Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

E KY PWR/TGP J K SMITH SALES CLARK

Tennessee Gas Pipeline (TGP) · Loc 420803
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.005
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.005
Bcf/d
30-day average
0.011
30 of 30 days posted
30-day high
0.040
Nov 5
30-day low
0.000
Oct 31
Operating capacity
0.275
Bcf/d as posted, evening cycle
Utilization
2%
headroom 98%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0100.0200.0300.040Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.005+0.000
Nov 260.005+0.000
Nov 250.005+0.000
Nov 240.005+0.000
Nov 230.005+0.000
Nov 220.005+0.000
Nov 210.005-0.005
Nov 200.010+0.000
Nov 190.010+0.000
Nov 180.010+0.000
Nov 170.010+0.000
Nov 160.010+0.005
Nov 150.005+0.000
Nov 140.005+0.000
Nov 130.005+0.000
Nov 120.005-0.020
Nov 110.025+0.000
Nov 100.025-0.010
Nov 90.035+0.030
Nov 80.005+0.000
Nov 70.005+0.000
Nov 60.005-0.035
Nov 50.040+0.035
Nov 40.005+0.000
Nov 30.005-0.022
Nov 20.027+0.022
Nov 10.005+0.005
Oct 310.000-0.010
Oct 300.010-0.030
Oct 290.040—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineE KY PWR/TGP J K SMITH SALES CLARK

Tennessee Gas PipelinePlant location from EIA Form 860 (plant 54).

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, E KY PWR/TGP J K SMITH SALES CLARK (Tennessee Gas Pipeline (TGP) loc 420803) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/420803/