Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

CARROLL/TGP COUNTY HOME CARROLL

Tennessee Gas Pipeline (TGP) · Loc 49198
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.115
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.115
Bcf/d
30-day average
0.115
30 of 30 days posted
30-day high
0.120
Nov 9
30-day low
0.110
Nov 20
Operating capacity
0.122
Bcf/d as posted, evening cycle
Utilization
94%
headroom 6%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.050.100.15Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.115+0.000
Nov 260.115+0.000
Nov 250.115+0.000
Nov 240.115+0.000
Nov 230.115+0.000
Nov 220.115+0.000
Nov 210.115+0.005
Nov 200.110+0.000
Nov 190.110+0.000
Nov 180.110-0.005
Nov 170.115+0.005
Nov 160.110+0.000
Nov 150.110+0.000
Nov 140.110+0.000
Nov 130.110-0.005
Nov 120.115+0.000
Nov 110.115+0.000
Nov 100.115-0.005
Nov 90.120+0.000
Nov 80.120+0.000
Nov 70.120+0.000
Nov 60.120+0.000
Nov 50.120+0.000
Nov 40.120+0.001
Nov 30.119+0.004
Nov 20.115+0.000
Nov 10.115+0.000
Oct 310.115+0.002
Oct 300.113-0.002
Oct 290.115—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineCARROLL/TGP COUNTY HOME CARROLL

Tennessee Gas PipelinePlant location from EIA Form 860 (plant 59773).

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, CARROLL/TGP COUNTY HOME CARROLL (Tennessee Gas Pipeline (TGP) loc 49198) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/49198/