LEE CTY/NGPL POWER PLANT LEE

Natural Gas Pipeline (NGPL) · Loc 37329
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.007
Bcf/d scheduled
Δ Day-over-day
+0.007
vs Nov 26
7-day average
0.001
Bcf/d
30-day average
0.000
30 of 30 days posted
30-day high
0.007
Nov 27
30-day low
0.000
Nov 26
Operating capacity
0.206
Bcf/d as posted, evening cycle
Utilization
3%
headroom 97%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0020.0040.0060.008Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.007+0.007
Nov 260.000+0.000
Nov 250.000+0.000
Nov 240.000+0.000
Nov 230.000+0.000
Nov 220.000+0.000
Nov 210.000+0.000
Nov 200.000+0.000
Nov 190.000-0.001
Nov 180.001-0.001
Nov 170.002+0.002
Nov 160.000+0.000
Nov 150.000+0.000
Nov 140.000+0.000
Nov 130.000+0.000
Nov 120.000-0.003
Nov 110.003+0.003
Nov 100.000+0.000
Nov 90.000+0.000
Nov 80.000+0.000
Nov 70.000+0.000
Nov 60.000+0.000
Nov 50.000+0.000
Nov 40.000+0.000
Nov 30.000+0.000
Nov 20.000+0.000
Nov 10.000+0.000
Oct 310.000+0.000
Oct 300.000+0.000
Oct 290.000—
85 more days on file for this meter, back to August 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)LEE CTY/NGPL POWER PLANT LEE

Natural Gas Pipeline (NGPL)Plant location from EIA Form 860 (plant 55236).

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…