Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

CORNING/NGPL ADA

Natural Gas Pipeline (NGPL) · Loc 900107 · ADAMS, Iowa
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 27
0.006
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.007
Bcf/d
30-day average
0.006
30 of 30 days posted
30-day high
0.007
Nov 25
30-day low
0.001
Nov 17
Operating capacity
0.016
Bcf/d as posted, evening cycle
Utilization
39%
headroom 61%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0020.0040.0060.008Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.006+0.000
Nov 260.006-0.001
Nov 250.007+0.000
Nov 240.007+0.001
Nov 230.006+0.000
Nov 220.006+0.000
Nov 210.006+0.000
Nov 200.006+0.000
Nov 190.006+0.003
Nov 180.002+0.002
Nov 170.001-0.004
Nov 160.004-0.002
Nov 150.006+0.000
Nov 140.006+0.000
Nov 130.006+0.000
Nov 120.006+0.000
Nov 110.006-0.000
Nov 100.006+0.000
Nov 90.006+0.000
Nov 80.006+0.000
Nov 70.006-0.001
Nov 60.006+0.000
Nov 50.006+0.000
Nov 40.006+0.000
Nov 30.006+0.000
Nov 20.006+0.000
Nov 10.006+0.000
Oct 310.006+0.000
Oct 300.006+0.000
Oct 290.006—
85 more days on file for this meter, back to August 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)CORNING/NGPL ADA

Natural Gas Pipeline (NGPL)Placed at the center of Adams, IA — approximate; the exact meter site is not published.

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, CORNING/NGPL ADA (Natural Gas Pipeline (NGPL) loc 900107) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/ngpl/900107/