PSEG/TGP RAMSEY NJ BERGEN

Tennessee Gas Pipeline (TGP) · Loc 420226
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.056
Bcf/d scheduled
Δ Day-over-day
+0.006
vs Nov 26
7-day average
0.049
Bcf/d
30-day average
0.037
30 of 30 days posted
30-day high
0.058
Oct 31
30-day low
0.002
Nov 12
Operating capacity
0.173
Bcf/d as posted, evening cycle
Utilization
32%
headroom 68%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0200.0400.060Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.056+0.006
Nov 260.050+0.000
Nov 250.050+0.000
Nov 240.050+0.004
Nov 230.046+0.000
Nov 220.046+0.000
Nov 210.046+0.005
Nov 200.041+0.020
Nov 190.021-0.029
Nov 180.051+0.019
Nov 170.031+0.000
Nov 160.031+0.000
Nov 150.031+0.000
Nov 140.031+0.000
Nov 130.031+0.030
Nov 120.002+0.000
Nov 110.002+0.000
Nov 100.002-0.027
Nov 90.028-0.003
Nov 80.031+0.000
Nov 70.031-0.005
Nov 60.036-0.014
Nov 50.050-0.001
Nov 40.051+0.010
Nov 30.041+0.013
Nov 20.028+0.000
Nov 10.028-0.030
Oct 310.058+0.000
Oct 300.058+0.000
Oct 290.058—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelinePSEG/TGP RAMSEY NJ BERGEN

Tennessee Gas PipelinePlant location from EIA Form 860 (plant 2398).

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

Tennessee Gas Pipeline (TGP) · posted 2026-10-21 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-09-08 · informational
Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, PSEG/TGP RAMSEY NJ BERGEN (Tennessee Gas Pipeline (TGP) loc 420226) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/420226/