Gas day Nov 26
0.000
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.000
Bcf/d
30-day average
0.000
30 of 30 days posted
30-day high
0.000
Nov 26
30-day low
0.000
Nov 25
Operating capacity
0.050
Bcf/d as posted, evening cycle
Utilization
1%
headroom 99%
Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 26 | 0.000 | +0.000 |
| Nov 25 | 0.000 | +0.000 |
| Nov 24 | 0.000 | +0.000 |
| Nov 23 | 0.000 | +0.000 |
| Nov 22 | 0.000 | +0.000 |
| Nov 21 | 0.000 | +0.000 |
| Nov 20 | 0.000 | +0.000 |
| Nov 19 | 0.000 | +0.000 |
| Nov 18 | 0.000 | +0.000 |
| Nov 17 | 0.000 | +0.000 |
| Nov 16 | 0.000 | +0.000 |
| Nov 15 | 0.000 | +0.000 |
| Nov 14 | 0.000 | +0.000 |
| Nov 13 | 0.000 | +0.000 |
| Nov 12 | 0.000 | +0.000 |
| Nov 11 | 0.000 | +0.000 |
| Nov 10 | 0.000 | +0.000 |
| Nov 9 | 0.000 | +0.000 |
| Nov 8 | 0.000 | +0.000 |
| Nov 7 | 0.000 | +0.000 |
| Nov 6 | 0.000 | +0.000 |
| Nov 5 | 0.000 | +0.000 |
| Nov 4 | 0.000 | +0.000 |
| Nov 3 | 0.000 | -0.000 |
| Nov 2 | 0.000 | +0.000 |
| Nov 1 | 0.000 | +0.000 |
| Oct 31 | 0.000 | +0.000 |
| Oct 30 | 0.000 | +0.000 |
| Oct 29 | 0.000 | +0.000 |
| Oct 28 | 0.000 | — |
84 more days on file for this meter, back to August 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Natural Gas Pipeline (NGPL)Placed at the center of Fort Bend, TX — approximate; the exact meter site is not published.
Notices
Recent notices on Natural Gas Pipeline (NGPL)
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →
Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other LDC Citygate meters on Natural Gas Pipeline (NGPL)
- PGLC/NGPL CDP 0.632 Bcf/d
- NICORGAS/NGPL CDP 0.563 Bcf/d
- NIPSCO/NGPL CDP 0.551 Bcf/d
- MIDAMER/NGPL CDP 0.217 Bcf/d
- NO SHORE/NGPL CDP 0.113 Bcf/d
- AMER IL/NGPL GC CDP 0.075 Bcf/d
- AMER IL/NGPL AM CDP 0.072 Bcf/d
- IPLC/NGPL CDP 0.034 Bcf/d
Cite thisEnercast PipeScrape, SIENERGY/NGPL TAMARRON FORT BEND (Natural Gas Pipeline (NGPL) loc 47760) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/ngpl/47760/