Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

CAL GEN/TGP LOWN

Tennessee Gas Pipeline (TGP) · Loc 421003
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.095
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.065
Bcf/d
30-day average
0.026
30 of 30 days posted
30-day high
0.095
Nov 27
30-day low
0.000
Nov 17
Operating capacity
0.195
Bcf/d as posted, evening cycle
Utilization
49%
headroom 51%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0250.0500.0750.100Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.095+0.000
Nov 260.095+0.015
Nov 250.080+0.035
Nov 240.045+0.000
Nov 230.045+0.000
Nov 220.045+0.000
Nov 210.045+0.000
Nov 200.045+0.000
Nov 190.045+0.015
Nov 180.030+0.030
Nov 170.000-0.030
Nov 160.030+0.030
Nov 150.000+0.000
Nov 140.000-0.021
Nov 130.021+0.021
Nov 120.000-0.045
Nov 110.045+0.025
Nov 100.020+0.020
Nov 90.000+0.000
Nov 80.000+0.000
Nov 70.000+0.000
Nov 60.000+0.000
Nov 50.000+0.000
Nov 40.000-0.019
Nov 30.019+0.019
Nov 20.000+0.000
Nov 10.000-0.023
Oct 310.023+0.000
Oct 300.023-0.004
Oct 290.027—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineCAL GEN/TGP LOWN

Tennessee Gas PipelinePlaced at the center of Lowndes, MS — approximate; the exact meter site is not published.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, CAL GEN/TGP LOWN (Tennessee Gas Pipeline (TGP) loc 421003) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/421003/