Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

EMPIREGN/TGP SCHODACK RENSSELAER

Tennessee Gas Pipeline (TGP) · Loc 421070
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.064
Bcf/d scheduled
Δ Day-over-day
-0.050
vs Nov 26
7-day average
0.086
Bcf/d
30-day average
0.076
30 of 30 days posted
30-day high
0.135
Nov 12
30-day low
0.037
Nov 1
Operating capacity
0.162
Bcf/d as posted, evening cycle
Utilization
39%
headroom 61%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.050.100.15Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.064-0.050
Nov 260.114+0.038
Nov 250.076+0.003
Nov 240.073-0.004
Nov 230.077-0.037
Nov 220.114+0.029
Nov 210.084+0.007
Nov 200.078-0.011
Nov 190.089+0.008
Nov 180.081+0.009
Nov 170.072-0.001
Nov 160.073-0.008
Nov 150.082-0.001
Nov 140.083-0.004
Nov 130.086-0.049
Nov 120.135+0.040
Nov 110.096-0.014
Nov 100.110+0.069
Nov 90.041+0.000
Nov 80.041-0.011
Nov 70.052+0.012
Nov 60.040-0.005
Nov 50.045-0.023
Nov 40.068+0.021
Nov 30.047-0.004
Nov 20.051+0.014
Nov 10.037-0.053
Oct 310.090+0.011
Oct 300.079-0.008
Oct 290.087—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineEMPIREGN/TGP SCHODACK RENSSELAER

Tennessee Gas PipelinePlaced at the center of Rensselaer, NY — approximate; the exact meter site is not published.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.