KIOWA PP/NGPL KIAMICHI POWER PLANT

Natural Gas Pipeline (NGPL) · Loc 49479
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.149
Bcf/d scheduled
Δ Day-over-day
-0.030
vs Nov 26
7-day average
0.145
Bcf/d
30-day average
0.080
30 of 30 days posted
30-day high
0.202
Nov 24
30-day low
0.000
Nov 6
Operating capacity
0.253
Bcf/d as posted, evening cycle
Utilization
59%
headroom 41%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.100.200.30Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.149-0.030
Nov 260.179-0.011
Nov 250.190-0.012
Nov 240.202+0.022
Nov 230.180+0.108
Nov 220.072+0.032
Nov 210.040+0.000
Nov 200.040-0.111
Nov 190.151-0.028
Nov 180.180+0.055
Nov 170.125-0.020
Nov 160.145+0.005
Nov 150.140+0.030
Nov 140.110-0.002
Nov 130.112+0.037
Nov 120.076-0.008
Nov 110.084+0.014
Nov 100.070+0.030
Nov 90.040+0.000
Nov 80.040+0.037
Nov 70.003+0.003
Nov 60.000+0.000
Nov 50.000+0.000
Nov 40.000+0.000
Nov 30.000+0.000
Nov 20.000+0.000
Nov 10.000+0.000
Oct 310.000+0.000
Oct 300.000-0.059
Oct 290.059—
85 more days on file for this meter, back to August 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)KIOWA PP/NGPL KIAMICHI POWER PLANT

Natural Gas Pipeline (NGPL)Plant location from EIA Form 860 (plant 55501).

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, KIOWA PP/NGPL KIAMICHI POWER PLANT (Natural Gas Pipeline (NGPL) loc 49479) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/ngpl/49479/