE — approximate; the exact meter site is not published.

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, NEB CITY/NGPL CDP (Natural Gas Pipeline (NGPL) loc 9252) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/ngpl/9252/