Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

DYNEGY/TGP BLACKSTONE WORCHESTER

Tennessee Gas Pipeline (TGP) · Loc 420894
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.020
Bcf/d scheduled
Δ Day-over-day
+0.004
vs Nov 26
7-day average
0.021
Bcf/d
30-day average
0.039
30 of 30 days posted
30-day high
0.077
Nov 16
30-day low
0.000
Oct 31
Operating capacity
0.119
Bcf/d as posted, evening cycle
Utilization
17%
headroom 83%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0200.0400.0600.080Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.020+0.004
Nov 260.016-0.019
Nov 250.035-0.010
Nov 240.045+0.045
Nov 230.000-0.015
Nov 220.015+0.000
Nov 210.015-0.015
Nov 200.030-0.007
Nov 190.037-0.026
Nov 180.063-0.002
Nov 170.065-0.012
Nov 160.077+0.003
Nov 150.074+0.000
Nov 140.074-0.001
Nov 130.075+0.008
Nov 120.067-0.000
Nov 110.068+0.028
Nov 100.040-0.001
Nov 90.041+0.026
Nov 80.015-0.025
Nov 70.040-0.024
Nov 60.064-0.012
Nov 50.076+0.033
Nov 40.043+0.013
Nov 30.030+0.025
Nov 20.005-0.002
Nov 10.007+0.007
Oct 310.000-0.008
Oct 300.008-0.007
Oct 290.015—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineDYNEGY/TGP BLACKSTONE WORCHESTER

Tennessee Gas PipelinePlant location from EIA Form 860 (plant 55212).

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, DYNEGY/TGP BLACKSTONE WORCHESTER (Tennessee Gas Pipeline (TGP) loc 420894) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/420894/