Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

COOPERAT/TGP BATESVILLE PANOLA

Tennessee Gas Pipeline (TGP) · Loc 420900
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.135
Bcf/d scheduled
Δ Day-over-day
-0.005
vs Nov 26
7-day average
0.143
Bcf/d
30-day average
0.088
30 of 30 days posted
30-day high
0.150
Nov 25
30-day low
0.000
Nov 4
Operating capacity
0.324
Bcf/d as posted, evening cycle
Utilization
42%
headroom 58%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.050.100.15Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.135-0.005
Nov 260.140-0.010
Nov 250.150+0.000
Nov 240.150+0.005
Nov 230.145+0.002
Nov 220.143+0.008
Nov 210.135+0.000
Nov 200.135+0.000
Nov 190.135+0.005
Nov 180.130-0.010
Nov 170.140+0.020
Nov 160.120+0.000
Nov 150.120+0.008
Nov 140.112-0.003
Nov 130.115-0.001
Nov 120.116+0.001
Nov 110.115-0.015
Nov 100.130+0.020
Nov 90.110+0.038
Nov 80.072+0.012
Nov 70.060+0.030
Nov 60.030+0.023
Nov 50.007+0.007
Nov 40.000+0.000
Nov 30.000+0.000
Nov 20.000+0.000
Nov 10.000+0.000
Oct 310.000+0.000
Oct 300.000+0.000
Oct 290.000—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineCOOPERAT/TGP BATESVILLE PANOLA

Tennessee Gas PipelinePlant location from EIA Form 860 (plant 55063).

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, COOPERAT/TGP BATESVILLE PANOLA (Tennessee Gas Pipeline (TGP) loc 420900) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/420900/