Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

E TX ELE/NGPL ENTERGY UNIT#2 SAN JA

Natural Gas Pipeline (NGPL) · Loc 48382
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.000
Bcf/d scheduled
Δ Day-over-day
-0.010
vs Nov 26
7-day average
0.007
Bcf/d
30-day average
0.005
30 of 30 days posted
30-day high
0.018
Nov 16
30-day low
0.000
Nov 27
Operating capacity
0.044
Bcf/d as posted, evening cycle
Utilization
0%
headroom 100%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0050.0100.0150.020Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.000-0.010
Nov 260.010-0.005
Nov 250.015+0.001
Nov 240.013+0.013
Nov 230.000-0.006
Nov 220.006+0.002
Nov 210.003-0.001
Nov 200.004+0.001
Nov 190.003+0.003
Nov 180.000-0.010
Nov 170.010-0.008
Nov 160.018+0.011
Nov 150.008+0.008
Nov 140.000-0.010
Nov 130.010+0.010
Nov 120.000+0.000
Nov 110.000+0.000
Nov 100.000+0.000
Nov 90.000+0.000
Nov 80.000+0.000
Nov 70.000-0.003
Nov 60.003-0.003
Nov 50.006-0.007
Nov 40.013+0.000
Nov 30.013+0.006
Nov 20.006-0.001
Nov 10.008+0.003
Oct 310.005+0.000
Oct 300.004+0.001
Oct 290.004—
85 more days on file for this meter, back to August 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)E TX ELE/NGPL ENTERGY UNIT#2 SAN JA

Natural Gas Pipeline (NGPL)Placed at the center of Sanjacinto, TX — approximate; the exact meter site is not published.

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, E TX ELE/NGPL ENTERGY UNIT#2 SAN JA (Natural Gas Pipeline (NGPL) loc 48382) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/ngpl/48382/