Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

ENTRGYLA/TGP PERRYVILLE POWER OUACH

Tennessee Gas Pipeline (TGP) · Loc 421062
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.003
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.004
Bcf/d
30-day average
0.004
30 of 30 days posted
30-day high
0.010
Nov 25
30-day low
0.000
Nov 19
Operating capacity
0.181
Bcf/d as posted, evening cycle
Utilization
2%
headroom 98%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0030.0050.0070.010Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.003+0.000
Nov 260.003-0.007
Nov 250.010+0.005
Nov 240.005+0.002
Nov 230.003+0.000
Nov 220.003+0.000
Nov 210.003-0.002
Nov 200.005+0.005
Nov 190.000-0.003
Nov 180.003-0.002
Nov 170.005+0.002
Nov 160.003+0.000
Nov 150.003+0.000
Nov 140.003+0.003
Nov 130.000-0.008
Nov 120.008+0.006
Nov 110.002+0.002
Nov 100.000-0.010
Nov 90.010+0.000
Nov 80.010+0.000
Nov 70.010+0.000
Nov 60.010+0.000
Nov 50.010+0.004
Nov 40.006+0.006
Nov 30.000+0.000
Nov 20.000+0.000
Nov 10.000+0.000
Oct 310.000+0.000
Oct 300.000+0.000
Oct 290.000—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineENTRGYLA/TGP PERRYVILLE POWER OUACH

Tennessee Gas PipelinePlant location from EIA Form 860 (plant 55620).

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.