Tennessee Gas Pipeline (TGP) · Loc 420712
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.000
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.000
Bcf/d
30-day average
0.048
30 of 30 days posted
30-day high
0.155
Nov 3
30-day low
0.000
Nov 27
Operating capacity
0.294
Bcf/d as posted, evening cycle
Utilization
0%
headroom 100%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.050.100.150.20Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.000+0.000
Nov 260.000+0.000
Nov 250.000+0.000
Nov 240.000+0.000
Nov 230.000+0.000
Nov 220.000+0.000
Nov 210.000+0.000
Nov 200.000+0.000
Nov 190.000+0.000
Nov 180.000+0.000
Nov 170.000+0.000
Nov 160.000+0.000
Nov 150.000+0.000
Nov 140.000+0.000
Nov 130.000+0.000
Nov 120.000+0.000
Nov 110.000+0.000
Nov 100.000-0.035
Nov 90.035-0.064
Nov 80.099-0.035
Nov 70.134-0.005
Nov 60.139-0.006
Nov 50.145+0.005
Nov 40.140-0.015
Nov 30.155+0.034
Nov 20.121+0.001
Nov 10.120-0.010
Oct 310.130+0.015
Oct 300.115+0.018
Oct 290.098—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineENT MS/TGP POWER RIVERS SALES WASHI

Tennessee Gas PipelinePlaced at the center of Washington, MS — approximate; the exact meter site is not published.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, ENT MS/TGP POWER RIVERS SALES WASHI (Tennessee Gas Pipeline (TGP) loc 420712) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/420712/