Gas day Nov 27
0.080
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.050
Bcf/d
30-day average
0.055
30 of 30 days posted
30-day high
0.151
Nov 16
30-day low
0.000
Nov 22
Operating capacity
0.410
Bcf/d as posted, evening cycle
Utilization
19%
headroom 81%
Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 27 | 0.080 | +0.000 |
| Nov 26 | 0.080 | +0.000 |
| Nov 25 | 0.080 | +0.009 |
| Nov 24 | 0.070 | +0.032 |
| Nov 23 | 0.038 | +0.038 |
| Nov 22 | 0.000 | +0.000 |
| Nov 21 | 0.000 | +0.000 |
| Nov 20 | 0.000 | +0.000 |
| Nov 19 | 0.000 | -0.120 |
| Nov 18 | 0.120 | +0.001 |
| Nov 17 | 0.119 | -0.032 |
| Nov 16 | 0.151 | +0.035 |
| Nov 15 | 0.117 | +0.017 |
| Nov 14 | 0.100 | -0.014 |
| Nov 13 | 0.114 | +0.040 |
| Nov 12 | 0.074 | +0.074 |
| Nov 11 | 0.000 | +0.000 |
| Nov 10 | 0.000 | -0.011 |
| Nov 9 | 0.011 | -0.080 |
| Nov 8 | 0.091 | +0.000 |
| Nov 7 | 0.091 | +0.067 |
| Nov 6 | 0.025 | +0.025 |
| Nov 5 | 0.000 | -0.025 |
| Nov 4 | 0.025 | -0.029 |
| Nov 3 | 0.054 | +0.029 |
| Nov 2 | 0.025 | -0.020 |
| Nov 1 | 0.045 | -0.005 |
| Oct 31 | 0.050 | +0.000 |
| Oct 30 | 0.050 | -0.000 |
| Oct 29 | 0.050 | — |
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Tennessee Gas PipelinePlant location from EIA Form 860 (plant 3399).
Notices
Recent notices on Tennessee Gas Pipeline (TGP)
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →
Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Power Generation meters on Tennessee Gas Pipeline (TGP)
- BBT BAMA/TGP BAMAGAS COLBERT 0.248 Bcf/d
- HICKORYR/TGP MOHAWK ROAD POWER PLT 0.166 Bcf/d
- TVA/TGP JOHNSONVILLE HICKMAN 0.137 Bcf/d
- COOPERAT/TGP BATESVILLE PANOLA 0.135 Bcf/d
- CARROLL/TGP COUNTY HOME CARROLL 0.115 Bcf/d
- TVA/TGP MAGNOLIA BENTON 0.100 Bcf/d
- NRGBM/TGP BEIRNE HILL SALES BRADFOR 0.096 Bcf/d
- CAL GEN/TGP LOWN 0.095 Bcf/d
Cite thisEnercast PipeScrape, TVA/TGP CUMBERLAND DELIVERY STEWART (Tennessee Gas Pipeline (TGP) loc 57619) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/57619/