Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

NRGBM/TGP BEIRNE HILL SALES BRADFOR

Tennessee Gas Pipeline (TGP) · Loc 48061
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.096
Bcf/d scheduled
Δ Day-over-day
-0.000
vs Nov 26
7-day average
0.106
Bcf/d
30-day average
0.113
30 of 30 days posted
30-day high
0.149
Nov 2
30-day low
0.091
Nov 11
Operating capacity
0.154
Bcf/d as posted, evening cycle
Utilization
62%
headroom 38%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.050.100.15Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.096-0.000
Nov 260.096+0.002
Nov 250.094-0.022
Nov 240.115+0.018
Nov 230.097-0.031
Nov 220.128+0.010
Nov 210.118+0.015
Nov 200.103+0.009
Nov 190.095-0.003
Nov 180.098+0.000
Nov 170.098-0.014
Nov 160.112-0.007
Nov 150.119-0.001
Nov 140.120+0.013
Nov 130.107-0.013
Nov 120.120+0.029
Nov 110.091-0.007
Nov 100.098-0.018
Nov 90.116+0.017
Nov 80.099-0.014
Nov 70.113+0.013
Nov 60.100-0.011
Nov 50.111-0.012
Nov 40.123-0.006
Nov 30.129-0.020
Nov 20.149+0.013
Nov 10.136+0.010
Oct 310.126-0.016
Oct 300.142+0.013
Oct 290.129—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineNRGBM/TGP BEIRNE HILL SALES BRADFOR

Tennessee Gas PipelinePlaced at the center of Bradford, PA — approximate; the exact meter site is not published.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, NRGBM/TGP BEIRNE HILL SALES BRADFOR (Tennessee Gas Pipeline (TGP) loc 48061) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/48061/