Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

INVENERG/NGPL INVENERGY NELSON LEE

Natural Gas Pipeline (NGPL) · Loc 56331
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.075
Bcf/d scheduled
Δ Day-over-day
-0.011
vs Nov 26
7-day average
0.077
Bcf/d
30-day average
0.081
30 of 30 days posted
30-day high
0.100
Nov 15
30-day low
0.042
Nov 21
Operating capacity
0.107
Bcf/d as posted, evening cycle
Utilization
70%
headroom 30%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0250.0500.0750.100Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.075-0.011
Nov 260.086-0.008
Nov 250.093-0.006
Nov 240.100+0.003
Nov 230.097+0.054
Nov 220.043+0.001
Nov 210.042-0.011
Nov 200.053-0.038
Nov 190.091+0.028
Nov 180.063+0.006
Nov 170.057-0.031
Nov 160.088-0.012
Nov 150.100+0.000
Nov 140.100+0.003
Nov 130.097+0.002
Nov 120.096+0.016
Nov 110.080-0.012
Nov 100.092+0.005
Nov 90.087+0.015
Nov 80.072+0.003
Nov 70.069-0.024
Nov 60.093+0.020
Nov 50.073+0.003
Nov 40.070-0.014
Nov 30.084+0.023
Nov 20.061-0.033
Nov 10.094+0.001
Oct 310.093-0.000
Oct 300.093-0.000
Oct 290.094—
85 more days on file for this meter, back to August 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)INVENERG/NGPL INVENERGY NELSON LEE

Natural Gas Pipeline (NGPL)Plant location from EIA Form 860 (plant 55183).

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, INVENERG/NGPL INVENERGY NELSON LEE (Natural Gas Pipeline (NGPL) loc 56331) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/ngpl/56331/