Gas day Nov 27
0.024
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.026
Bcf/d
30-day average
0.023
30 of 30 days posted
30-day high
0.040
Nov 2
30-day low
0.000
Oct 31
Operating capacity
0.092
Bcf/d as posted, evening cycle
Utilization
26%
headroom 74%
Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 27 | 0.024 | +0.000 |
| Nov 26 | 0.024 | -0.001 |
| Nov 25 | 0.025 | -0.007 |
| Nov 24 | 0.032 | +0.007 |
| Nov 23 | 0.025 | +0.000 |
| Nov 22 | 0.025 | +0.000 |
| Nov 21 | 0.025 | +0.005 |
| Nov 20 | 0.020 | +0.000 |
| Nov 19 | 0.020 | +0.000 |
| Nov 18 | 0.020 | -0.005 |
| Nov 17 | 0.025 | -0.005 |
| Nov 16 | 0.030 | +0.000 |
| Nov 15 | 0.030 | +0.000 |
| Nov 14 | 0.030 | +0.002 |
| Nov 13 | 0.028 | -0.004 |
| Nov 12 | 0.032 | -0.006 |
| Nov 11 | 0.038 | +0.006 |
| Nov 10 | 0.032 | +0.012 |
| Nov 9 | 0.020 | +0.012 |
| Nov 8 | 0.008 | +0.000 |
| Nov 7 | 0.008 | -0.004 |
| Nov 6 | 0.012 | -0.023 |
| Nov 5 | 0.035 | +0.000 |
| Nov 4 | 0.035 | +0.003 |
| Nov 3 | 0.032 | -0.008 |
| Nov 2 | 0.040 | +0.033 |
| Nov 1 | 0.007 | +0.007 |
| Oct 31 | 0.000 | +0.000 |
| Oct 30 | 0.000 | +0.000 |
| Oct 29 | 0.000 | — |
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Tennessee Gas PipelinePlaced at the center of Lawrence, PA — approximate; the exact meter site is not published.
Notices
Recent notices on Tennessee Gas Pipeline (TGP)
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →
Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Power Generation meters on Tennessee Gas Pipeline (TGP)
- BBT BAMA/TGP BAMAGAS COLBERT 0.248 Bcf/d
- HICKORYR/TGP MOHAWK ROAD POWER PLT 0.166 Bcf/d
- TVA/TGP JOHNSONVILLE HICKMAN 0.137 Bcf/d
- COOPERAT/TGP BATESVILLE PANOLA 0.135 Bcf/d
- CARROLL/TGP COUNTY HOME CARROLL 0.115 Bcf/d
- TVA/TGP MAGNOLIA BENTON 0.100 Bcf/d
- NRGBM/TGP BEIRNE HILL SALES BRADFOR 0.096 Bcf/d
- CAL GEN/TGP LOWN 0.095 Bcf/d
Cite thisEnercast PipeScrape, HERITAGE/TGP MT JACKSON SALES LAWRE (Tennessee Gas Pipeline (TGP) loc 48939) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/48939/