Natural Gas Pipeline (NGPL) · Loc 56332
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.033
Bcf/d scheduled
Δ Day-over-day
+0.033
vs Nov 26
7-day average
0.034
Bcf/d
30-day average
0.031
30 of 30 days posted
30-day high
0.076
Nov 13
30-day low
0.000
Nov 26
Operating capacity
0.100
Bcf/d as posted, evening cycle
Utilization
33%
headroom 67%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0200.0400.0600.080Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.033+0.033
Nov 260.000-0.040
Nov 250.040-0.027
Nov 240.067-0.005
Nov 230.072+0.059
Nov 220.013+0.000
Nov 210.013+0.013
Nov 200.000-0.042
Nov 190.042+0.042
Nov 180.000-0.033
Nov 170.033-0.015
Nov 160.047-0.017
Nov 150.064-0.012
Nov 140.076-0.000
Nov 130.076+0.005
Nov 120.071+0.030
Nov 110.041+0.002
Nov 100.039+0.017
Nov 90.022-0.006
Nov 80.028+0.008
Nov 70.020-0.018
Nov 60.038+0.031
Nov 50.007+0.007
Nov 40.000+0.000
Nov 30.000+0.000
Nov 20.000+0.000
Nov 10.000+0.000
Oct 310.000-0.036
Oct 300.036-0.023
Oct 290.060—
85 more days on file for this meter, back to August 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)INVENERG/NGPL INVENERGY NELSON EXPA

Natural Gas Pipeline (NGPL)Plant location from EIA Form 860 (plant 55183).

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, INVENERG/NGPL INVENERGY NELSON EXPA (Natural Gas Pipeline (NGPL) loc 56332) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/ngpl/56332/