Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

HICKORYR/TGP MOHAWK ROAD POWER PLT

Tennessee Gas Pipeline (TGP) · Loc 50789
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.166
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.171
Bcf/d
30-day average
0.167
30 of 30 days posted
30-day high
0.174
Nov 5
30-day low
0.146
Nov 12
Operating capacity
0.173
Bcf/d as posted, evening cycle
Utilization
96%
headroom 4%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.050.100.150.20Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.166+0.000
Nov 260.166-0.007
Nov 250.173+0.001
Nov 240.172-0.001
Nov 230.173+0.000
Nov 220.173+0.003
Nov 210.171+0.001
Nov 200.170+0.000
Nov 190.170-0.003
Nov 180.173+0.000
Nov 170.173+0.000
Nov 160.173+0.002
Nov 150.172+0.014
Nov 140.158-0.003
Nov 130.161+0.015
Nov 120.146-0.011
Nov 110.157-0.014
Nov 100.170-0.003
Nov 90.173+0.003
Nov 80.170+0.002
Nov 70.168-0.005
Nov 60.173-0.001
Nov 50.174+0.004
Nov 40.170+0.007
Nov 30.163-0.003
Nov 20.166+0.009
Nov 10.157-0.002
Oct 310.159+0.003
Oct 300.156+0.000
Oct 290.156—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineHICKORYR/TGP MOHAWK ROAD POWER PLT

Tennessee Gas PipelinePlant location from EIA Form 860 (plant 61028).

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, HICKORYR/TGP MOHAWK ROAD POWER PLT (Tennessee Gas Pipeline (TGP) loc 50789) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/50789/