Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

LIBERTYU/TGP GRANITE RIDGE ROCKINGH

Tennessee Gas Pipeline (TGP) · Loc 420931
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.038
Bcf/d scheduled
Δ Day-over-day
-0.020
vs Nov 26
7-day average
0.054
Bcf/d
30-day average
0.038
30 of 30 days posted
30-day high
0.117
Nov 3
30-day low
0.000
Nov 19
Operating capacity
0.130
Bcf/d as posted, evening cycle
Utilization
29%
headroom 71%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.050.100.15Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.038-0.020
Nov 260.058+0.002
Nov 250.056+0.000
Nov 240.056-0.000
Nov 230.056-0.003
Nov 220.059+0.001
Nov 210.058+0.049
Nov 200.009+0.009
Nov 190.000+0.000
Nov 180.000+0.000
Nov 170.000+0.000
Nov 160.000+0.000
Nov 150.000+0.000
Nov 140.000-0.003
Nov 130.003-0.007
Nov 120.010+0.000
Nov 110.010+0.010
Nov 100.000+0.000
Nov 90.000+0.000
Nov 80.000+0.000
Nov 70.000-0.058
Nov 60.058-0.041
Nov 50.099-0.006
Nov 40.105-0.012
Nov 30.117+0.059
Nov 20.058+0.004
Nov 10.054-0.024
Oct 310.078-0.005
Oct 300.083+0.005
Oct 290.078—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineLIBERTYU/TGP GRANITE RIDGE ROCKINGH

Tennessee Gas PipelinePlant location from EIA Form 860 (plant 55170).

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, LIBERTYU/TGP GRANITE RIDGE ROCKINGH (Tennessee Gas Pipeline (TGP) loc 420931) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/420931/