HOLLAND/NGPL HOLLAND ENERGY PLANT S

Natural Gas Pipeline (NGPL) · Loc 39845
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.078
Bcf/d scheduled
Δ Day-over-day
-0.001
vs Nov 26
7-day average
0.080
Bcf/d
30-day average
0.079
30 of 30 days posted
30-day high
0.083
Nov 25
30-day low
0.059
Nov 18
Operating capacity
0.207
Bcf/d as posted, evening cycle
Utilization
38%
headroom 62%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0250.0500.0750.100Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.078-0.001
Nov 260.079-0.003
Nov 250.083+0.002
Nov 240.080-0.001
Nov 230.081-0.000
Nov 220.081+0.007
Nov 210.074-0.005
Nov 200.079-0.003
Nov 190.082+0.023
Nov 180.059-0.023
Nov 170.082+0.000
Nov 160.082-0.000
Nov 150.082+0.000
Nov 140.082-0.001
Nov 130.083+0.001
Nov 120.082+0.000
Nov 110.081-0.001
Nov 100.082+0.001
Nov 90.081+0.000
Nov 80.081-0.000
Nov 70.081-0.001
Nov 60.082+0.002
Nov 50.080+0.004
Nov 40.076-0.003
Nov 30.079-0.000
Nov 20.079+0.000
Nov 10.079+0.001
Oct 310.078+0.003
Oct 300.075-0.004
Oct 290.079—
85 more days on file for this meter, back to August 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)HOLLAND/NGPL HOLLAND ENERGY PLANT S

Natural Gas Pipeline (NGPL)Plant location from EIA Form 860 (plant 55334).

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…