Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

LIBERTY/NGPL CDP MISSOURI

Natural Gas Pipeline (NGPL) · Loc 909209 · BOLLINGER, Missouri
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 27
0.005
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.005
Bcf/d
30-day average
0.004
30 of 30 days posted
30-day high
0.007
Nov 25
30-day low
0.002
Oct 29
Operating capacity
0.010
Bcf/d as posted, evening cycle
Utilization
49%
headroom 51%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0020.0040.0060.008Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.005+0.000
Nov 260.005-0.002
Nov 250.007+0.000
Nov 240.007+0.002
Nov 230.005+0.001
Nov 220.004+0.001
Nov 210.003-0.002
Nov 200.005-0.000
Nov 190.005+0.000
Nov 180.005-0.000
Nov 170.005+0.000
Nov 160.005+0.000
Nov 150.005+0.000
Nov 140.005-0.001
Nov 130.006+0.001
Nov 120.005+0.000
Nov 110.005+0.000
Nov 100.005+0.001
Nov 90.004-0.000
Nov 80.004-0.000
Nov 70.004-0.001
Nov 60.005+0.001
Nov 50.004+0.000
Nov 40.004+0.000
Nov 30.004+0.002
Nov 20.002+0.000
Nov 10.002-0.001
Oct 310.003+0.000
Oct 300.003+0.002
Oct 290.002—
85 more days on file for this meter, back to August 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)LIBERTY/NGPL CDP MISSOURI

Natural Gas Pipeline (NGPL)Placed at the center of Bollinger, MO — approximate; the exact meter site is not published.

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, LIBERTY/NGPL CDP MISSOURI (Natural Gas Pipeline (NGPL) loc 909209) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/ngpl/909209/