Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

MILL POW/TGP MILLENNIUM POWER COGEN

Tennessee Gas Pipeline (TGP) · Loc 420884
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.025
Bcf/d scheduled
Δ Day-over-day
+0.002
vs Nov 26
7-day average
0.043
Bcf/d
30-day average
0.026
30 of 30 days posted
30-day high
0.061
Nov 25
30-day low
0.000
Nov 9
Operating capacity
0.130
Bcf/d as posted, evening cycle
Utilization
19%
headroom 81%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0200.0400.0600.080Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.025+0.002
Nov 260.022-0.038
Nov 250.061+0.010
Nov 240.051-0.002
Nov 230.052+0.010
Nov 220.043-0.002
Nov 210.045+0.022
Nov 200.022-0.021
Nov 190.044-0.007
Nov 180.051+0.009
Nov 170.042-0.016
Nov 160.058-0.001
Nov 150.058-0.000
Nov 140.058-0.003
Nov 130.061+0.019
Nov 120.042+0.011
Nov 110.031+0.023
Nov 100.008+0.008
Nov 90.000+0.000
Nov 80.000+0.000
Nov 70.000+0.000
Nov 60.000-0.002
Nov 50.002+0.002
Nov 40.000+0.000
Nov 30.000+0.000
Nov 20.000+0.000
Nov 10.000+0.000
Oct 310.000+0.000
Oct 300.000+0.000
Oct 290.000—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineMILL POW/TGP MILLENNIUM POWER COGEN

Tennessee Gas PipelinePlant location from EIA Form 860 (plant 55079).

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, MILL POW/TGP MILLENNIUM POWER COGEN (Tennessee Gas Pipeline (TGP) loc 420884) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/420884/