Gas day Nov 27
0.000
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.000
Bcf/d
30-day average
0.001
30 of 30 days posted
30-day high
0.010
Nov 5
30-day low
0.000
Nov 27
Operating capacity
0.428
Bcf/d as posted, evening cycle
Utilization
0%
headroom 100%
Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 27 | 0.000 | +0.000 |
| Nov 26 | 0.000 | +0.000 |
| Nov 25 | 0.000 | +0.000 |
| Nov 24 | 0.000 | +0.000 |
| Nov 23 | 0.000 | +0.000 |
| Nov 22 | 0.000 | +0.000 |
| Nov 21 | 0.000 | +0.000 |
| Nov 20 | 0.000 | +0.000 |
| Nov 19 | 0.000 | +0.000 |
| Nov 18 | 0.000 | +0.000 |
| Nov 17 | 0.000 | +0.000 |
| Nov 16 | 0.000 | +0.000 |
| Nov 15 | 0.000 | +0.000 |
| Nov 14 | 0.000 | +0.000 |
| Nov 13 | 0.000 | +0.000 |
| Nov 12 | 0.000 | +0.000 |
| Nov 11 | 0.000 | -0.003 |
| Nov 10 | 0.003 | +0.003 |
| Nov 9 | 0.000 | +0.000 |
| Nov 8 | 0.000 | -0.004 |
| Nov 7 | 0.004 | +0.004 |
| Nov 6 | 0.000 | -0.010 |
| Nov 5 | 0.010 | +0.010 |
| Nov 4 | 0.000 | +0.000 |
| Nov 3 | 0.000 | +0.000 |
| Nov 2 | 0.000 | +0.000 |
| Nov 1 | 0.000 | +0.000 |
| Oct 31 | 0.000 | +0.000 |
| Oct 30 | 0.000 | -0.010 |
| Oct 29 | 0.010 | — |
85 more days on file for this meter, back to August 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Natural Gas Pipeline (NGPL)Plant location from EIA Form 860 (plant 55279).
Notices
Recent notices on Natural Gas Pipeline (NGPL)
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →
Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Power Generation meters on Natural Gas Pipeline (NGPL)
- KIOWA PP/NGPL KIAMICHI POWER PLANT 0.149 Bcf/d
- HOLLAND/NGPL HOLLAND ENERGY PLANT S 0.078 Bcf/d
- INVENERG/NGPL INVENERGY NELSON LEE 0.075 Bcf/d
- SPS/NGPL BRICKPLANT RD HARRINGTON D 0.069 Bcf/d
- INVENERG/NGPL INVENERGY NELSON EXPA 0.033 Bcf/d
- E TX ELE/NGPL ETEC UNIT#1 SAN JACIN 0.009 Bcf/d
- LEE CTY/NGPL POWER PLANT LEE 0.007 Bcf/d
- CIPCO/NGPL CENTRAL IOWA POWER CO-OP 0.000 Bcf/d
Cite thisEnercast PipeScrape, AURORA/NGPL LSP DU PAGE (Natural Gas Pipeline (NGPL) loc 37435) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/ngpl/37435/