RISEC/TGP FPLE RISE PROVIDENCE

Tennessee Gas Pipeline (TGP) · Loc 420926
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.045
Bcf/d scheduled
Δ Day-over-day
-0.017
vs Nov 26
7-day average
0.051
Bcf/d
30-day average
0.052
30 of 30 days posted
30-day high
0.068
Nov 11
30-day low
0.030
Oct 31
Operating capacity
0.134
Bcf/d as posted, evening cycle
Utilization
34%
headroom 66%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0200.0400.0600.080Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.045-0.017
Nov 260.062+0.013
Nov 250.049-0.001
Nov 240.050+0.002
Nov 230.048+0.007
Nov 220.041-0.020
Nov 210.060+0.003
Nov 200.057+0.002
Nov 190.055-0.000
Nov 180.055+0.002
Nov 170.053-0.003
Nov 160.057+0.009
Nov 150.047-0.001
Nov 140.048-0.010
Nov 130.057-0.008
Nov 120.065-0.003
Nov 110.068+0.011
Nov 100.057+0.006
Nov 90.051+0.001
Nov 80.050-0.000
Nov 70.051+0.017
Nov 60.033-0.019
Nov 50.052-0.013
Nov 40.065+0.005
Nov 30.060+0.001
Nov 20.059+0.014
Nov 10.045+0.015
Oct 310.030-0.013
Oct 300.043-0.012
Oct 290.055—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineRISEC/TGP FPLE RISE PROVIDENCE

Tennessee Gas PipelinePlant location from EIA Form 860 (plant 55107).

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, RISEC/TGP FPLE RISE PROVIDENCE (Tennessee Gas Pipeline (TGP) loc 420926) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/420926/