Gas day Nov 27
0.069
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.073
Bcf/d
30-day average
0.070
30 of 30 days posted
30-day high
0.114
Nov 9
30-day low
0.030
Nov 1
Operating capacity
0.197
Bcf/d as posted, evening cycle
Utilization
35%
headroom 65%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.050.100.15Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.069+0.000
Nov 260.069-0.035
Nov 250.104+0.000
Nov 240.104+0.030
Nov 230.074+0.025
Nov 220.050+0.010
Nov 210.040+0.000
Nov 200.040-0.035
Nov 190.074+0.015
Nov 180.060+0.020
Nov 170.040-0.025
Nov 160.065+0.010
Nov 150.055+0.020
Nov 140.035-0.005
Nov 130.040-0.045
Nov 120.084+0.000
Nov 110.084-0.025
Nov 100.109-0.005
Nov 90.114+0.000
Nov 80.114+0.000
Nov 70.114+0.005
Nov 60.109+0.035
Nov 50.074+0.010
Nov 40.064-0.010
Nov 30.074+0.035
Nov 20.040+0.010
Nov 10.030-0.020
Oct 310.050-0.025
Oct 300.074+0.015
Oct 290.059—
85 more days on file for this meter, back to August 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)SPS/NGPL BRICKPLANT RD HARRINGTON D

Natural Gas Pipeline (NGPL)Plant location from EIA Form 860 (plant 6193).

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, SPS/NGPL BRICKPLANT RD HARRINGTON D (Natural Gas Pipeline (NGPL) loc 56494) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/ngpl/56494/