Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

AECC/NGPL WRIGHTSVILLE - FULTON CDP

Natural Gas Pipeline (NGPL) · Loc 42390
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.000
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.030
Bcf/d
30-day average
0.022
30 of 30 days posted
30-day high
0.067
Nov 24
30-day low
0.000
Nov 27
Operating capacity
0.120
Bcf/d as posted, evening cycle
Utilization
0%
headroom 100%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0200.0400.0600.080Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.000+0.000
Nov 260.000-0.034
Nov 250.034-0.033
Nov 240.067+0.020
Nov 230.048+0.011
Nov 220.036+0.009
Nov 210.027+0.027
Nov 200.000-0.025
Nov 190.025+0.005
Nov 180.020+0.020
Nov 170.000-0.019
Nov 160.019+0.003
Nov 150.016+0.016
Nov 140.000-0.019
Nov 130.019-0.002
Nov 120.021+0.007
Nov 110.014-0.013
Nov 100.027-0.001
Nov 90.028+0.013
Nov 80.015+0.003
Nov 70.012-0.045
Nov 60.057-0.005
Nov 50.062+0.042
Nov 40.020+0.006
Nov 30.014+0.014
Nov 20.000-0.014
Nov 10.014-0.008
Oct 310.021-0.000
Oct 300.021-0.010
Oct 290.031—
85 more days on file for this meter, back to August 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)AECC/NGPL WRIGHTSVILLE - FULTON CDP

Natural Gas Pipeline (NGPL)Plant location from EIA Form 860 (plant 7825).

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, AECC/NGPL WRIGHTSVILLE - FULTON CDP (Natural Gas Pipeline (NGPL) loc 42390) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/ngpl/42390/