Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

SELKIRK/TGP SELKIRK SMS ALBANY

Tennessee Gas Pipeline (TGP) · Loc 420731
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.004
Bcf/d scheduled
Δ Day-over-day
-0.002
vs Nov 26
7-day average
0.005
Bcf/d
30-day average
0.005
30 of 30 days posted
30-day high
0.013
Nov 19
30-day low
0.000
Nov 23
Operating capacity
0.139
Bcf/d as posted, evening cycle
Utilization
3%
headroom 97%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0050.0100.015Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.004-0.002
Nov 260.006-0.000
Nov 250.006+0.004
Nov 240.003+0.003
Nov 230.000-0.007
Nov 220.007-0.000
Nov 210.007+0.001
Nov 200.006-0.007
Nov 190.013+0.008
Nov 180.004-0.004
Nov 170.008+0.004
Nov 160.004-0.002
Nov 150.006+0.004
Nov 140.002-0.002
Nov 130.004+0.001
Nov 120.003-0.002
Nov 110.004-0.002
Nov 100.006-0.001
Nov 90.007+0.001
Nov 80.006+0.000
Nov 70.006+0.000
Nov 60.005+0.000
Nov 50.005-0.000
Nov 40.005-0.000
Nov 30.005+0.005
Nov 20.000-0.006
Nov 10.006-0.000
Oct 310.006+0.000
Oct 300.006+0.000
Oct 290.006—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineSELKIRK/TGP SELKIRK SMS ALBANY

Tennessee Gas PipelinePlant location from EIA Form 860 (plant 10725).

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational