Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

OCEAN ST/TGP PRO

Tennessee Gas Pipeline (TGP) · Loc 420707
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.033
Bcf/d scheduled
Δ Day-over-day
+0.021
vs Nov 26
7-day average
0.013
Bcf/d
30-day average
0.019
30 of 30 days posted
30-day high
0.062
Nov 2
30-day low
0.000
Nov 23
Operating capacity
0.230
Bcf/d as posted, evening cycle
Utilization
14%
headroom 86%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0200.0400.0600.080Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.033+0.021
Nov 260.011+0.010
Nov 250.001-0.042
Nov 240.043+0.043
Nov 230.000-0.003
Nov 220.003+0.000
Nov 210.003+0.003
Nov 200.000+0.000
Nov 190.000+0.000
Nov 180.000-0.035
Nov 170.035+0.035
Nov 160.000+0.000
Nov 150.000-0.001
Nov 140.001-0.033
Nov 130.034+0.033
Nov 120.001-0.009
Nov 110.010-0.016
Nov 100.026+0.002
Nov 90.024+0.000
Nov 80.024+0.000
Nov 70.024+0.024
Nov 60.000-0.035
Nov 50.035-0.026
Nov 40.060+0.012
Nov 30.048-0.014
Nov 20.062+0.042
Nov 10.020-0.014
Oct 310.034+0.006
Oct 300.028+0.004
Oct 290.024—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineOCEAN ST/TGP PRO

Tennessee Gas PipelinePlaced at the center of Providence, RI — approximate; the exact meter site is not published.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, OCEAN ST/TGP PRO (Tennessee Gas Pipeline (TGP) loc 420707) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/420707/