Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

CIPCO/NGPL CENTRAL IOWA POWER CO-OP

Natural Gas Pipeline (NGPL) · Loc 39548
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.000
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.002
Bcf/d
30-day average
0.001
30 of 30 days posted
30-day high
0.006
Nov 23
30-day low
0.000
Nov 27
Operating capacity
0.046
Bcf/d as posted, evening cycle
Utilization
1%
headroom 99%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0020.0040.006Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.000+0.000
Nov 260.000-0.001
Nov 250.001-0.002
Nov 240.003-0.003
Nov 230.006+0.005
Nov 220.001+0.001
Nov 210.000+0.000
Nov 200.000-0.001
Nov 190.001+0.001
Nov 180.000+0.000
Nov 170.000+0.000
Nov 160.000-0.001
Nov 150.001+0.000
Nov 140.001-0.001
Nov 130.002+0.000
Nov 120.002+0.002
Nov 110.000-0.001
Nov 100.002+0.000
Nov 90.002+0.001
Nov 80.001-0.000
Nov 70.001-0.002
Nov 60.003+0.001
Nov 50.002+0.001
Nov 40.001+0.000
Nov 30.000+0.000
Nov 20.000+0.000
Nov 10.000+0.000
Oct 310.000+0.000
Oct 300.000+0.000
Oct 290.000—
85 more days on file for this meter, back to August 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)CIPCO/NGPL CENTRAL IOWA POWER CO-OP

Natural Gas Pipeline (NGPL)Placed at the center of Adair, IA — approximate; the exact meter site is not published.

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, CIPCO/NGPL CENTRAL IOWA POWER CO-OP (Natural Gas Pipeline (NGPL) loc 39548) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/ngpl/39548/