Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

GB II NY/TGP GLENMONT SALES ALBANY

Tennessee Gas Pipeline (TGP) · Loc 421022
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.058
Bcf/d scheduled
Δ Day-over-day
-0.039
vs Nov 26
7-day average
0.073
Bcf/d
30-day average
0.046
30 of 30 days posted
30-day high
0.098
Nov 26
30-day low
0.000
Nov 8
Operating capacity
0.227
Bcf/d as posted, evening cycle
Utilization
26%
headroom 74%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0250.0500.0750.100Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.058-0.039
Nov 260.098+0.022
Nov 250.075+0.018
Nov 240.058-0.028
Nov 230.085+0.000
Nov 220.085+0.035
Nov 210.050-0.015
Nov 200.065-0.017
Nov 190.082+0.008
Nov 180.073+0.013
Nov 170.061-0.006
Nov 160.067+0.011
Nov 150.057-0.011
Nov 140.068+0.014
Nov 130.053+0.028
Nov 120.025-0.011
Nov 110.036+0.009
Nov 100.027+0.019
Nov 90.008+0.008
Nov 80.000-0.024
Nov 70.024+0.014
Nov 60.010-0.005
Nov 50.015-0.021
Nov 40.036+0.027
Nov 30.009-0.018
Nov 20.027+0.002
Nov 10.025-0.000
Oct 310.025+0.000
Oct 300.025-0.015
Oct 290.040—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineGB II NY/TGP GLENMONT SALES ALBANY

Tennessee Gas PipelinePlaced at the center of Albany, NY — approximate; the exact meter site is not published.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, GB II NY/TGP GLENMONT SALES ALBANY (Tennessee Gas Pipeline (TGP) loc 421022) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/421022/