Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

TVA/TGP CUMBERLAND DELIVERY STEWART

Tennessee Gas Pipeline (TGP) · Loc 57619
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.080
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.050
Bcf/d
30-day average
0.055
30 of 30 days posted
30-day high
0.151
Nov 16
30-day low
0.000
Nov 22
Operating capacity
0.410
Bcf/d as posted, evening cycle
Utilization
19%
headroom 81%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.050.100.150.20Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.080+0.000
Nov 260.080+0.000
Nov 250.080+0.009
Nov 240.070+0.032
Nov 230.038+0.038
Nov 220.000+0.000
Nov 210.000+0.000
Nov 200.000+0.000
Nov 190.000-0.120
Nov 180.120+0.001
Nov 170.119-0.032
Nov 160.151+0.035
Nov 150.117+0.017
Nov 140.100-0.014
Nov 130.114+0.040
Nov 120.074+0.074
Nov 110.000+0.000
Nov 100.000-0.011
Nov 90.011-0.080
Nov 80.091+0.000
Nov 70.091+0.067
Nov 60.025+0.025
Nov 50.000-0.025
Nov 40.025-0.029
Nov 30.054+0.029
Nov 20.025-0.020
Nov 10.045-0.005
Oct 310.050+0.000
Oct 300.050-0.000
Oct 290.050—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineTVA/TGP CUMBERLAND DELIVERY STEWART

Tennessee Gas PipelinePlant location from EIA Form 860 (plant 3399).

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, TVA/TGP CUMBERLAND DELIVERY STEWART (Tennessee Gas Pipeline (TGP) loc 57619) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/57619/