VPP II/TGP OLD BLOOMINGTON POWER 2

Tennessee Gas Pipeline (TGP) · Loc 53655
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.002
Bcf/d scheduled
Δ Day-over-day
-0.000
vs Nov 26
7-day average
0.004
Bcf/d
30-day average
0.009
30 of 30 days posted
30-day high
0.022
Oct 31
30-day low
0.000
Nov 17
Operating capacity
0.021
Bcf/d as posted, evening cycle
Utilization
8%
headroom 92%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0100.0200.030Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.002-0.000
Nov 260.002-0.007
Nov 250.009-0.001
Nov 240.010+0.009
Nov 230.001-0.001
Nov 220.002+0.000
Nov 210.002-0.001
Nov 200.003+0.002
Nov 190.001-0.008
Nov 180.009+0.009
Nov 170.000-0.020
Nov 160.020+0.005
Nov 150.015+0.013
Nov 140.003+0.000
Nov 130.003-0.001
Nov 120.004-0.003
Nov 110.007-0.008
Nov 100.015-0.002
Nov 90.017+0.004
Nov 80.013+0.013
Nov 70.000-0.004
Nov 60.004-0.011
Nov 50.014+0.001
Nov 40.013-0.007
Nov 30.020+0.001
Nov 20.020+0.009
Nov 10.011-0.012
Oct 310.022+0.009
Oct 300.013+0.003
Oct 290.010—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineVPP II/TGP OLD BLOOMINGTON POWER 2

Tennessee Gas PipelinePlaced at the center of Victoria, TX — approximate; the exact meter site is not published.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.