Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

LONESTAR/NGPL LA

Natural Gas Pipeline (NGPL) · Loc 905582
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.000
Bcf/d scheduled
Δ Day-over-day
-0.025
vs Nov 26
7-day average
0.018
Bcf/d
30-day average
0.023
30 of 30 days posted
30-day high
0.048
Nov 9
30-day low
0.000
Nov 27
Operating capacity
0.106
Bcf/d as posted, evening cycle
Utilization
0%
headroom 100%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0200.0400.060Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.000-0.025
Nov 260.025-0.020
Nov 250.045+0.005
Nov 240.040+0.023
Nov 230.017+0.017
Nov 220.000+0.000
Nov 210.000+0.000
Nov 200.000-0.018
Nov 190.018+0.000
Nov 180.018+0.013
Nov 170.005-0.010
Nov 160.015+0.000
Nov 150.015+0.015
Nov 140.000-0.022
Nov 130.022-0.018
Nov 120.040+0.000
Nov 110.040+0.001
Nov 100.039-0.009
Nov 90.048+0.008
Nov 80.040+0.000
Nov 70.040+0.013
Nov 60.027+0.002
Nov 50.025+0.025
Nov 40.000-0.037
Nov 30.037+0.013
Nov 20.023+0.005
Nov 10.018-0.001
Oct 310.019-0.021
Oct 300.040+0.014
Oct 290.026—
85 more days on file for this meter, back to August 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)LONESTAR/NGPL LA

Natural Gas Pipeline (NGPL)Placed at the center of Lamar, TX — approximate; the exact meter site is not published.

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, LONESTAR/NGPL LA (Natural Gas Pipeline (NGPL) loc 905582) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/ngpl/905582/