Gas day Nov 27
0.248
Bcf/d scheduled
Δ Day-over-day
-0.040
vs Nov 26
7-day average
0.267
Bcf/d
30-day average
0.261
30 of 30 days posted
30-day high
0.294
Nov 23
30-day low
0.230
Oct 31
Operating capacity
0.338
Bcf/d as posted, evening cycle
Utilization
73%
headroom 27%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.100.200.30Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.248-0.040
Nov 260.288+0.016
Nov 250.272-0.001
Nov 240.273-0.021
Nov 230.294+0.041
Nov 220.253+0.010
Nov 210.243+0.008
Nov 200.235-0.027
Nov 190.262-0.032
Nov 180.294+0.012
Nov 170.282+0.009
Nov 160.273+0.005
Nov 150.268-0.015
Nov 140.283+0.014
Nov 130.269-0.013
Nov 120.282+0.000
Nov 110.282+0.014
Nov 100.267+0.027
Nov 90.240-0.000
Nov 80.241+0.000
Nov 70.241-0.030
Nov 60.271+0.005
Nov 50.266+0.017
Nov 40.249+0.017
Nov 30.232-0.015
Nov 20.247+0.005
Nov 10.242+0.013
Oct 310.230-0.008
Oct 300.238-0.019
Oct 290.257—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineBBT BAMA/TGP BAMAGAS COLBERT

Tennessee Gas PipelinePlant location from EIA Form 860 (plant 47).

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, BBT BAMA/TGP BAMAGAS COLBERT (Tennessee Gas Pipeline (TGP) loc 420942) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/420942/